Loading...
HomeMy WebLinkAboutNCC216383_NOT Closeout Documents_20231023 HOLLY Town of Holly Springs s SPRINGS Engineering Department \**.oso Discover the Source. Certificate of Completion For Soil Erosion and Sedimentation Control PROJECT Village Gate Tract 1 PHASE N/A LAND DISTURBING PERMIT NO. 23-2021 FINANCIALLY RESPONSIBLE The Aspens at Holly Springs, LLC PARTY This is to certify that on the above referenced project the grading has been completed, all utilities and streets have been installed, and permanent stabilization has been successfully achieved in or along all roads and utilities in accordance with the approved erosion control plan. With this certificate, the Town of Holly Springs Engineering Depaitliient certifies that the above referenced project is in final compliance with the Town's Soil Erosion and Sedimentation Control Ordinance and therefore closes the active erosion control file for the above referenced project. Wofrc-fi-LA 10-5-23 Erosion Control Inspector Note: This document does not preclude the Town from taking action on future land disturbance or other erosion or sedimentation issues at this site. 9024 Certificate of Completion Page 1 2/25/2006