Loading...
HomeMy WebLinkAboutWQ0044810_Final Permit_20231026DocuSign Envelope ID: 7D3AAE5D-16EB-4CF2-A90C-350CD5D4C9B8 ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Brian D. Gower, Chief Executive Officer Charthouse Holdings, LLC 8771-B Cleveland Road Clayton, North Carolina 27520 NORTH CAROLINA Environmental Quality October 26, 2023 Subject: Permit No. WQ0044810 Charthouse Holdings, LLC 8817 Cleveland Road PS & FM Wastewater Collection System Extension Permit Johnston County Dear Mr. Gower: In accordance with your application received October 12, 2023, and additional information received on October, 25 and 26, 2023, we are forwarding herewith Permit No. WQ0044810 dated October 26, 2023, to Charthouse Holdings, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition IIA: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form with checklist attached to this permit shall be submitted with the required supporting documents to the address provided on the form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations, or the Minimum Design Criteria. [15A NCAC 02T.0116] It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This North Cuolma Deprnasmt of Eaviramimtrl Qt Hly I Division of Water mources r.0 D-E Q 919.791,4200 ✓�j Meigh RegooA Office I 3900 Bunn Dnre I Raleigh. North Carolina 27409 DocuSign Envelope ID: 7D3AAE5D-16EB-4CF2-A90C-350CD5D4C9B8 Charthouse Holdings, LLC Permit No. WQ0044810 request must be in the form of a written petition, conforming to Chapter 1SOB of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact the Raleigh Regional Office via e-mail at DEQ.DWR.RRO.FastTracks@deg.nc.gov or 919-791-4200. Sincerely, ocuSigned by: E�D & f, �l.atn.ttit,(,2916E6AB32144F_ for Richard E. Rogers, Jr. Director, Division of Water Resources by Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources, NCDEQ cc: Gary J. McCabe, PE, Red Line Engineering, PC Chandra Farmer, PE, Director, Johnston County Public Utilities Laserfiche Todd Ramsey, Johnston County Health Department Page 2 of 9 DocuSign Envelope ID: 7D3AAE5D-16EB-4CF2-A90C-350CD5D4C9B8 NORTH CAROLINA Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Charthouse Holdings, LLC Johnston County for the construction and operation of approximately a 46—gallon per minute pump station with simplex grinder pump, with a portable power source with manual activation, quick -connection receptacle, and telemetry; as well as approximately 156 linear feet of 2-inch force main to serve a commercial/office facility with 10 units as part of the 8817 Cleaveland Road PS & FM project, and the discharge of 250 gallons per day of collected commercial wastewater into the Johnston County's existing sewerage system, pursuant to the application received October 12, 2023, and additional information received on October 25 and 26, 2023, and in conformity with 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 and updated in March 2008, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. ocuSigned by: E�D & f, �l 4 u�t,(,2916E6AB32144F_ for Richard E. Rogers, Jr. Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0044810 Permit Issued: October 26, 2023 Page 3 of 9 DocuSign Envelope ID: 7D3AAE5D-16EB-4CF2-A90C-350CD5D4C9B8 CERTIFICATION CHECKLIST To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116. Certifying Engineer: Certification Review Date: Project Name: W Q00 Project County: 1) Has permittee information changed since the permit was issued (or last modified): change of mailing address, change of ownership, transfer from developer to HOA/POA, etc. ❑ Yes ❑ No • If yes, please provide either a change of ownership form or new contact information. Note that transfer of permits from the developer to the HOA/POA must occur with the first certification. 2) Have the as -built drawings have been signed, sealed, and dated by an N.C. PE? ❑ Yes ❑ No 3) Final Engineering certification? ❑ Yes ❑ No • If Partial Engineering certification, provide detailed narrative including what is being certified in the current phase, what was previously certified (if applicable), and what is left to be certified. 4) Adequate information related to sewer lines: ❑ Yes ❑ No ❑ N/A • Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines. • Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches). 5) Adequate information related to pump stations: ❑ Yes ❑ No ❑ N/A • Ensure power reliability option was selected per 15A NCAC 02T.0305(h). 6) Was project construction completed in accordance with all of the following: ❑ Yes ❑ No ❑ N/A • 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC for the Permitting of Pump Stations and Force Mains (latest version)? If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). • The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the reissued permit with variance language or the variance letter must be maintained with the original documents. 7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? ❑ Yes ❑ No • If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5). If the permit does not include this language, the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with this permit (including but not limited to pipe length changes of 10% or greater, change in flow, pump station design capacity design change of 5% or greater, and/or change in the number/type of connections)? ❑ Yes ❑ No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 11628 Mail Service Center, Raleigh, NC 27699-1628 Physical Address: 3800 Barrett Drive, Raleigh, NC 27609 919-791-4200 DocuSign Envelope ID: 7D3AAE5D-16EB-4CF2-A90C-350CD5D4C9B8 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Charthouse Holdings, LLC PERMIT #: WQ0044810 PROJECT: 8817 Cleveland Road PS & FM ISSUE DATE: October 26, 2023 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEERS CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑ full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: a 46—gallon per minute pump station with simplex grinder pump, with a portable power source with manual activation, quick -connection receptacle, and telemetry; as well as approximately 156 linear feet of 2-inch force main; such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast - Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. ................................. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 11628 Mail Service Center, Raleigh, NC 27699-1628 Physical Address: 3800 Barrett Drive, Raleigh, NC 27609 919-791-4200