HomeMy WebLinkAbout20210112 Ver 3_Credit Release Request Form - Task 4_202309289/28/2023
CREDIT RELEASE REQUEST FORM
To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator
From: Kaitlyn Hogarth (Khogarth@wildlandseng.com, 540-907-9432)
Through: Wildlands Holdings III, LLC
We formally request a credit release for the Little River Ford II Mitigation Bank Parcel for
completion of Task 4 per the approved credit release schedule, which is included in the Attachments
with this request. The following documents have been submitted to DWR for Task 4 and are
pending review: Little River Ford II Monitoring Year 1 Report.
Credits requested for release are detailed below:
Credit Type % Release Credit Amount
(include Units)
Notes/Comments
Buffer Restoration NA NA
Buffer Preservation NA NA
Buffer Enhancement NA NA
Generated Nitrogen Nutrient
Offset
10% 2,242.065 pounds 22,420.650 lbs x 0.10 =
2,242.065 lbs
Delivered Nitrogen Nutrient
Offset (Jordan sites only)
NA NA
Generated Phosphorus Nutrient
Offset
NA NA
Delivered Phosphorus Nutrient
Offset (Jordan sites only)
NA NA
Signature:
Attachments:
1) As-Built Project Credit Table
2)Approved MBI Credit Release Schedule
Project Area
N Credit Conversion Ratio (ft2/pound)
P Credit Conversion Ratio (ft2/pound)
Credit Type Location
Subject? (enter
NO if ephemeral
or ditch 1)
Feature Type Mitigation
Activity
Min‐Max
Buffer
Width (ft)
Feature Name Total Area
(ft2)
Total
(Creditable)
Area of Buffer
Mitigation (ft2)
Initial
Credit
Ratio (x:1)
% Full
Credit
Final Credit
Ratio (x:1)
Convertible to
Riparian
Buffer?
Riparian Buffer
Credits
Convertible to
Nutrient
Offset?
Delivered
Nutrient Offset:
N (lbs)
Nutrient Offset Rural No Ditch Restoration 51‐200 Ditch A 182,521 182,521 1 33% 3.03030 No —Yes 9,524.190
Nutrient Offset Rural No I / P Restoration 101‐200 UT1, UT2 247,147 247,147 1 33% 3.03030 No —Yes 12,896.461
Totals (ft2):429,668 429,668 0.000 22,420.650
Total Buffer (ft2):00
Total Nutrient Offset (ft2):429,668 N/A
Square Feet Credits
0 0.000
0 0.000
0 0.000
0 0.000
Square Feet Credits
Nitrogen:22,420.650
Phosphorus:0.000
TOTAL AREA OF BUFFER MITIGATION (TABM)
Mitigation Totals
Restoration:
Enhancement:
Preservation:
Total Riparian Buffer:
TOTAL NUTRIENT OFFSET MITIGATION
Mitigation Totals
Nutrient Offset:429,668
N/A
Neuse 03020201 ‐ Outside Falls Lake
19.16394
10
Table 3.0 ‐ Credit Release Schedule for Nutrient Offset Credits
Task Project Milestone
% Credit
Available for
Sale
1 Instrument and BPDP Approved by DWR, Conservation Easement
Recorded*, and Financial Assurance Posted 20
2
All Riparian Earthwork, Planting and Installation of Monitoring
Devices Completed, Easement Boundaries adequately marked, and
all applicable permits obtained. A site visit by DWR is required for
this task.
20
3 Monitoring Financial Assurance Posted and Approval of As‐Built
Report 10
4 Monitoring Report #1: Approved by the DWR** & financial
assurance renewed 10
5 Monitoring Report #2: Approved by the DWR** & financial
assurance renewed 10
6 Monitoring Report #3: Approved by the DWR** & financial
assurance renewed 10
7
Item B (I) of Section X in this Instrument has been completed and
approved by DWR 5
No remaining credits will be released until Task 7 has been satisfied, assigning the
conversation easement to an approved land trust or long‐term steward.
8
Monitoring Report #4: Approved by the DWR** & financial
assurance renewed 5
9
Monitoring Report #5: Approved by the DWR** and final site visit
by DWR has been conducted 10
Total 100%