Loading...
HomeMy WebLinkAbout20210439 Ver 2_Site Plan_20231027H.- Lake. (At Full Pond/ Normal Water Le el)- vu c O � = v o `o Z in C Side View U- ?c°tt j;g 5hA North Carolina Department of Environmental Quality I DiviSi0n of Water ReSuurces 512'North Salisbury Street 1 1617 Mail Service Center I Raleigh,'North Carolina 27699-1617 919.707.9000 b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) M I, I-vd Full Pond/ Normal Water Level ao .;. Shoreline ale 111o'/ � x �',�a' 6A+� R Plan View { i .�.,.�: CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: 7-A GPI / / C County: Owner: 0U) D UL Print Signa re Contractor/agent: Print Signature The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, Cul 15TI-f , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): r Date: 0 /o