Loading...
HomeMy WebLinkAboutSite Inspection 10.25.23 Ruth Bypass R-2233Wetland Inspection Report Project Num: 20200362 Version: 2 Status: Issued Project Name: NCDOT -Improvements to US 221 - Rutherfordton Project Type: Road Coun • ass (R-2233BB BA) me ce/repair/improveme h • Ruthero ns Region: sheviW Location: NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA) Latitude: +350 22' 43" Longitude: -810 56' 60" SW Plan Location: Site Owner Name: NC DOT Division 13 Inspection Date: 10/25/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Robert K Mitchell Phone: Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Site inspection was conducted on October 25, 2023 by Kevin Mitchell with the Asheville Regional Office. Taylor Ivie was present during the inspection. - Station L3 968+50+00 LT (Site 11) - Remove measure from the JS. These only need to be installed for sediment cleanups and need to be removed after stabilization. - Y8/Y10 Pond (Site 16) - Measures need to be installed on the left bank of the JS. - Station L3 798+00 (Site 4) - Mat slopes above JS and complete/repair basins. Continue to meet NPDES cover requirements on the project. page: 1 Site Number: 20200362 Owner: Bryan, Roger D Inspection Date: 10/25/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ ■ ❑ ❑ ❑ page: 2