SOIL EROSION AND SEDIMENT CONTROL OFFICE
September 27, 2023
LETTER OF APPROVAL
WITH CONDITIONS
Copart of Connecticut, Inc.
ATTN: Gary Brown
14175 Dallas Parkway
Dallas, Texas 75254
RE: Project Name: Copart-Fletcher
Acres Approved: 38.50
Project ID: SESC 2023-09-01
County: Henderson
City: Town of Fletcher
Address: Mills Gap Rd(35.433861, -82.48775)
River Basin: French Broad River
Stream Classification: Unnamed Tributary of Cane Creek; Cane Creek Class C;
Stream Index 6-57-(9)
Submitted By: Tyler Wagner, PE
Date Received by HC: August 10, 2023
Plan Type: New
Revisions Received September 15, 2023
Dear Mr. Brown,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan shall expire three (3)years following the date of
approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNO1 form to Mike Lawyer at
mike.lawyer@deq.nc.gov. If the owner/operator of this project changes in the future, the new
responsible party is required to apply for his/her own COC.
240 SECOND AVENUE EAST, SUITE 120
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
Letter of Approval
Copart-Fletcher
September 27, 2023
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land-disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
--1- -E Dghv�S f-wv
Assistant Engineer
Soil Erosion& Sedimentation Control Office
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
ec: Tyler Wagner, PE, FEI
Stan Aiken PE, DEQ—Asheville
240 SECOND AVENUE EAST, SUITE 120
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
Letter of Approval
Copart-Fletcher
September 27, 2023
Page 3 of 3
CONDITIONS
• ZONING APPROVAL FROM TIIE JURISDICTION HAVING AUTHORITY.
PROJECT CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS
OFFICE.
• A DRIVEWAY PERMIT REQUIRED FROM THE JURISDICTION HAVING
AUTHORITY (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO
OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE
FILE.
• APPLY FOR NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER
• FOLLOW THE SELF-INSPECTION, RECORDKEEPING AND REPORTING
REQUIREMENTS DESCRIBED ON SHEET 12 OF 13 OF THE APPROVED
DRAWING "COPART-FLETCHER EROSION CONTROL PLAN" AND
REVISIONS DATED SEPTEMBER 15, 2023, WHICH IS INCORPORATED INTO
THIS LETTER OF APPROVAL.
• TIIE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN
TITLED "COPART-FLETCHER EROSION CONTROL PLAN" AND REVISIONS
DATED SEPTEMBER 15, 2023, IS REFERENCED HERE AND INCORPORTED
INTO THIS LETTER OF APPROVAL.
• PRE-CONSTRUCTION MEETING REQUIRED PRIOR TO LAND
DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO
SCHEDULE.