Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820409_Routine_20231009
Facility No. ��- I Time in Time Out 0 Data Farm Name Iniegrao iC12 MSowner �TI O O Site Ke:; tar I No. 1 O0 I q :Z:�% G Back-up No. L;aC Circle: General or NPDES FREEBOARD: Design fT421 ' Dy- Observed i 1 � - �Q Crop Yield Rain Gauge Soil Test Wettable Acres Weekly Freeboard Daily Rainfall --- --------------- Spray/Freeboard Drop- -- Weather Codes 120 min Inspections Waste Analysis: Date Nitrogen (N) M&MENUMUMAM Sludge Survey Calibration/GPM Waste Transfers Rain Breaker PLAT 1-in Inspections Date Nitrogen (N) Division of Water Resources Facility Number `. - p I C) Division of foil and Water Conservationi (Q Other• Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: � Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: I I D•. D Fj I Departure Time: F ; 57 - County: S� Farm Name: P " Owner Email: Owner Name: ��P 1 �(�e _fQr Phone: Mailing Address: Physical Address: Facility Contact: J Q r ' ee ( Q m � Title: Onsite Representative: � q i 1 1Q Certified Operator: V • Rn I I q-e qa C Back-up Operator: Location of Farm: Latitude: Phone: Integrator: _I��?j�j� -3 Certification Number: Certification Number: Longitude: Region:frd o- • Des n� „ Cu rren`t g Design 'Current Design Current Swine aCapacily,Rop., ;Wet Poultry; Capacity,Pop. ` Cattle Capacity '.aEop , Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder q(p� Farrow to Finish Gilts Boars Other, a Layer Non -Layer -Dr y-Poultr Design Current .Canacity Pon. Layers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ Yes No ❑ Yes No ❑NA ❑NE ❑NA _❑NE ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes No ❑ NA. ❑ NE ❑ Yes No ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes NNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Ej No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes N No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): C �j-++ -e 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [\3 No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [:]Yes E],-No ❑ NA ❑ Yes E] No ❑ NA ❑ Yes U No 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [N No the appropriate box. ❑ WUP [:]Checklists [:]Design [:]Maps [:]Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes "E] No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No Page 2 of 3 ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE 511212020 Continued Facility Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑\No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 0 No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? [—]Yes No ❑NA ❑NE ❑NA ❑NE ❑NA ❑NE ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes NJ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes IcILNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes N No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes © No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes U No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [N No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 6L No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (useadditionalpages as necessary). Reviewer/Inspector Name: I\L`,/I( kt, I U 1 U-1-4 IV I Phone: Reviewer/Inspector Signature: �'I� Date: 6DE(IZ Page 3 of 3 511212020