Loading...
HomeMy WebLinkAboutNCC205886_NOT Closeout Documents_20231023 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Brunswick Project: Devaun Park Pulte Lots River basin: Lumber Person financially responsible:Pulte Home Company,LLC-Sidney Dudley, Project#: BRUNS-2019-025 Director of Land Development Address: 4136 Passerine Avenue,Wilmington,NC 28412 1. Project Location: Ocean Harbour Golf Club Road,Calabash Pictures: Yes-Digital 2. Weather and soil conditions: 70s clear,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): none Title: Inspection report: Sent Report Date given/sent: October 17,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.The E&SC file will be closed.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at deq.nc.gov/NCG01.Please note that this correspondence must be uploaded as part of completing the NOT process. austin.turbitt@deq.nc.gov Reported by: Austin Turbitt Others present: Date of inspection: October 16,2023 Time arriving on site: 1:00 PM Time leaving site: 1:30 PM CC: