Loading...
HomeMy WebLinkAboutNCC233180_ESC Approval Submitted_20231025 ���� ,0.STATaq .,.,. ROY COOPER ``' ,,-,.,,,, _-�. Governor �< h • t ELIZABETH S.BISER `" im• Secretary , f„ �c "*a �ounh BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 9, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Greenville Utilities Commission Attn: Mr. David Springer, PE; Assistant Director of Water Resources P.O. Box 1847 Greenville, NC 27834 RE: Project Name: GUC Bethel Wastewater Pump Station Improvements Project ID: Pitt-2023-018 County: Pitt City: Bethel Acres Approved: 2.34 Address: E. Moore St.; N. Railroad St. River Basin: Tar-Pamlico Date Received by LQS: October 13, 2022 Submitted By: Rivers &Associates, Inc. Plan Type: New Dear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are listed on the attached page.This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: -9) North Carolina Department of Environmental Quality Division of Energy,Mineral and Land27889 Resources Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 'JFY i.✓DLhW GNvfma, alEnNrommv,plNA /'d 252.946.6481 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute s ions to e nsu-51 throughre c6),omis ofce may require pliance with the Actrevisions to the plan and implementation of the rev Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, i land-d and isturbing. In activity.addition,Thisocal city or county approval does not supersede nces or rules may also apply to this g any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition,it would be helpful if you notify this office of the proposed starting date for this project. Please be advised that a rule to protect and maintain existing buffers along watercourses in the Tar-Pamlico River Basin became effective on January 01, 2000. The Tar-Pamlico River Riparian Area Protection and Maintenance Rule (15A NCAC 2B .0734) applies to the 50-foot wide zone directly adjacent to surface waters(intermittent streams,perennial streams,lakes, ponds, and estuaries) in the Tar-Pamlico River Basin. For more information about these riparian area rules, please contact the Division of Water Resources Wetland/401 Unit at 919-807-6300, or DWR in our regional office at 252-946- 6481. Sincerely, Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: David Springer, PE; Greenville Utilities Commission (email) Blaine Humphrey, PE; Rivers &Associates, Inc. (email) WaRO Division of Water Resources (email) 1. The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50%capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act,the U.S. Army Corps of Engineers'jurisdiction of Section 404 of the Clean Water Act,the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations,the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances,or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on-site natural watercourse or adjoining property. (NCGS 113A-57) PROJECT INFORMATION SHEET APPROVAL DATE: November 9, 2022 RESPONSIBLE PARTY: Greenville Utilities Commission PROJECT NAME: GUC Bethel Wastewater Pump Station Improvements COUNTY: Pitt NO.: Pitt-2023-018 OFF-SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE& RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: Bradley West 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 donald.west@ncdenr.gov CERTIFICATE OF PLAN APPROVAL VAL - ' i letram,) .____yi The posting Of this certificate certifies that an erosion and sedimentation control plan approved for this project by the North Carolina Department of has been accordance with North Carolina General P Environmental Quality in Statute 113A 57 (4) and 1 l_3A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 certificate. This ( ) i must be posted at the primary entrance of the job site before construction begins and until establishment permanent groundcover as required by North Carolina Administrative of Code, Title 15A, Chapter 4B.0127 (b). G VC. &tI % Uht441, b'. .. S' /wL P %TV co. ( s dust) Project Name and Location — - - j 11 /6% /26Q2 Sswe.40 bAfteur__ I Date of Plan Approval V it Regional Engineer ,„:":115".EC) ) . , — ..,- Certificate of Coverage Number4' 'TT - 33 .,iagje 1