Loading...
HomeMy WebLinkAboutSite Inspection 10.18.23 A0009 Non-Compliant (002)Wetland Inspection Report Project Num: 20201371 Version: 1 Status: Issued Project Name: TPB NCDOT -Improvements to NC 129 and NC Project Type: New Road/Highway County: Graham43 (A-0009C) Region: Asheville Location: TPB NCDOT - Improvements to NC 129 and NC 143 (A-0009C) Latitude: Longitude: SW Plan Location: Site Owner Name: NC DOT Division 14 - Sylva Inspection Date: 10/18/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Robert K Mitchell Secondary Inspector(s): Facility Compliance Status: ❑ Compliant 0 Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: page: 1 Site Number: 20201371 Owner: Blazer, Keith Inspection Date: 10/18/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Site inspection was conducted on October 18, 2023 by Kevin Mitchell with the Asheville Regional Office. Mark Davis, Kevin Barnett, and David McHenry were present during the inspection. The following are items that need attention: Section CC - Station Y2 68+00 LT (Site 15) - Rip rap channel looks much better and is keyed in per plans. - Station Y2 27+50 LT (Site 7&8) - After looking at the plans closer, it appears the wetland has been impacted from a newly installed drain. Please confirm. Erosion control is also needed above the JS. Remove loose fill material in JS. Rip rap at outlet needs to be keyed in. - Section CA - Station L 163+00 LT (Site 19) - Outlet needs to be stabilized before next rain event. - Station L 137+25 LT (Site 14) - Disturbed wetland (permitted impact) needs to be seeded and stabilized. Use native seed mix. - Station L 134+50 LT (Site 13) - Stabilize fill slopes above JS. Add coir fiber matting to JS on inlet side. - Station L 129+25 LT (Site 12) - Add coir fiber to JS stream banks at inlet. Rip rap at outlet needs to be embedded/ keyed in better. Install silt fence above rip rap to protect JS at outlet. - Station L 114+00 LT (Site 10) - Need EC measures above headwall (inlet). - Station L 44+75 RT (Site 4) - Seed and mat slopes above inlet. Continue to meet NPDES cover requirements. page: 2 Site Number: 20201371 Owner: Blazer, Keith Inspection Date: 10/18/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ❑0 ❑ ❑ Are the culverts and/or filled areas installed properly? ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑ Comment: Section CC Station Y2 27+50LT (Site 7). It appears that the wetland has been drained and possibly impacted. This needs to be confirmed. page: 3