Loading...
HomeMy WebLinkAboutRedLineDrainageChange_SAW-2017-00269_DWR_20191233240.4 ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2y II - WIE 259.5 DETAIL 3 TOE PROTECTION I Nat to Scale) OA 1'S((E3' start cxour�io d Q d=1 R. GEORExrRE Type of Liner= Class B Rip -Rap FROM STA.10+95 TO STA.12+85 LT.-L2- ry.- __Y FROM STA. 11+00 TO STA. 11+75 RT.-L2- DETAIL 5 2' BASE TAIL DITCH ( Not to Scale) Natural Natural Ground 2T ,L.� Ground D Min. D=1 Ft. g B=2 Ft. -L2- STA. 18+21 LT. DETAIL 6 RIP RAP AT EMBANKMENT ( No to Swle) Iamm. Ditd 1.0'mi 1.5' Gmde GEOTEXTILE Type of Uner= 4 TONS,CL Rip -Rap Geoleaile= 10 s FROM STA. 18+20 TO STA. 18+33 IT -L2- DETAIL 10 BERM DITCH (Not to Scalal oa �E I.y N F 10.0v.c. D d Geoianile Min. D=1 R. Type of Liner= Class B Rip Rap Max, d=1.5 Ft. FROM STA.20+00 TO STA.21+50 RT.-L2- DETAIL 7 CONCRETE DITCH BEHIND RETAINING WALL,,((\\ RETAINING INo ONAKER) NP/S� D B NATURAL GROUND FROM STA. 17+15 TO STA. 19+11 RT. -L2- JW/E — — — — — — II II li Imo_ /BOOK N/TgRY \ .� II fqs f "09 f e SITE 8 11 _ II E e2 F e B �11 2' BASE TAIL DITCFT-t�` 24� 1 1- I T �1� 20' @=1.0% \ E 7CY 5E J \\ 6 0 I 1 I\ N/F BENCHMARK CAROLINA AGGREGATES, INC DB 1592, PG 361 PIN 0786-34-9208 (168.9 ACRES PER RECORDS) TOE PROTECTION = SEE DETAIL 3 CLASS B RIP RAP EST 85 TONS EST 243 SY GEOTEXTILE SS B RIP RAP�__­Z; ONS SY GEOTEXTILE —RIP RAP AT C BUFFER DRAWING �� / Parks, c�l�a' ae��a SHEET 7 OF 13 / �% ✓�� i� KK o �P ��s C_ DR aaa 1. �0 ILDLRa / r / w U a y / w Q ° / Lu u w 2 pprox. location of cross drain LJJ W U pipes. Approx. 1' below LJJ 0 halt. Add rip rap as needed. ( U +` Q w Lu W 1— IN m \B1 I 7-t IBERM DITCH LU GREENWAY ENGINEER DQ TEWART_..N ,e . HYDRAULICS ENGINEER CA i'O� S S /0"�9 �0 f4- SEAL i g i 14101 a' a �°oyo oM oPO��oo VHB Engineering NC, P.C. (C-3705) 9a0 Main Campus DMe. Suite SLO Raleigh NC 2]fi06 H 14014.001 11 W/E 259.5 �E \re 2' BASE TAILED TI C 20' @ 1.0% DE =7 CY \ L 5E 100 240.4 I ) W/E —r—J -- - — I �i�/ ® DENOTES IMPACTS IN PERMIT DRAWING — 24o.a —----J SURFACE WATER \ SHEET 12 OF 24 J II II \li li \II Imo_ 4p /(400 N/74RY \ ss III —fC' O'- 4.r,9ps 799� "4SF �\ E '.410) FNr v IT cRgeT E 7 RFE CREEK cLAss e RA� 3 TONS 10 SY EOTEXTILE RIP RAP AT \) II\re S EO DECENT / II WE 2' s2 E I 3 ``\ BASE TAIL DITCFT n _-- E _2 C5E SITE 7 CLASS B RIP RA- 3 TONS 10 SY GEOTEXTILE RIP RAP AT EMBANKME SEE DETA& SS TB C 18" H9 — I",-- 18+--00- 2C \F BZ 2 EE CON ET \\ moo \ \ i CG \ 82 2 \ 6 TOE PROTECTION = SEE DETAIL 3 CLASS B RIP RAP EST 85 TONS EST 243 SY GEOTEXTILE E C xeLaeMnDxRALE— a U rs % LLJ U I --I / Q LU LU Q U LU LU LU = Approx. location of cross drain pipes. Approx. 1' under asphalt. LU QC U Add rip rap as needed. (D U m Q LU 'C U LU ZEST LU RAP W (_EOTEXTILE -V.'` GREENWAY ENGINEER PAN i :ft:, 31OVLE / (French drain (Sta. 20+30 I /� +/- toSta. 21+10) ;� TEW4RT HYDRAULICS ENGINEER E SSS /0", 00 h SEAL i 141o1 a ��OOo y000M °P��0000 VHB Engineering NC, P.C. (C87057 9a0 Main Ca Raleigh mpuNC 2)fi0fis DMe, Sure 5W H 14014.00 SCALE: V=30' 11