Loading...
HomeMy WebLinkAbout20231199 Ver 1_More Info Received_20231026DWR request for Additional Information Response 10/25/23 1. Please confirm that a riprap dissipator will not be required by the local government or appropriate S&EC review entity or revise the project impacts and plan sheets accordingly. It is the Division's experience that energy dissipation is required by these agencies. The project engineer confirmed with Cory Sloan, plan reviewer with City of Statesville that no rip -rap will be required and that the impacts as presented in PCN are acceptable to the City. 2. The project proposes utility impacts that are offsite. The offsite impacts do not appear to be within the limits that were verified by the USACE. Please clarify whether the USACE has provided verification or confirmation of the offsite features. The original JD did not include these areas because the project proponent was not aware at that time that the water line extension would be required. W&W conducted a delineation of the area after submittal of the JD request. Wetlands are depicted in the permit drawings for the water line with hatched areas. Tributaries were field located by surveyors. Depiction of wetland delineation is attached. 3. Please provide plan sheets that show that the stream channel will not be widened above and below the storm culvert in accordance with standard 401 requirement: Culverts shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. The dimension, pattern, and profile of the stream above and below a pipe or culvert shall not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. The width, height, and gradient of a proposed culvert shall be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. If the width of the culvert is wider than the stream channel, the culvert shall include multiple boxes/pipes, baffles, benches and/or sills to maintain the natural width of the stream channel. If multiple culverts/pipes/barrels are used, low flows shall be accommodated in one culvert/pipe and additional culverts/pipes shall be installed such that they receive only flows above bankfull. Sheet 7 of 15 of the updated impact drawings has been provided with cross-section views of the culvert crossing pipes at invert in and invert out to more clearly demonstrate that the design mimics existing stream dimensions. The main culvert is to be buried at a width proximate to the existing OHWM to maintain low flows and allow for passage of aquatic life with additional culvert elevated to mimic floodplain height and flows. 4. Please note that all work must be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channel during culvert installation and during utility line installation. Please provide a construction sequence and dewatering details that show that dewatering is to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. In addition, please ensure that the location of the temporary impacts are shown on the construction drawings and clearly indicated in the revised impact table. Updated impact drawings depict temporary pump -around with dewatering construction sequence added for bypass pumping (sheet 14 of 15). PCN impact tables are revised to reflect the additional 24 if (0.002 ac) of temporary impact. 5. Please provide a stream restoration detail for the utility line installation stream impact locations and a wetland restoration detail for utility line installation wetland impact locations. Updated impact drawings depict stream/wetland restoration detail and narrative (sheet 14 of 15). 6. Pursuant to 15A NCAC 02H.0506(b) "a 401 Water Quality Certification may only be issued upon determining that the proposed activity will comply with state water quality standards which includes designated uses, numeric criteria, narrative criteria and the state's antidegradation policy, as defined in rules of 15A NCAC 02B .0200... In assessing whether the proposed activity will comply with water quality standards, the Division shall evaluate if the proposed activity: (2) would cause or contribute to a violation of water quality standards; (3) would result in secondary or cumulative impacts that cause or contribute to, or will cause or contribute to, a violation of water quality standards;" Based on the current proposed plan the Division believes there is potential for indirect impacts to Tributary 4 as all surface flow to this channel appears to be routed to two SCMs which would discharge at the lower end of the project boundary. Please either, include indirect impacts to Tributary 4 within the impact table and provide mitigation for this section, provide hydrologic calculations to document that surface now will continue to support the existing function of Tributary 4, or provide a monitoring plan that will document existing conditions of Tributary 4 and post construction conditions. Tributary 4 is characterized by small drainage area (estimated less than 10 acres) with steep adjacent slopes and highly erodible soils. The tributary was formed as a result of historic agricultural use resulting in rapid runoff, erosion, and gully formation which eventually cut to depths intercepting the groundwater table terminating at the existing head -cut. Overland surface run-off resulting from stormwater following precipitation events are negligible contributor to the feature's functions. 7. Sheet 8 of 12 appears to show a proposed greenway crossing over Tributary 1. Please clarify if there will be additional impacts as a result of the greenway at this location. This section of greenway will consist of a 10 foot wide natural surface trail with elevated boardwalk section for the stream crossing (Note added to sheet 9). 8. Sheet 10 of 12 shows a proposed waterline location within the limits of the Top of Bank of Tributary 7. Standard 401 certification conditions require that: Any utility construction corridor that is parallel to a stream or open water shall not be closer than 10 feet to the top of bank or ordinary high-water mark. Sheets have been updated for clarity reflecting water line installation location being immediately adjacent to the existing sewer easement and minimal clearing required for maintenance of the additional easement with no less than 10' separation. Project boundary (typ) 9 Ora Dr.-,, �,•:; ;/ j / ;� r� ;;' �� it ' // J I Wetland 3000 - 0.03 ac Wetland 2000 - 0.12 ac /,1/%%/�iii?f'i;, i / i ) /% i///%�=%l''ii+'h?��/�' / / / - r, l %/', i% v, / / /; / /" %1111,111fri....i, rr 4 _i Tributary 1 - 2810 LF Tributary 6 - 800 LF 4 � Tributary 5 - 20 LF Wetland 4000 - 0.10 ac . ��- Tributary 2 -65 LF f,;,/; - /-= f • ��� /�=- \, ul � T t Iry 4 - 580 LF \I 100 lv ,.V,f�� Ifv I t Tributary 4 - 415 LF A1A�''`''; X 1 °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Wetland Greenbriar Ridge Cad: Scale: 1" = 350' N GCeerar\a I I E• 0 175 350 Existing Conditions Map PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 1 15 SHEET NO OF Tributary 7 (offsite) - 445 LF Project boundary (typ) —7- LJ d 000 N b MERRICIC 0130 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Greenbriar Ridge Tributary 8 (offsite) - 275 LF Tributary 1 (offsite) - 1265 LF Approx. wetlands - 2.70 ac. Scale: 1 = 350' N 0 175 350 Existing Conditions Map PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 2 15 SHEET NO OF Li 13 I '%�//j `'' Tributary 1 - 2810 LF Project boundary (typ) Ora f Wetland 3000 - 0.03 ac Tributary 6 - 800 LF Permanent impacts 1294 sf (0.03 ac) Y - , /��',� ti No impacts See sheet 9 ' �/ ,y K { �� a � o�. \ Wetland 2000 - 0.12 ac s - Tributary 5 - 20 LF 4/ Permanent impact 385 SF (0.009 ac) No impacts See sheet 8 Tributary 1 Temporary impact 99 SF (0.002 ac) See sheet 9 Wetland 4000 - 0.10 ac I Tributary 2 - 65 LF No impacts ,�,I`,; p No impacts _ ' / � 'I�i Tributary 4 - 580 LF No impacts , "Z 11 ' S I� Tributary 4 - 415 LF No impacts G °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Tributary 1 Permanent impact 193 LF, 683 SF (0.016 ac) Temporary impact 24 LF, 88 SF (0.002 ac) L See sheet 5 r----\ A 1 11 1 "[ � Wetland 1000 - 0.5 ac I y, Permanent impact 9838 SF (0.23 ac) { See sheet 5 Greenbriar Ridge . .• \I = ` I , Overall Site Plan 0 175 350 \�_� PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 3 15 SHEET NO OF °❑°°❑ MERRICIC 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Greenbriar Ridge ;ite) - 275 LF )ffsite) npact 60 SF (0.001 ac) Dffsite) - 1265 LF npact 8555 SF (0.20 ac) npact (within ex. esmt) 8584 SF (0.20 ac) 1&12 Scale: 1" = 350' N 0 175 350 (l Overall Site Plan PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 4 15 SHEET NO OF \ — Greenway (typ) — ---- - '- - ---- � w A 30' undisturbed TOB (typ) stream buffer (typ) ---- W OWN r � — Prop. 134 LF 60" ' --- TOE (typ) Sol.,, \ _ — RCP Culvert _ 60" Culvert: 825.00 ��--- -- --'/% \f` -- ,i 60" Culvert: 823.50 Channel: 824.00 84" Culvert: 823.00 - �- r(r'/ f Channel: 822.50 �� 84" Culvert: 821.50 1 \ " Tributary 1 ay r — I/ r ` r SS ' SrS r r r r r r r r T r r ! ✓P r r " \ r ,4 r " Prop. temporary Prop. temporary r >r r impervious dike impervious dike I ' Prop. 134 LF 84" Sewer relocation -- _ RCP CulvertI TT r r Tributary 1 " Permanent impact 193 LF, 683 SF (0.016 ac) Temporary impact 24 LF, 88 SF (0.002 ac) — — \ — Wetland 1000 - 0.5 ac _ Permanent impact 9838 SF (0.23 ac) Sc Scale: 1" — 30'LL � 15 30 °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 wft�ww *,„-, Greenbriar Ridge Tributary 1 Stream Impact and Wetland 1000 Impact (Plan View) PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 5 15 SHEET NO OF Restore natural channel bed depth after construction of culvert 1 830 Ex. grade 60" Culvert: 825.00 y 84" Culvert: 823.00 820 815-�- 0+00 °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Prop. grade i — —I— 4— 1 1 � I LF 6p RCP Culvert/I 134 LF 84 _RCP Culvert Stream bed elev. Greenbriar Ridge 1+00 M 830 Restore natural channel bed depth after construction of culvert 60" Culvert: 823.50 84" Culvert: 821.50 820 -Lt-815 1+55 Tributary 1 Stream Impact Exhibit (Profile View) Scale: 1" = 40' 0 20 40 PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 6 15 SHEET NO OF M TOW: E we] 60" RCP Inv. 825.00 1 Inv. 823.00 TOW: 831.50 TOW: 830 830 84" RCP 84' Ex. grade 12" embedment 12' HW-1 815 (Facing Upstream to Down) 815 815 0+00 0+70 0+00 °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Greenbriar Ridge Tributary 1 Stream Impact Exhibit (Section View) 00 1 E�3111] we] 815 1+00 1+40 Scale: 1" = 40' 0 20 40 PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 7 15 SHEET NO OF I 1 _ 40000' _ ss i �J TOE (typ) TOB (typ) YP, -`->< Wetland 2000 - 0.12 acPermanent impact 385 SF (0.009 ac.) r, + r \r � 1 i \ ` / Ex. SS esmt. — i Ex. sanitary sewer line ------------- -- r -- ��� ,Scale: 1" = 30' ,� Tributary 1 j I i i �� 30' undisturbed i i I stream buffer (typ) 0 15 30 ❑❑❑❑❑ MERRICIo Greenbriar Ridge Wetland 2000 ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Impact Exhibit (Plan View) PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 8 15 SHEET NO OF �\ ---�— 11 �� I — ---------- I - - ---- Wetland 3000 - 0.03 ac --- _ Permanent impact 1294 SF (0.03 ac.) ----------- ----- r Retaining wall (by others) , , i-'- � Greenway v, OWN=i- �� / ------ — /------- ---�5- s \i Ex. SS esmt. TOE (typ) , / / \� /��- _ - / __�\ Ex. sanitary sewer line 810- TOB (typ) _ Prop. temporary / ---- — impervious dikes 820 Tributary 1 -' / 4001-' -- _ -- ^`.\ I�I ,� Scale: 1" = 30' --------- 30' undisturbed stream buffer (typ) 0 15 30 � [3011 MERRICI� Greenbriar Ridge Wetland 3000 ppp Permanent Impact & 301 S. MCDOWELL STREET Tributary 1 SUITE 300 Temporary Impact CHARLOTTE, NC 28204 PHONE 704.529.6500 (Plan View) FAX 704.522.0882 Tributary 1 Temporary impact 99 SF (0.002 ac) 10' natural surface trail stream crossing to be a ;S boardwalk section (by others). No impact. , PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 9 15 SHEET NO OF onn E 99 SF temporary impact °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Stream bed e Orin 0+00 0+42 Greenbriar Ridge 12 sanitary sewer Tributary 1 Temporary Impact Exhibit (Profile View) Scale: 1" = 40' 0 20 40 PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 10 15 SHEET NO OF III c� ' '\`\ I • • I • •I . I • 1 � ' 1 II I ' I'1 1 `I 1 \\ \\ \\ \l 1 \ \ \ I \• I I I \ \\ 1 1 1 co Tributary 7 •\��\• I' I� `� 12-111 I it 111 1 I 01 , j ' Iri' �,i / ll •f ' I / //i I i I l i i i i b�Oii' i \ Permanent impact 8555 SF (0.20 ac) \\\il ;t\\\ \\ \ ; Temporary impact (within ex. esmt) 8584 SF (0.20 ac) �1 \; ; `�\ i`, \I`\ ' • ' / \\ \I \I 11 I II � I 1 I 1 j I i 1 I 1 \II \ `\`\ 1 , ' • •I �' I. \\�\ 1 I I I I 1 I 1 , / v l I I I I I 1 1 1 /` • , ./ / /�'�)I '1 I I I I j I II I I/'/ /' % % / ' '\ 1/./ 'I '�• I• I lI II I I I I I I Iljl;I1//;1/ I � '-�' • �``� it ' j l � 11 � IIII / l I TOB (typ) I �0 1 I 1 1/ I Tributary 1 Prop. 10' utility esmt. (typ)�/� ,/' , �'�\ \ i li i i ( �\ TOE (typ) — Prop. 8'WM (typ) (collinear to ex. SS esmt. line) �,' �\\ \\\ \ \ \\ `\ \ `, \ 30' undisturbed ��/ /� I 1 i `\\ \\ \\ • /' '/ : : , h\\�,\\\ \ \\\\ \\\ stream buffer (typ) / // / % % � I � `\ . • � ' � ' ' 11� I II' I I II III i' CO /;//1 I I � I I • ;/' ' ' I . 'I II �II�III IIII%-� - 4 i I i i \ I\ I I ; ; a 11 •III l i ' Ex. SS esmt. (typ) 1 r f ) ` `\ l ' 1 It; \ '\ \\ Scale: 1" = 60' Ex. sanitary sewer IT 11o MERRICIV ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Greenbriar Ridge Offsite Water Tie-in Temporary & Permanent Impacts PROJECT No: 6512-1067 (Plan View) ISSUE DATE: 10/17/2023 11 15 SHEET NO OF cp Tributary 8 _ I - > / �ea $ -J � J ) Permanent impact 8555 SF (0.20 ac) Temporary impact (within ex. esmt) 8584 SF (0.20 ac) `—� �� •�, ; I Tributary 1 (offsite) Temporary impact 60 SF (0.001 ac) \ �� \ �\ \\ •I \ , Open cut 11 1 I I I (,I Tributary I Prop. temporaryCP 30' undisturbed impervious dikes stream buffer t Prop. 10' utility esmt. (typ)�111`'i'iI IY - Co Prop. utility esmt. Prop. 8" WM (typ) 11 (collinear to ex. SS esmt. line) / Ex. SS esmt. (typ) — Ex. sanitary sewer line �, I 1 TOE (typ) �� /� TOB (typ) ; ,�/, 1 ' , ;,;� Scale: 1" = 60' hill II - Tributary 7 [3013 MERRICI� Greenbriar Ridge Offsite Water Tie-in p❑p Temporary & 301 S. MCDOWELL STREET Permanent Impacts PROJECT No: 6512-1067 SUITE 300 (Plan View) ISSUE DATE: 10/17/2023 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 12 15 SHEET NO OF 60 SF temporary impact °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Stream bed E C:- grade 0+00 0+50 Greenbriar Ridge 1�J 3" water main Tributary 1 Temporary Impact Exhibit (Profile View) Scale: 1" = 40' 0 20 40 PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 13 15 SHEET NO OF ENERGY DISSIPATION __ FLOW IMPERVIOUS DIKE \FLoW DEWATERING DEVICE NOTE: ANCHOR ALL PUMPS AND PIPES SECURELY rig' DISCHARGE HOSE WORK AREA 0ille el21Ew 0 NOT TO SCALE Dewatering Construction Sequence 1. Establish limits of disturbance with single-row/double-row silt fence in accordance with the site plans. 2. Make effort to conduct stream crossing work during a period of low flow. 3. Install bypass pump and dewatering device per above detail. Bypass pump should be properly stabilized with gravel dissipation to prevent erosion. 4. Isolate project area with impervious dikes to keep project area free of flow. Install upstream impervious dike and begin pump -around operations before installing downstream impervious dike. Note that all stream impact work is to be done "in the dry". 5. Install culverts/utilities in accordance with the site plans. 6. Upon completion of stream impact work, excavate any accumulated sediment and remove the stream flow diversion devices, beginning with the downstream impervious dike. 7. Install remaining specified erosion control measures, including seeding, stabilization, and single-row/double-row silt fences, in accordance with the site plans. °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Greenbriar Ridge Dewatering Construction Sequence PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 14 15 SHEET NO OF 3 -0" BACKFILL TOP OF BANK SECTION T OF MATTING WITH MIN 6" TOPSOIL HERBACEOUS NATIVE PLANTS TOP OF BANK / (MINIMUM OF 2 SPECIES) INSTALL IN I \ TRIANGULAR PATTERN MATH 1 PLANT 1 / / PER SQUARE FOOT f i WOVEN COIR NET OVERLAY (400 WEAVE) I&WP PLANTING PATTERN INSTALL ANCHORS -I I IN ACCORDANCE MANUFACTURES GL SNTH PECIFICATIONS le W SCOUR LINE I �1Z -I II m " MATCH Iil 11 0a o OHOTTI W 0 INSTALL ANCHORS p a m O O O IN ACCORDANCE WITH MANUFACTURERS 0 w � O SPECIFICATIONS N 0 3 CHANNEL SUBSTRATE MATERIAL CREEK CROSSING CROSSING RESTORATION DETAIL NOT TO SCALE Stream/Wetland Restoration Notes 1. No waste, spoils, solids, or fill of any kind shall occur in the creek beyond the impact depicted in the site plans. 2. Stockpile stream bed/wetland substrate material that is necessary to be excavated during construction. Reestablish stream bed/wetland with original material upon completion of temporary impact. 3. Original grades through stream bed/wetland areas shall be restored after trenching and backfilling. Excess fill materials shall be removed from these areas and spread in an upland, non-floodplain area. 4. Erosion control measures shall not be removed until site construction is complete and sufficient ground cover is achieved to survive and inhibit erosion. 5. Seeding and stabilization composition and sequencing shall be in accordance with the site plans. °❑°°❑ MERRICIC ❑❑❑ 301 S. MCDOWELL STREET SUITE 300 CHARLOTTE, NC 28204 PHONE 704.529.6500 FAX 704.522.0882 Greenbriar Ridge StreamM/etland Restoration Detail & Narrative PROJECT No: 6512-1067 ISSUE DATE: 10/17/2023 15 15 SHEET NO OF C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Bottomland Hardwood Forest Yes Corps 0.009 W2 P Fill Bottomland Hardwood Forest Yes Corps 0.03 W3 T water line installation Bottomland Hardwood Forest Yes Corps 0.2 W4 T waterline temp constructio Bottomland Hardwood Forest Yes Corps 0.2 W5 P Road fill (T-1) Bottomland Hardwood Forest Yes/No Corps 0.23 W6 T "work in dry" pump around Bottomland Hardwood Forest No Corps 0.002 2g. Total Wetland Impacts: 0.671 2h. Comments: 0.269 Total Permanent impacts. 0.402 Total Temporary impacts. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert Tributary 1 PER Corps 4 193 S2 T sewer utility crossing Tributary 1 PER Corps 4 10 S3 T sewer crossing (offsite) Tributary 1 PER Corps 4 10 S4 T pump -around Tributary 1 PER Corps 4 24 S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 237 3i. Comments: Permanent stream impacts for road construction 193 If (0.016 ac) Page 4 of 10 PCN Form — Version 1.4 January 2009 Legend Q DRH_Greenbriar_RA 0 WL Polygon Sewer Manhole topo Y 0 �( 1 I Wetlands 1 0 �r N Ilk "Wetland Sketch provided for illustrative purposes for preliminary planning use only. Not intended to be relied upon for exact location, dimensions, or orientation. All findings and assessments made by wetland cons ultants'.regarding limits of jurisdiction or permitting requirements are subject to verification by the US Army Corps of Engineers and other appropriate state and local authorities. 'GPS approximations only, NOT surveyed 0 100 200 Feet Sr'ILC.6rn 6i ,, 9 II © r Oper�iS�re I r G t f V o P o V6 \I `M 'n of North Carol \ \ \ v r. \ ,� aph, GeoTech 11IIA, Sources: Es1lri, arf-d-F€ „ANlnte map an user co n of t i DOT, gies, irbus ie G S unity WETLANDS 6 WATER9, INC. Project Name: Greenbriar Off -site Water N W E S caner eveoper: DR Horton City/County: Statesville /Iredell/NC Figure 1: Approximate Delineation of Surface Waters and Wetlands Tax s : oor Ina es: Let: 35.7833309°N Long: 80.8436382°W Date: 12-08-22