Loading...
HomeMy WebLinkAbout20201585 Ver 1_17BP.12.R.78 Permit Drawings Revised 10_19_2023_20231024Highway. North Carolina Department of Transportation Highway Stormwater Program Ell STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 17BP.12.R.78 TIP/Prof No: N/A County(ies): Iredell Page 1 of 2 General Project Information WBS Element: 1713P.12.R.78 ITIP Number: IN/A Project Type: 113ridgeReplacement Date: 10/ 99/2023 NCDOT Contact: Jeff Wyatt Contractor 1 Designer: Kimley Horn Address: Highway Division 12 Address: 421 Fayetteville St 1710 E Marion St Suite #600 Shelby, NC 28151 Raleigh, NC, 27601 Phone:(980)552-4219 Phone: (919)653-6623 Email: attncdot. ov Email: dan.robinson kimle -horn.com C ity/Town: Statesville Cou nty(ies): I redell River Basin(s): Yadkin -Pee Dee CAMACounty? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.092 miles Surrounding Land Use: Low -density residential, agricultural, future development anticipated Proposed Project Existing Site Project Built -Upon Area (ac.) 0.3 lac. 0.2 Jac. Typical Cross Section Description: Arrangement: 1@35', 1@55', 1@35', 21" Cored Slab, 4' End Bend Caps and 90 skew, Asphalt overlay on timber deck I -beams Spans: 3 Arrangement: 1@34'3", 1@35', 1@35'3", 90 skew, 2:1 sloped abutments Bridge Length: 125' Spans: 3 Bridge Roadway Width: 29'4" face to face Bridge Length: 105' Annual Avg Daily Traffic (veh/hrlday): Design/Future: 1500 VPD I Year: 2040 Existing: 1 1000 VPD Year: 1 2019 General Project Narrative: The bridge replacement on Wood Bridge Rd conveys Third Creek from West to East and ultimately drains into the South Yadkin River. (Description of Minimization of Water The existing bridge, overall length OAL = 105' and width = 24', will be replaced with a bridge with OAL = 125' and width = 29'4". The new bridge is longer than the existing bridge Quality Impacts) to accommodate the spatial differrence between the previous bridge location to the new location. Runoff from the crested bridge is captured at the sag on the northern side of the bridge in two shoulder berm and gutters that lead to two TB GI's on either side of the road. The 15" pipe system outfall with rip rap protection into the proposed ditch on the upstream side of the proposed bridge. Highway (Version 3.00; Released August 2021) North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS °t ?�e WBS Element: 17BP.12.R.78 TIP/Pro' No.: N/A Count ies : Iredell Page 2 of 2 General Project Information Waterbody Information Surface Water Body 1 : Third Creek NCDWR Stream Index No.: 12-108-20-4 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? iYes Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) T G LU J See Sheet 1A For Index of Sheets See Sheet 1 B For Conventional Symbols See Sheet 1C- 1 for Survey Control Sheet T gyCo � A 64 & �ICLF"Ic S J yFRF RM LOOP J � p.0 THIRD S �O CREEK PRO 74 O TI N CANNON C� o AD IS�Np > 0 0 0 o w o u 0 - z y 40 GILBERT ROAD L m LU ICKORY H Y VICINITY MAP OFF SITE DETOUR ROUTE WETLAND AND SURFACE WATER PERMIT PACKAGE OCTOBER 19, 2023 PERMIT DRAWING SHEET 1 OF 6 *DESIGN EXCEPTION REQUIRED FOR MAXIMUM VERTICAL GRADE, SAG CURVE K VALUE AND VERTICAL STOPPING SIGHT DISTANCE STATE OF NORTHTII� �C�IL�TIAROLINA IREDELL COUNTY LOCATION: BRIDGE NO.254 OVER THIRD CREEK ON SR 1512 (WOOD BRIDGE ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE Q Ln N TO CANNON RD a BEGIN PROJECT 17BP.12.R.78 I I -L- Sta. 11+95.00 I -L- SR 1512 BRIDGE (WOOD BRIDGE ROAD) NO.254 0 BEGIN BRIDGE -L- Sta. 13 + 08.75 SITE 2 END PROJECT 17BP.12.R.78 -L- Sta. 16 + 80.00 END BRIDGE -L- Sta. 14+36.25 SITE I MA CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. RTA'R 8PA98 PR.- RRPRRRNCR NO. S-o T N.C. 17BP.12.R.78 I BPATR PRd.N4 P.A R{d.N4 RRSCFIPTION 17BP.12.R.78 P. E. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Ell T\ 64 NC GRID NAD 8,3 NA 2011 PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION GRAPHIC SCALES -Is po DESIGN DATA PROJECT LENGTH Kim�'Morn HYDRAULICS ENGINEER ADT 2019 = 1000 VPD PLANS PREPARED FOR yle THE NCDOT BY: 30 15 0 30 60 ADT 2040 = 1500 VPD LENGTH ROADWAY PROJECT 17BP.12.R.78 = 0.068 MILES o@ �oerq D 2018 STANDARD SPECIFICATIONS PLANS V = 60 MPH LENGTH STRUCTURE PROJECT 17BP.12.R.78 = 0.024 MILES LARRY D. ROBINSON, A.E. P.E. PROJECT ENGINEER TYLER G. SPRING, P.E. SIGNATURE.- 30 15 0 30 60 TOTAL LENGTH PROJECT 17BP.12.R.78 = 0.092 MILES RIGHT' OF WAY DATE: TBD A o� 'ec qe TOO, ROADWAY DESIGN ENGINEER PROFILE (HORIZONTAL) PROJECT DESIGN ENGINEER 6 3 0 6 12 FUNC CLASS= RURAL LOCAL SUBREGIONAL TIER LETTING DATE: AUGUST 27,2024 JOSH NCDOITICONTP Es. TACT PROFILE (VERTICAL) I&SIGNATURE: P.E. GREU TL-3 TYPE Y-10' F N -L- N 556'46.9"W l3 2 GREU jPE TL-3 BEGIN APPROACH SLAB -L- Stal2t97.98 BEGIN BRIDGE GREU TL-3 u+ 8:1 GREU TL-3 PS - PAVED SHOULDER SKETCH SHOWING BRIDGE /PAVEMENT RELATIONSHIP -L- PI Sto /5+95.75 PI Sta 17+27J5 Z = 8' 34' 403' (RT) � = 8 43' 223' (RT) D = 4' 18' 28.6' D = 13' 38' 30.7' L = 199J2' L = 63.94' T = 9974' T = 32A3' R = 1,330A(Y R = 420.00' SE = 0.06 SE = N/A PS RO = 150' RO = N/A DS = 60 MPH BEGIN PROJECT 17BP.12.R.78 -L- POT Sto.10+00.00 BEGIN CONSTRUCTION �EdBANKMENT 6ROTECTI¢ %; -L- POT Sta. 11+95.00 W/CLASS II RIPRAP ' O EST, TONS OLA M. LEWIS CLASS II RIP RAP 0b EST, 12 SY GFD SEE, DETAIL 5/5HEET 2D,'I REGINALD R. HOLLEY TO SHOULDER' DB 1675 PG 2077 =�S�� 'tiTT�PIJE PUE PU� ;WO6D5' sRRR1DfrE��7D '(WOOD, �Q) R 'S-PB 57 PG V23--'' -,-EkKTI G R/W---'- .\GRa55 �P, o 7 py� SEAT=&._ P� XI T N W - _ _ _ - - - _ _ R/W-.,';,___.- OWNEFT 40111ER' - - F - - NO TAGS - 0 TAGS �Pu,� ''R :PIJE� � P�7E PUE' pU -- ---- U .. .. .. .. U PUE F PO -6=�54' P,'B,L 7'1 OLA M. LEWIS ARMOR WITH CL-II RAP RAP REGINALD R. HOLLEY BENEATH PROPOSED BRIDGE EST 95 TONS CL-II Dfi 1675 PG 2077 EST 185 SY GFD BM -I APPROX. EXCAVATION I ELEV = 890.69 WOODS EL - 855.0' (TYP) N 752417 E 1414529 L. -L- STATION 10+13.27 - PR IMPROVEMENTS 15.39' RIGHT E T',35 TONSNNEL L-11 COTTON SPINDLE IN EST 48 SY GFD ROOT 36" BEECH SEE DETAIL 7/SHEET 2D-1 SITE 1 SURFACE WATER IMPACTS SITE O 4RD DOHIIIT M.UOARD D6 2199 PG 1097 p O r STANDARD LATERAL DITCH W/CLASS 'B'RIPRAP EST 8 TONS ryo � EST 15 SY GFD SEE DETAIL 4/SHEET 2D-1 ry. CLASS II RIP RAP SHOULDER �TO CLASS '�' RIPRAP rr i EST 2 TONS r EST 7 SY GFD T/i Kimley >)Horn ©1- 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 2 NAD 83T1dTi„l, c 7 ati m YDE _z M JEANNE HYDE DB 2908 PG 2166 PB 52 PG 106 LATERAL 'V' DITCH W/CLASS 'BRIPRAP EST 28 TONS EST 60 SY GFD SEE DETAIL 3/SHEET 2D-1 PROJECT REFERENCE NO. SHEET NO. 17BP.12.R.78 R,W SHEET NO. ROADWAY HYDRAULICS ENGINEER ENGINEER PRELIMINA RY FLANS DO NOT USE FO CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 4 OF 6 2 N SPECIAL LATERAL 'V' DITCH END PROJECT 17BP.12.R.78 W; CLASS 'B' RIPRAP EST 12 TONS END CONSTRUCTION EST 25 SY GFD -L- POC Sta. 16+80.00 SEE GElAIL 1SHEET 2D-1 O . WOOD$ E m SPECIAL]LATERAL 'V' DITCH SkE DETAU,2/SHEET 21371 i DUE DUE ' RO(.}X ROCK, UNKNO ' 4 COL}.INMN COLUMN E 50% -' _ _ _ _ 15" CSP F NEA J _ - ' MTL _ 4 WOODS A EA = 63. __ _____ O O O O q '6 15",RCP-IV - 2 I ON O _ _ _ • C1 � � ` p. L .' FEBAR bF� ��` . N VN- _=--PEt S1o.M+96.00- 6APY R BAFjI GROWTH PUE & MSi�P F `W'-_ -_ P PUE i�*_TI; Psm 1 PGY123 53iE_ °j 'TOE OTE ON/' ' ESQ 3 ,T� O S / / ' ES`T 5 SY GFD / o WOODS SEE DETAIL 6/SHEET'2D-1 , o SHOULDER BERM GUTTER STA. 14+47 TO ',TA. 14+57 -L- (LT & RT) SPECIAL LATERAL 'V' DITCH W/CLASS 'B'RIPRAP EST 48 TONS EST 105 SY GFD SEE DETAIL l/SHEET 2D-1 B-254 GPS BL-2 ARMOR WITH CL-11 RAP RAP BENEATH PROPOSED BRIDGE EST 82 TONS CL-11 EST 155 SY GFD CHANNEL IMPROVEMENTS EST 48 TONS CL-11 EST 62 SY GFD SEE DETAIL 7/SHEET 2D-1 O JONATHAN J. BOBBITT AMANDA F. BOBBITT DB 2572 PG 407 PB 53 PG 123 -L- PCC Sta 16+95J2 wCOOS GRASS v � JOHN RUNSKI ELAINE RUNSKI DB 1986 PG 846 PB 52 PG 106 UNKNOWN V q OWNER by NO TAGS � 5 �GBL-3 %-254 TEMPORARY SURFACE WATER IMPACTS A^ by -L- PCC Sta. 17+59D6 SEE SHEET 5 FOR -L- PROFILE SEE SHEETS S-1THRU S-X FOR STRUCTURE PLANS WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS URFA E WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 13+64 TO 13+82 125' BRIDGE 0.08 40 2 14+02 TO 14+12 EMBANKMENT PROTECTION < 0.01 < 0.01 8 15 TOTALS*: 0.08 < 0.01 48 15 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb