HomeMy WebLinkAboutSite Inspection 10.25.23 Ruth Bypass R-2233Wetland Inspection Report
Project Num: 20200362 Version: 2 Status: Issued
Project Name: NCDOT -Improvements to US 221 - Rutherfordton Project Type: Road
Coun • ass (R-2233BB BA) me ce/repair/improveme
h • Ruthero ns Region: sheviW
Location: NCDOT - Improvements to US 221 - Rutherfordton Bypass (R-2233BB BA)
Latitude: +350 22' 43" Longitude: -810 56' 60"
SW Plan Location:
Site Owner Name: NC DOT Division 13
Inspection Date: 10/25/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Robert K Mitchell Phone:
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Site inspection was conducted on October 25, 2023 by Kevin Mitchell with the Asheville Regional Office. Taylor Ivie
was present during the inspection.
- Station L3 968+50+00 LT (Site 11) - Remove measure from the JS. These only need to be installed for sediment
cleanups and need to be removed after stabilization.
- Y8/Y10 Pond (Site 16) - Measures need to be installed on the left bank of the JS.
- Station L3 798+00 (Site 4) - Mat slopes above JS and complete/repair basins.
Continue to meet NPDES cover requirements on the project.
page: 1
Site Number: 20200362 Owner: Bryan, Roger D
Inspection Date: 10/25/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
Yes No NA NE
•
❑
❑
❑
•
❑
❑
❑
■
❑
❑
❑
page: 2