HomeMy WebLinkAbout310332_Plan of Action_20231019PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION
Facility Number: 3 1- 3 3 2_ County:
Facility Name: L4I�Y rAa-V1 Ea�ry1S
Certified Operator Name: &A_+61� N'or vv0-n Operator #: 1-725 7
"Attach a copy of Lagoon Sludge Survey Form and volume worksheets
Note: A certified Sludge Management Plan maybe submitted in lieu of this PDA.
La oon 1 La oon 2
Lagoon 3
Lagoon 4 Lagoon 5
Lagoon 6
on Name/ Identifer
/Jb rna.h
rb.Tota!l
Sludge Depth (ft)
c. Sludge Depth to be
Removed for Compliance
— D T i I
(ft)--- -- -.
d. Sludge Volume to be
FG fIEC
vL tl( t1% ...-.
Removed (gallons)
35Y, W G 9
5a/
e. Sludge PAN
(Ibs/1000 gal)
I a u
. goy. inp
f. Liquid PAN
---
(Ibs/1000 gal)
I
g. PAN of Sludge (Ibs)
12 :ff
(d x e)/1000
Compliance Timeframes:
If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge.level
results in an elevated waste analysis, a sludge management plan that meets the requirements of SB
Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to
DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance
with NRCS Standard 359 must be achieved within two years of the original sludge survey.
If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed
within 90 days and compliance with NRCS Standard 359 must be achieved within two Years of the
original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in
sludge levels, DWR may require the owner to develop a sludge management plan that meets the
requirements of SB Interagency Group Guidance Document 1.27.
SPOA 9-15-2016 Page 1 of 3
S 10 Z a6ed 9WZ-9l-6 VOdS
(a6ed 6ulmollo; eas)
ao!j}p leuol6ab a;eudoidde ay;;e
saoanosaa aa;eM;o uolslAlp ON
:o; uuo; sly; wn;aa
s9III. oed paAlwJad GIMS
t` 01 0 .a;ea
•auoyd
?'n� :a;ea ana aouelidwoa
9£91-669LZ ON '01018 i
1a;U90 aowaS I1eW 9E91
saanose�j ja;eM;o uolsiAll] ON
wEJ6oad suol;ejado 6ulpeaj Iew1uYV
:o; wao} sly; uan;a�j
sapgioed pa;;Iw'% S30dN
(ajn;eu6!s) aa6euelNpaumo R;ll!oej
M !
(;uud) ja6eueWpaumo A;Illoe j
r r1r V 0A1 r, 113
-Cn-C 5-,e :ale(] AeAjnS a6pnlS
•aouendwoo-uou 6ul;eolpu! Aamns a6pnls leul6uo ay;;o sjeaA om; uly;lm pan8143e aq;snw
uol;elnwnooe a6pnis o; pie6aa q;lm aaue!ldwoo;ey; a6palmou3loe pue fq!ijaa aaylin; 1 •;aa»oo
pue a;einooe sl uol;ewio}ui 94;'f4Illge pue a6palmomi Aw;o;seq aq; o; pue 'uol;aV;o veld
payoene ay; ulq;!m papnlaul pue aAoge pa;s!l uol;euuo;ul aq; pama!ASJ aAeq I;ey; flltjaa Agaaay I
M aM MS 01a sWA �OU�Wv M\o �A")AhUA)
Z �
h Z �ZO I
•pasn oq o;;anpoid ay; A}laads 'pauueld s! esn agojo!w;l -y;dap
a6pnls aq; jamol o; pasn aq p!m;eq; (s)poy;aw aq; aquasap o; uo!;oas s!q; ash :3AI1VHHVN