Loading...
HomeMy WebLinkAbout20231421 Ver 1_Sandymush Creek EWP Dubuc PERMIT DRAWING_20231018© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS 10 0 Y R 10 0 Y R 100Y R 10 0 Y R WIL L O W C O V E R D B U S T E R B R A N C H R D W I L L O W C R E E K R D AMBIELLI SHARON; DUBUC SETH 8760182728 COMM COMM COMM COMM COMM COMM CO M M CO M M C O M M C O M M COMM G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - C O V E R & N O T E S . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 1 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 3 2 A M SCALE (34"X22"): SCALE (17"X11"): 1" = 200' 1" = 400' SCALE IN FEET 0 400'200' BUNCOMBE COUNTY EWP - SITE ID: SHARON DUBUC - 37-11-21-5042-308 SANDYMUSH CREEK - DUBUC BUNCOMBE COUNTY , NORTH CAROLINA LAT: 35.636873, LONG: -82.832742 PROJECT DIRECTORY PROJECT SPONSOR BUNCOMBE COUNTY SOIL & WATER CONSERVATION ANTHONY DOWDLE NCACSP SOIL CONSERVATIONIST ANTHONY.DOWDLE@BUNCOMBECOUNTY.ORG DESIGN TEAM ENGINEER JENNINGS ENVIRONMENTAL PLLC GREG JENNINGS, PHD, PE PRESIDENT GREG@JENNINGSENV.COM CONSTRUCTION CONTRACTOR TO BE DETERMINED PROPERTY OWNER(S) PIN OWNER 8760182728 AMBIELLI SHARON; DUBUC SETH PERMIT DRAWING NOT FOR CONSTRUCTION October 17, 2023 NRCS DESIGN CERTIFICATION: "TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT, AND BELIEF, THESE PLANS MEET APPLICABLE NRCS STANDARDS AND PERMITTING REQUIREMENTS." GREG JENNINGS, PHD, PE PRESIDENT, JENNINGS ENVIRONMENTAL PLLC PROJECT SITE ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G CO V E R S H E E T NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 1.1 SHEET INDEX COVER SHEET 1.1 GENERAL PROJECT NOTES AND SPECIFICATIONS 1.2 STREAM RESTORATION - PLAN 2.1 TYPICAL SECTION 3.1 STREAM RESTORATION PRACTICE DETAILS 4.1 - 4.2 EROSION & SEDIMENTATION CONTROL (ESC)5.1 - 5.3 RE-VEGETATION NOTES AND SCHEDULES 6.1 G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - C O V E R & N O T E S . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 1 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 3 3 A M GENERAL PROJECT NOTES AND SPECIFICATIONS SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE NRCS PRACTICE CODES ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G GE N E R A L P R O J E C T N O T E S A N D SP E C I F I C A T I O N S NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 1.2 1.DEFINITIONS: 1.1.CONSTRUCTION DOCUMENTS: THE CONTRACT AND APPLICABLE DRAWINGS, DETAILS, SPECIFICATIONS, PERMIT(S), AND/OR ANY OTHER DOCUMENTS (MEETING MINUTES, PUNCH LISTS, BID TABS, ETC.) FOR COMPLETE INFORMATION ABOUT THE REQUIRED WORK. ANY ONE OF THESE PARTS MAY NOT CONTAIN ALL OF THE INFORMATION REQUIRED TO COMPLETE THE PROJECT WORK. 1.2.ENGINEER: JENNINGS ENVIRONMENTAL PLLC 2.THE WORK ON THIS PROJECT SHALL ADHERE TO THE FOLLOWING SPECIFICATIONS, STANDARDS AND/OR REGULATIONS: 2.1.NC DEMLR'S "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" (2013) 2.2.NC DEMLR'S CONSTRUCTION GENERAL PERMIT NUMBER NCG01000 2.3.GENERAL, REGIONAL AND SPECIAL CONDITIONS OF USACE'S 404 NATIONWIDE PERMIT NUMBER 27 2.4.GENERAL AND SPECIAL CONDITIONS OF NCDWR'S 401 WATER QUALITY CERTIFICATION 4134 2.5.THE CONSTRUCTION DOCUMENTS 3.ALL EXISTING UTILITIES MAY NOT BE SHOWN. SOME LOCATIONS MAY BE APPROXIMATE. CONTRACTOR SHALL NOTIFY 'NC811' (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF 'NC811'. REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. ANY UTILITIES SHOWN ON THE CONSTRUCTION DOCUMENTS ARE FOR INFORMATIONAL PURPOSES ONLY AND IN NO WAY RELIEVES THE CONTRACTOR FROM COORDINATING, VERIFYING AND PROTECTING EXISTING UTILITIES. 4.ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR IS RESPONSIBLE FOR COORDINATING CONSTRUCTION ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANIES FOR ANY REQUIRED RELOCATIONS (I.E. POLES, METERS, FITTINGS, ETC.). 5.THE CONTRACTOR IS RESPONSIBLE FOR THE PROJECT AREA UNTIL COMPLETION AND FINAL ACCEPTANCE BY THE ENGINEER AND PROJECT OWNER. THE CONTRACTOR SHALL CONFINE ALL ACTIVITIES, INCLUDING EQUIPMENT STORAGE, TO THE LIMITS OF DISTURBANCE, STAGING AREAS, AND DESIGNATED CONSTRUCTION ACCESS POINTS. 6.THE MANNER IN WHICH THE CONTRACTOR DEALS WITH PEOPLE AND THEIR PROPERTIES WHILE PERFORMING THIS WORK IS EXTREMELY IMPORTANT. THEREFORE, THE CONTRACTOR AND THE CONTRACTOR'S REPRESENTATIVES SHALL MANIFEST A SPIRIT OF FRIENDLINESS AND COOPERATION WHEN DEALING WITH PROPERTY OWNERS AND THE GENERAL PUBLIC WHILE PERFORMING WORK ON THE SITE. 7.EXTREME CARE AND DILIGENCE SHALL BE EXERCISED BY THE CONTRACTOR TO ASSURE THE SAFETY OF PERSONS, ANIMALS, AND PROPERTY. IF AT ANY TIME THE OWNER OR ENGINEER DETERMINES THAT THE CONTRACTOR'S METHODS OR EQUIPMENT ARE INADEQUATE FOR SECURING THE SAFETY OF THE CONTRACTOR'S EMPLOYEES OR THE PUBLIC, THE DESIGNATED REPRESENTATIVE MAY DIRECT THE CONTRACTOR TO TAKE SPECIFIC ACTIONS TO ENSURE SAFETY. THE CONTRACTOR SHALL IMPROVE METHODS AS DEEMED APPROPRIATE BY THE DESIGNATED REPRESENTATIVE WITHOUT ADDITIONAL COST TO THE PROJECT OWNER, SO AS TO ASSURE COMPLIANCE WITH SAFETY CONCERNS. FAILURE OF THE DESIGNATED REPRESENTATIVE TO MAKE THIS DEMAND SHALL NOT RELIEVE THE CONTRACTOR OF ANY OBLIGATION TO ENSURE THE SAFE CONDUCT OF ITS WORK. 8.THE CONTRACTOR SHALL MAINTAIN ALL LIGHTS, GUARDS, SIGNS, TEMPORARY PASSAGES, OR OTHER PRECAUTIONS NECESSARY FOR THE SAFETY OF ALL PERSONS. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND CONSTRUCTION CONDITIONS REQUIRED BY GOVERNMENTAL AUTHORITIES AND OTHER ENTITIES, INCLUDING RAILROADS, SO THE PUBLIC IS SAFEGUARDED FROM ACCIDENTS AND DELAYS. GUARDS AND FLAGS REQUIRED BY GOVERNMENTAL OR RAILROAD AUTHORITIES SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE, UNLESS DIRECTED OTHERWISE BY THE DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL AT NO TIME COMPROMISE EITHER SAFETY OR ENVIRONMENTAL REQUIREMENTS. 9.THE CONTRACTOR SHALL ONLY USE ACCESS PATHS AND STAGING AREAS SHOWN ON THE DRAWINGS. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY THE ENGINEER AND PROJECT OWNER PRIOR TO USE. 10.NO NON-PERMITTED FILL IN WETLANDS MAY OCCUR. ALL EXCESS SOILS FROM STABILIZATION AND GRADING WORK SHALL BE PLACED IN DESIGNATED AREAS ON THE SITE. 11.SITE SHOULD BE “STORM READY” AT THE END OF EACH WORK DAY AND WORK WEEK. TOPOGRAPHIC NOTES AND SPECIFICATIONS 12.HORIZONTAL DATUM IS NAD83(2011) & VERTICAL DATUM IS NAVD88. ALL COORDINATES ARE BASED ON NAD83(2011) AND ALL ELEVATIONS ARE BASED ON NAVD88. 13.THE DESIGN ELEVATIONS AND GRADES SHOWN IN THE DRAWINGS ARE BASED ON NORTH CAROLINA SPATIAL DATA DOWNLOAD LIDAR DIGITAL ELEVATION MODELS (DEM) FROM WHICH ALL COMPUTATIONS OF CUT AND FILL ARE BASED. DISCREPANCIES BETWEEN THE SURVEYED EXITING GROUND SURFACE AND FIELD CONDITIONS AT THE TIME OF CONSTRUCTION CAN RESULT IN VARIATIONS OF TOTAL EXCAVATED QUANTITIES. THESE VARIATIONS SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. STREAM RESTORATION NOTES AND SPECIFICATIONS 14.FIELD CONDITIONS MAY REQUIRE ADAPTATION OF THE DESIGN AND/OR DETAILS PROVIDED IN THE DRAWINGS. MINOR VARIATION(S) OR ADAPTATION(S) OF THE PROPOSED WORK SHOWN IN THE DRAWINGS AND DETAILS ARE CONSIDERED INCIDENTAL TO THE WORK. THE ENGINEER WILL WORK WITH THE CONTRACTOR TO ADDRESS ANY FIELD CHANGES. 15.THE CONTRACTOR SHALL MARK THE LOCATIONS OF BANK STABILIZATION STRUCTURES USING SURVEY GRADE GPS EQUIPMENT FOR REVIEW BY THE ENGINEER BEFORE BEGINNING EXCAVATION AND GRADING. 16.CONTRACTOR SHALL MINIMIZE, TO THE MAXIMUM EXTENT POSSIBLE, IMPACTS TO ADJACENT SIGNIFICANT TREES. 17.CONTRACTOR SHALL USE AN EXCAVATOR WITH A HYDRAULIC THUMB TO INSTALL BANK STABILIZATION STRUCTURES. 18.DESIGN ELEVATIONS SHALL BE CONSTRUCTED WITHIN 0.1' (VERTICAL). WIDTHS AND DEPTHS MUST FALL WITHIN RANGES SHOWN IN THE DRAWINGS AND DETAILS. 19.IF THE EXISTING GROUND IS LESS THAN 0.2' HIGHER THAN THE PROPOSED BANKFULL ELEVATION, IT IS NOT NECESSARY TO EXCAVATE TO THE PROPOSED ELEVATIONS AND GRADES IN THE CONSTRUCTION DOCUMENTS. 20.BANK STABILIZATION STRUCTURES SHALL BE INSTALLED AS SHOWN IN THE DRAWINGS AND DETAILS. ALL STRUCTURES SHALL BE FINISHED TO A SMOOTH SURFACE IN ACCORDANCE WITH THE LINES, GRADES AND ELEVATIONS SHOWN IN THE DRAWINGS AND DETAILS. THE FINISHED STRUCTURE SLOPES AND GRADES SHALL BE WITHIN 0.1' OF DESIGN ELEVATIONS. 21.THE GRADED RIVER BANKS SHALL BE STABILIZED AS SOON AS POSSIBLE BY TEMPORARY AND PERMANENT SEEDING, ADDING STRAW MULCH TO BARE SOIL AND INSTALLING EROSION CONTROL MATTING AS SHOWN IN THE DRAWINGS AND DETAILS. PRIOR TO INSTALLING THE EROSION CONTROL MATTING, PREPARE THE SOIL SURFACE BY LOOSENING 3 - 6” OF SOIL OR APPLYING 3 - 6” OF TOPSOIL TO THE DESIGN ELEVATIONS AND APPLY TEMPORARY AND PERMANENT SEED AND THEN STRAW MULCH. SEED SHALL BE BROADCAST EVENLY OVER THE AREA USING A BROADCAST SPREADER PRIOR TO COVERING WITH THE EROSION CONTROL MATTING. THE MATTING SHALL BE ROLLED OUT IN THE DIRECTION OF ANTICIPATED RUNOFF. INSTALL MATTING IN ACCORDANCE WITH THE DETAIL INCLUDED IN THE DRAWINGS. MATTING USED FOR STREAMBANK STABILIZATION MUST BE CERTIFIED WEED-FREE STRAW OR OTHER NATURAL WEED-FREE / NON-PROPAGATING VEGETATIVE MATERIALS. REWORKING OF AREAS THAT DO NOT ESTABLISH VEGETATION OR BECOME UNSTABLE SHALL BE NECESSARY IN THE MATTING SEPARATES FROM THE SOIL. 22.TOPSOIL SHALL BE REMOVED FROM EXCAVATION AND FILL AREAS PRIOR TO EXCAVATION AND GRADING AND RE-APPLIED TO AREAS AFTER ROUGH GRADING IS COMPLETE. 2 - 4” OF TOPSOIL SHALL BE PLACED ON DISTURBED AREAS TO THE ELEVATIONS AND GRADES INCLUDED IN THE DRAWINGS. EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS. 23.ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NCDEMLR'S NG01 CONSTRUCTION GENERAL PERMIT. 24.ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 25.ALL WETLANDS AND STREAMS LOCATED WITHIN 50 FEET OF THE CONSTRUCTION AREA ON THE PROJECT SITE SHALL BE CLEARLY MARKED (EXAMPLE- ORANGE FABRIC FENCING) PRIOR TO ANY LAND DISTURBING ACTIVITIES AND MUST BE MAINTAINED ON THE PROPERTY UNTIL THE PROJECT PHASE IS COMPLETED [15A NCAC 02H .0506 (B)(2)]. 26.THE CONTRACTOR SHALL USED A STANDARD CONSTRUCTION ENTRANCE AT ALL SITE ACCESS POINTS TO PREVENT SEDIMENT FROM BEING TRACKED ONTO PUBLIC ROADS. 27.THE CONTRACTOR SHALL USED TEMPORARY SILT FENCE ALONG THE DOWNSLOPE SIDE OF ALL STAGING AREAS AND TEMPORARY STOCK PILE AREAS. 28.THE TURBIDITY IN THE RECEIVING WATERS SHALL NOT EXCEED 50 NEPHELOMETRIC TURBIDITY UNITS (NTU) IN STREAMS NOT DESIGNATED AS TROUT WATERS AND 10 NTU IN STREAMS, LAKES, OR RESERVOIRS DESIGNATED AS TROUT WATERS, AS DESCRIBED IN 15A NCAC 02B .0200. APPROPRIATE SEDIMENT AND EROSION CONTROL PRACTICES MUST BE USED TO MEET THIS STANDARD. [15A NCAC 02B .0211 (21)]. 29.EQUIPMENT SHALL BE WELL-MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING, LUBRICATION AND GENERAL EQUIPMENT MAINTENANCE SHOULD NOT TAKE PLACE WITHIN 50 FEET OF A WATERBODY OR WETLANDS TO PREVENT CONTAMINATION BY FUEL AND OILS. [15A NCAC 02H .0506 (B)(3) AND 15A NCAC 02B.0211(12)]. 30.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 31.THE DESIGNER OR HIS DESIGNEE SHALL SUPERVISE THE INSTALLATION OF IN-STREAM STRUCTURES. [15A NCAC 02H .0506(B)(1) AND (2)]. 32.A TEMPORARY DIVERSION AND/OR PUMP AROUND SYSTEM SHALL BE USED TO DURING ALL STREAM RESTORATION AND STABILIZATION WORK AS SHOWN IN THE DETAILS. TEMPORARY PUMP AROUND SYSTEM SHALL BE USED AT PROJECT SITES WHERE THE WATERSHED SIZE IS LESS THAN 2 SQUARE MILES. 33.THE STREAM BANKS, IN-STREAM STRUCTURES, AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN-STREAM DIVERSIONS AND/OR PUMP AROUND SYSTEM(S) ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 34.EROSION CONTROL MATTING THAT INCORPORATES PLASTIC MESH AND/OR PLASTIC TWINE SHALL NOT BE USED ALONG STREAMBANKS OR WITHIN WETLANDS. DISTURBED AREAS SHOULD BE SEEDED, MULCHED, AND/OR MATTED AS SOON AS POSSIBLE, PREFERABLY AT THE END OF EACH WORKDAY. [15A NCAC 02B .0201] 35.IF BORROW OR WASTE MATERIAL IS REQUIRED OR GENERATED DURING GRADING OPERATIONS, AN APPROVED EROSION AND SEDIMENT CONTROL PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY. [15A NCAC 04B .0110]. QUANTITIES AND MATERIALS NOTES AND SPECIFICATIONS 36.THE CONTRACTOR SHALL FURNISH ALL MATERIALS NECESSARY TO COMPLETE THE PROPOSED WORK UNLESS OTHER PROVISIONS HAVE BEEN AGREED UPON PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL DELIVER ALL MATERIALS TO THE DESIGNATED ACCESS POINTS AND STAGING AREAS. MATERIAL QUANTITIES, DIMENSIONS AND SIZES SHALL CONFORM TO THE NOTES AND SPECIFICATIONS PROVIDED IN THE CONSTRUCTION DOCUMENTS. THE ENGINEER MAY INSPECT AND APPROVE ALL MATERIALS PRIOR TO CONSTRUCTION. IF MATERIALS DO NOT MEET THE MINIMUM REQUIREMENTS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THE ENGINEER SHALL REJECT THE MATERIALS. 37.COSTS INCURRED DUE TO PROJECT DELAYS RESULTING FROM FAILURE OF THE CONTRACTOR TO MEET THE REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS SHALL BE THE EXPENSE OF THE CONTRACTOR. QUANTITIES LISTED ARE ESTIMATES ONLY AND SHALL BE CONFIRMED BY THE CONTRACTOR. 38.THE EROSION CONTROL MEASURES DEPICTED ON THE DRAWINGS SHALL BE INSTALLED AS NEEDED TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. ADDITIONAL EROSION CONTROL MEASURES (ABOVE THOSE SHOWN ON THE DRAWINGS) MAY BE REQUIRED IN ORDER TO KEEP ALL SEDIMENT ON SITE AND OUT OF STREAMS AND WETLANDS. THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE PROJECT OWNER AND ENGINEER PRIOR TO INSTALLATION OF ADDITIONAL EROSION CONTROL MEASURES. 39.ANY ADDITIONAL GRADING OTHER THAN WHAT IS SHOWN ON THE PLANS SHALL REQUIRE PRIOR APPROVAL FROM THE PROJECT OWNER AND ENGINEER. 40.THE USE OF ANY BRAND NAMES/MANUFACTURERS OR MODELS IS INTENDED SOLELY TO DENOTE THE QUALITY STANDARD OF THE DESIRED PRODUCT. ANY USE OF BRAND NAMES IS NOT INTENDED TO RESTRICT BIDDERS TO A SPECIFIC BRAND, MAKE, MANUFACTURER, OR NAME. THE BRAND NAMES / MANUFACTURERS OF MODELS ARE INTENDED TO CONVEY THE GENERAL STYLE, TYPE, CHARACTER, AND QUALITY OF PRODUCT. EQUIVALENT PRODUCTS WILL BE ACCEPTABLE IF THE PROJECT OWNER OR ENGINEER HAS GIVEN APPROVAL OF THE SPECIFIC PRODUCT IN WRITING. 41.THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROVIDING STORAGE AREAS FOR CONSTRUCTION MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT STORAGE SHALL COMPLY WITH THE CONSTRUCTION DOCUMENTS AND ALL LOCAL, STATE AND FEDERAL REGULATIONS THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL RESTORE THE STORAGE AREA TO ITS ORIGINAL (OR BETTER) CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. SUCH RESTORATION SHALL BE AT NO ADDITIONAL COST TO THE PROJECT OWNER. © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS AMBIELLI SHARON; DUBUC SETH 8760182728COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM 4020 G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - P L A N & S E C T I O N . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 3 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 4 4 A M 1" = 20' 1" = 40' SCALE (34"X22"): SCALE (17"X11"): SCALE IN FEET 0 NOTES: - SUPPLEMENT EX. ROCK MATERIAL PLACED DOWNSTREAM OF THE BRIDGE. ROCK MATERIAL MAY BE RE-USED FOR 580 - STREAMBANK STABILIZATION, AT THE DIRECTION OF THE ENGINEER. - EX. PHONE LINE RUNS ALONG DRIVEWAY. -CONTRACTOR TO IDENTIFY AND PROTECT EX. UTILITIES. -DEBRIS SHALL BE DISPOSED ON HIGH GROUND OUTSIDE OF THE FEMA 100-YR FLOODPLAIN. -ONSITE DEBRIS DISPOSAL SHALL BE LOCATED IN AN AREA OUTSIDE THE 100-YEAR FLOODPLAIN WITH LOCATION PROVIDED BY LANDOWNER AND APPROVED BY PROJECT ENGINEER. -RESTORE ACCESS PATHS AND STORAGE AREA(S) TO ORIGINAL CONDITION UPON COMPLETION OF THE PROJECT OR UPON SUCH TIME AS DIRECTED BY THE PROJECT OWNER AND ENGINEER. -DISTURBANCE OF TREES AND/OR WOODY VEGETATION SHALL BE KEPT TO THE MINIMUM EXTENT PRACTICABLE TO COMPLETE WORK. -CONTRACTOR TO REMOVE WIRE LIVESTOCK FENCE AS NEEDED FOR SITE ACCESS IN THE PROJECT AREA. OWNER TO RE-INSTALL FENCE UPON COMPLETION OF PROJECT. EX. BRIDGE (TO REMAIN) 580 - STREAMBANK STABILIZATION, 160 LF PLAN VIEW LEGEND 580 - STREAMBANK STABILIZATION SEE DETAILS, SHEETS 4.1 - 4.2 EXISTING STREAM CENTERLINE PROPERTY LINE EX. CONTOUR (1 FT) FLOW DIRECTION A A' ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G PL A N NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 2.1 FEMA FLOODWAYFWAY FEMA 100 YR FLODPLAIN 100YR FEMA 500 YR FLOODPLAIN 500YR OVERHEAD TELEPHONE LINE COMM SEE DETAIL SHEET 4.1 FOR BANK TREATMENT. PRESERVE LARGE WILLOW TREE & TRIM BRANCHES AS NEEDED FOR EQUIPMENT ACCESS SEE DETAIL SHEET 4.2 FOR BANK TREATMENT TypSect - SCALE: HOR 1" =30'; VERT 1"= 15' 2595 2600 2605 2610 2615 2620 2595 2600 2605 2610 2615 2620 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+45 G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - P L A N & S E C T I O N . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 3 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 4 8 A M SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE TYPICAL SECTION CHANNEL SECTION SPECIFICATIONS SECTION A - A' MAINTAIN CHANNEL DIMENSION & CAPACITY BANKFULL STAGE CHANNEL SECTION DESIGN CENTERLINE ALIGNMENT 22.3' ± d = 1.3'± ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G TY P I C A L S E C T I O N & D E S I G N C H A N N E L SP E C I F I C A T I O N S NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 3.1 AVERAGED CHANNEL DATA: FROM LIDAR AND REGIONAL CURVE DATA BANKFULL WIDTH (FT): 22.3 BANKFULL FLOW AREA (FT2): 29.0 BANKFULL HYDRAULIC RADIUS (FT): 1.2 MANNINGS N VALUE: 0.035 CHANNEL SLOPE (FT/FT): 0.05 CALCULATED AVERAGE CHANNEL CAPACITY (IMPERIAL UNITS): Q = (1.49 / N)*AREA*(HYD. RADIUS)^(2 / 3) * (SLOPE)^(1 / 2) Q (FT3/S) = 307 1.INSTALL STREAMBANK STABILIZATION PRACTICES AS SHOWN ON THE DRAWINGS AND DETAILS. CONTRACTOR SHALL NOT INCREASE CAPACITY OF THE CHANNEL BEYOND THE PRE-DISASTER CAPACITY AS DOCUMENTED. 2.FINISHED SURFACE OF STREAMBANKS AND STABILIZATION PRACTICES SHALL MATCH PRE-DISASTER CHANNEL DIMENSION AND CAPACITY. ELEVATIONS AND DEPTHS SHALL BE CONSTRUCTED TO WITHIN 0.1' (VERTICAL). CHANNEL WIDTHS AND OTHER HORIZONTAL (X,Y) DIMENSIONS SHALL BE WITHIN 0.2'. APPROX. PR GRADE G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - D E T A I L S . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 5 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 5 6 A M NOT TO SCALE SCALE (34"X22"): SCALE (17"X11"): NTS NTS STREAMBANK STABILIZATION - STRUCTURAL NOTES AND SPECIFICATIONS 1.ALL STREAMBANK STABILIZATION - STRUCTURAL WORK SHALL TAKE PLACE DURING DRY WORKING CONDITIONS. THE CONTRACTOR SHALL MINIMIZE THE EXPORT OF SEDIMENT TO ADJACENT SURFACE WATERS TO THE MAXIMUM EXTENT PRACTICABLE BY USING ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES AS NEEDED OR AS DIRECTED BY THE ENGINEER ONSITE. 2.FOR IMPLEMENTATION, THE CONTRACTOR SHALL PREPARE THE EXISTING STREAMBANK AND INSTALL 8 OZ. NON-WOVEN FILTER FABRIC, AS NEEDED. STABILIZATION MATERIAL SHALL BE PLACED ON THE PREPARED SLOPE TO A MINIMUM DEPTH OF 2.0 FEET. LARGER MATERIAL IS TO BE PLACED IN A TOE TRENCH AT THE EXISTING TOE OF SLOPE. 3.ROCK MATERIAL USED FOR STRUCTURAL STREAMBANK STABILIZATION SHALL CONSIST OF 100% NCDOT CLASS 2 RIPRAP. ALL MATERIALS ARE TO BE APPROVED BY THE ENGINEER. RIPRAP SHALL BE INSTALLED IN LIFTS NOT TO EXCEED 2.0'. EACH LIFT SHALL BE COMPACTED WITH THE EXCAVATOR BUCKET TO FORM A DENSE LAYER OF COMPACTED ROCK MATERIAL TO LINES, ELEVATIONS AND GRADES IN THE DRAWINGS AND DETAILS. 4.KEY EROSION CONTROL MATTING IN AT INTERFACE WITH STRUCTURAL STREAMBANK STABILIZATION AND INSTALL MATTING ON ALL DISTURBED RIVER BANKS. 5.TRANSPLANTS AVAILABLE ONSITE MAY BE INSTALLED IN THE TOPSOIL AS DIRECTED BY THE ENGINEER ONSITE. 6.THE SURFACE OF THIS FEATURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. 7.STABILIZATION OF THE WORK AREA WITH TEMPORARY AND PERMANENT SEEDING AND MULCHING IS REQUIRED FOLLOWING GRADING OF THE STREAMBANK. INSTALL WOODY PLANTING AND VEGETATION AS SHOWN ON THE APPROVED RE-VEGETATION PLAN. FL O W MIN. 3.0' TIE TO EXISTING TOP OF BANK DETAILED SECTION A - A' NOT TO SCALE DETAILED PLAN NOT TO SCALE EX. TOP OF BANK MIN. 2.0 FT MIN. 2.0 FT VARIES (MAX. 2.0' ABOVE BANKFULL) COMPACTED BACKFILL NON-WOVEN GEOTEXTILE OR BEDDING MATERIAL, AS NEEDED TIE TO EXISTING GRADE EX. STREAMBED MATCH EX. GRADE MAX. 2:1 INSTALL EROSION CONTROL MATTING OR LIVE TRANSPLANTS AS DIRECTED BY THE ENGINEER ON ALL DISTURBED STREAMBANKS. STREAMBANK STABILIZATION - STRUCTURAL MATERIAL, SEE NOTE 3. ST R E A M B A N K S T A B I L I Z A T I O N LE N G T H V A R I E S P E R P L A N A A' VARIES (EXTEND TO TOP OF BANK) ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G ST R E A M B A N K S T A B I L I Z A T I O N NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 4.1 G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - D E T A I L S . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 5 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 5 8 A M NOT TO SCALE SCALE (34"X22"): SCALE (17"X11"): NTS NTS ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G ST R E A M B A N K S T A B I L I Z A T I O N NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 4.2 G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - D E T A I L S . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 5 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 6 : 5 8 A M 1.ALL BOULDERS SHALL BE STRUCTURAL STONE, CUBICAL OR RECTANGULAR IN SHAPE. BOULDERS AVAILABLE ONSITE MAY BE USED IF APPROVED BY THE ENGINEER. BOULDERS SHALL BE 3.0' X 5.0' X 3.0' (W X L X H) +/- 0.5'. THE MINIMUM ACCEPTABLE BOULDER THICKNESS (H) IS 2.5'. BOULDERS LONGER (L) THAN 5.5' WILL BE ACCEPTED. 2.A BEDDING COURSE CONSISTING OF NCDOT CLASS A RIPRAP SHALL BE INSTALLED BELOW THE FIRST ROW OF BOULDERS. IF BEDROCK IS ENCOUNTERED ONSITE, THE FIRST LIFT OF BOULDERS SHALL BE PLACED DIRECTLY ON THE BEDROCK. ALL BOULDERS SHALL FIT TIGHTLY TOGETHER. INSTALL EACH LIFT OF BOULDERS WITH A 1.5' SETBACK FROM THE FRONT EDGE OF THE PREVIOUS LIFT OF BOULDERS. 3.UNCONSOLIDATED GRAVEL AND TOPSOIL SHALL BE INSTALLED AS A LEVELING COURSE THE ABOVE BOULDERS BEFORE THE LIVE CUTTINGS AND SOIL LIFTS ARE INSTALLED. 4.PLACE LAYER OF LIVE CUTTINGS (MIN. 4' LENGTH) A 1.0' O.C. ON THE GRAVEL AND TOPSOIL SUCH THAT APPROXIMATELY 6 INCHES TO 1 FOOT OF EACH LIVE BRANCH WILL BE EXPOSED AND THE REMAINDER (2' TO 4') OF EACH LIVE BRANCH WILL BE COVERED BY THE SOIL LIFT. LIVE BRANCHES SHALL BE OF THE SPECIES SPECIFIED FOR LIVE STAKES OR APPROVED BY THE ENGINEER. 5.INSTALL SOIL LIFTS FROM THE FIRST ROW OF LIVE CUTTINGS UP TO THE EXISTING TOP OF BANK ELEVATION. LIFTS SHALL NOT EXCEED 1.0' THICKNESS. LIFTS SHALL INCLUDE ALL SOIL PREPARATION, TEMPORARY AND PERMANENT SEEDING AND MULCH. SOIL LIFTS SHALL USE 2 LAYERS OF MATTING: 24 OZ. / YD2 COIR MATTING (OUTER) AND 11 OZ./YD2 COCONUT FIBER BLANKET (INNER). EROSION CONTROL MATTING USED FOR SOIL LIFTS SHALL BE MADE OF 100% NATURAL FIBERS AND MATERIALS AND BE BIODEGRADABLE UNDER NORMAL CLIMATE CONDITIONS. EROSION CONTROL MATTING CONTAINING PLASTICS OR PLASTIC BASED MATERIALS SHALL NOT BE USED. 6.PLACE SOIL BACKFILL UP TO THE LIFT HEIGHT SPECIFIED OF NO GREATER THAN 1.0 FT BEING CAREFUL NOT TO PUSH/PULL OR TEAR THE FABRIC PREVIOUSLY PLACED. 7.REPEAT STEPS #4, #5 AND #6 AS NEEDED TO INSTALL SOIL LIFTS UP TO THE BANKFULL STAGE. 8.THE SURFACE OF THIS STRUCTURE SHALL BE FINISHED TO A SMOOTH AND COMPACT SURFACE IN ACCORDANCE WITH THE LINES, GRADES, AND CROSS-SECTIONS OR ELEVATIONS SHOWN ON THE DRAWINGS. THE DEGREE OF FINISH FOR ELEVATIONS SHALL BE WITHIN 0.1 FT OF THE GRADES AND ELEVATIONS INDICATED OR APPROVED BY THE ENGINEER. 9.RE-DRESSING OF CHANNEL AND BANKFULL BENCH/FLOODPLAIN WILL LIKELY BE REQUIRED FOLLOWING INSTALLATION OF IN-STREAM STRUCTURES AND SHALL BE CONSIDERED INCIDENTAL TO CONSTRUCTION. UNCONSOLIDATED GRAVEL AND TOPSOIL LIVE CUTTINGS BETWEEN LIFTS SOIL LIFTS SHALL USE TWO LAYERS OF BIODEGRADABLE MATTING: 700 G/M2 COIR MATTING (OUTER) AND 320 G/M2 EROSION CONTROL BLANKET (INNER). LIVE STAKES AND BARE ROOT PLANTINGS FLO W BOULDER TOE PROTECTION BANKFULL LIVE CUTTINGS INSTALLED BETWEEN LIFTS 2.0' O.C. DETAILED PLAN NOT TO SCALE DETAILED SECTION A - A NOT TO SCALE SOIL GEOLIFTS TO EXISTING TOP OF BANK EXCAVATION LIMITS / EXISTING BANK WOOD STAKE 2" X 2" X 18" - 36" BOULDERS COMPACTED ONSITE BACKFILL 2.0' MIN 1.0' MAX PLACE BOULDERS ON ROCK BEDDING AND LEVELING COURSE 1.5' NON-WOVEN FILTER FABRIC 9.0' MIN NCDOT CLASS A ROCK BACKFILL AND BEDDING COURSE 8.0' MIN TOP OF BOULDERS EXISTING TOP OF BANK 2.0' MAX 1.0' MAX PLACE FIRST COURSE OF BOULDERS BELOW STREAMBED A A ' STREAMBANK STABILIZATION - STRUCTURAL NOTES AND SPECIFICATIONS © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS COMM COMM COMM COMM COMM COMM COMM COMM COMM LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLOD LOD L O D L O D LOD SF SF P > > > > > > G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - E S C . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 4 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 7 : 0 8 A M SCALE (34"X22"): SCALE (17"X11"): LIMITS OF DISTURBANCE (LOD) = 0.28 AC. TEMPORARY SILT FENCE TEMPORARY STAGING AND STORAGE AREA STABILIZE STREAMBANKS WITH EROSION CONTROL MATTING TEMPORARY PUMP AROUND TEMPORARY CONSTURCTION ENTRANCE. SEE SHEET 5.2. LOD LOD SF SF LIMITS OF DISTURBANCE SILT FENCE STAGING AND STORAGE AREA STABILIZED CONSTRUCTION ENTRANCE CONSTRUCTION ACCESS ROUTE EROSION AND SEDIMENTATION CONTROL LEGEND NOTES: -CONTRACTOR TO REMOVE WIRE LIVESTOCK FENCE AS NEEDED FOR SITE ACCESS IN THE PROJECT AREA. OWNER TO RE-INSTALL FENCE UPON COMPLETION OF PROJECT. SCALE IN FEET 0 20 40 1" = 20' 1" = 40' TEMP. ACCESS PATH (12' WIDE TYP.) ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G ES C P L A N NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 5.1 P >>> WORK AREA TEMPORARY PUMP AROUND G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - E S C . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 4 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 7 : 0 8 A M SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE EROSION AND SEDIMENTATION CONTROL NOTES AND SPECIFICATIONS SEQUENCE OF CONSTRUCTION 1.ALL CONSTRUCTION ACTIVITIES SHALL ADHERE TO THE CONDITIONS AND REQUIREMENTS OF NC DEMLR'S NG01 CONSTRUCTION GENERAL PERMIT. 2.ALL TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED UNLESS MARKED FOR REMOVAL OR RELOCATION. 3.EQUIPMENT SHALL BE WELL-MAINTAINED, CLEANED PRIOR TO MOBILIZATION, AND CHECKED DAILY FOR LEAKS OF PETROLEUM PRODUCTS. FUELING OPERATIONS SHALL BE PERFORMED IN A CONTAINED AREA AWAY FROM SURFACE WATER. 4.ALL WORK IN OR ADJACENT TO STREAMS AND RIVERS SHALL BE CONDUCTED SUCH THAT THE FLOWING WATER DOES NOT COME IN CONTACT WITH THE DISTURBED WORK AREA. 5.UTILIZE A TEMPORARY IN-STREAM DIVERSION AT ALL TIMES WHEN WORKING IN THE ACTIVE STREAM CHANNEL. SEE DETAIL, SHEET 5.3. 6.CONSTRUCTION SHALL BE TIMED TO OCCUR DURING TIMES OF LOW FLOW. 7.CONSTRUCTION SCHEDULING AND STAGING SHALL BE TIMED TO MINIMIZE THE AMOUNT OF TIME SPENT WORKING IN THE RIVER CHANNEL. 8.THE RIVERBANKS, IN-STREAM STRUCTURES AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE TEMPORARY IN-STREAM DIVERSIONS ARE REMOVED AND FLOW IS RETURNED THE FULL CHANNEL. 9.ALL WASTE SOIL SHALL STAY ONSITE AND WILL BE DISPOSED OF IN AREAS DESIGNATED ON THE PLANS. THE WASTE SOIL FOR THE FUTURE WALKING TRAIL SHALL BE ROUGH-GRADED AND STABILIZED WITH TEMPORARY AND PERMANENT SEEDING AND MULCH 1.OBTAIN AND REVIEW THE BUNCOMBE COUNTY EWP SANDYMUSH CREEK - DUBUC PROJECT, EROSION AND SEDIMENTATION CONTROL PLAN AND ALL OTHER APPLICABLE PERMITS. 2.FLAG THE WORK LIMITS AND STAKE OUT THE LIMITS OF DISTURBANCE (LOD) OF THE PROJECT. THE TOTAL PROJECT LOD IS 0.28 AC. 3.LOCATE ALL UNDERGROUND UTILITIES WITHIN THE WORK AREA. 4.INSTALL RAIN GAUGE AND PREPARE INSPECTION FORMS. 5.HOLD PRE-CONSTRUCTION MEETING WITH THE PERMITTEE, ENGINEER AND CONTRACTOR PRIOR TO STARTING ANY LAND DISTURBING ACTIVITIES. 6.INSTALL ALL EROSION AND SEDIMENTATION CONTROL BMPS AS SHOWN IN THE DRAWINGS AND DETAILS. 7.INSPECT EROSION PREVENTION AND SEDIMENT CONTROL BMPS DAILY AND AFTER SIGNIFICANT RAINFALL EVENTS. MAKE NEEDED REPAIRS IMMEDIATELY. KEEP ALL LOGS AND RECORDS UP-TO-DATE. 8.ACQUIRE AND STORE MATERIALS FOR SITE (E.G. ROCK, LOGS, EROSION CONTROL MATTING AND FILTER FABRICS) IN THE TEMPORARY STAGING AREAS. 9.CLEAR EXISTING VEGETATION REQUIRED TO COMPLETE THE WORK TAKING CARE NOT TO DISTURB DESIRABLE VEGETATION TO REMAIN INTACT. 10.GRADE THE RIVER BANKS AND INSTALL BANK STABILIZATION STRUCTURES ACCORDING TO THE PLANS AND DETAILS. WHEN POSSIBLE, PERFORM WORK FROM THE RIVER BANKS TO MINIMIZE TIME SPENT WORKING IN THE CHANNEL. 11.WHEN WORKING IN THE CHANNEL, UTILIZE A TEMPORARY IN-STREAM DIVERSION. 12.INSTALL TEMPORARY SEEDING, PERMANENT SEEDING, AND EROSION CONTROL MATTING ON ALL DISTURBED RIVER BANKS AND GRADED SLOPES AS SHOWN ON SHEET 5.3. 13.INSTALL TEMPORARY AND PERMANENT SEEDING AND MULCH TO ALL AREAS DISTURBED FOR CONSTRUCTION ACCESS AND STAGING AS SHOWN ON SHEET 5.1. 14.ONCE THE WORK AREA IS STABILIZED AND CONSTRUCTION ACTIVITIES ARE COMPLETED, REMOVE AND DISPOSE OF ALL NON-BIODEGRADABLE EROSION AND SEDIMENTATION CONTROL BMPS. 15.NOTIFY THE PERMITEE AND THE ENGINEER FOR A FINAL INSPECTION AND WALK THROUGH TO VERIFY FINAL STABILIZATION OF THE SITE. 16.WHEN SEASONALLY APPROPRIATE, INSTALL PERMANENT PLANTINGS ON RIVER BANKS AND WITHIN THE RIPARIAN ZONES AS SHOWN ON SHEET 6.1. ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G ES C N O T E S A N D S P E C I F I C A T I O N S & SE Q U E N C E O F C O N S T R U C T I O N NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 5.2 G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - E S C . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 4 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 7 : 1 3 A M SCALE (34"X22"): SCALE (17"X11"): NTS NTS NOT TO SCALE NOTES: 1.Lime, fertilize and seed before installation. Planting of shrubs, trees, etc. should occur after installation. 2.Slope surface shall be smooth before placement for proper soil contact. 3.Design velocities exceeding 2 feet/second require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes established. 4.Terminal anchor trenches are required at RECP ends and intermittent check slots must be constructed across channels at 25 foot intervals. 5.Terminal anchor trenches should be a minimum of 12 inches in depth and 6 inches in width. Intermittent check slots should be 6 inches deep and 6 inches wide. 6.For installation on a slope, place RECP 2-3 feet over the top of the slope and into an excavated end trench measuring approximately 12 inches deep by 6 inches wide. Pin the RECP at 1 foot intervals along the bottom of the trench, backfill and compact. Unroll the RECP down the slope maintaining direct contact between the soil and RECP. Pin using staples or pins in a 3 feet center-to-center pattern. 7.11 gauge, at least 6 inch by 1 inch staples or 12 inch minimum length wooden stakes are recommended for anchoring. 8.Grass-lined channels with design velocities exceeding 6 feet/second should include turf reinforcement mats 9.Check slots to be constructed per manufacturers specifications. 10.Staking or stapling layout per manufacturers specification. 11.If there is a berm at the top of slope, anchor upslope of the berm. 12.Do not stretch blankets/matting tight, allow the rolls to conform to any irregularities. 13.For slopes less than 3H:1V, rolls may be placed in horizontal strips. MAINTENANCE: 1.Inspect Rolled Erosion Control Products at least weekly and after each rain of 1 inch or greater; repair immediately. 2.Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3.Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4.If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5.Monitor and repair the RECP as necessary until ground cover is established. Overlap 6" Min.Longitudinal Anchor Trench Overcut channel 2" to allow bulking during seedbed preparation Design Depth 6" Min. 6" Min. Typical installation with erosion control blankets or turf reinforcement mats Intermittent check slot Longitudinal anchor trench Single-lap spliced ends or begin new roll in an intermittent check slot FLOWPrepare soil and apply seed before installing blankets, mats or other temporary channel liner systems 6" Min. Overlap Anchor 6"x6" min. Trench and staple at 12" intervals Staple Overlaps Max. 5" spacing 3" Min. Overlap Bring material down to a level area, turn the end under 4" and staple at 12" intervals. Check Slots at 25' intervals Cha n n e l Bott o m Stakes at 3'-5' intervals Initial channel anchor trench 12" Terminal slope and channel anchor trench Construction: 1.Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade it. 2.Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3.Provide drainage to carry water to a sediment trap or other suitable outlet. 4.Use geotextile fabrics in order to improve stability of the foundation in locations subject to seepage or high water table. Maintenance: 1.Per NCG-01 inspect at least once a week and after each 1 inch or greater rainfall; make any required repairs immediately. 2.Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2 inch stone. 3.Immediately remove all objectionable materials spilled, washed or tracked onto public roadways. Pub l i c R o a d 2-3" Course Aggregate 6" Min. As R e q u i r e d 12' M i n . 50' M i n . o r T o F r o n t o f H o u s e Construction: 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may impound volumes of water sufficient to cause failure of the structure) 3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have a minimum 50 pound tensile strength. 5.When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely into the ground a minimum of 24 inches. 6.Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have a minimum of 50 pound tensile strength. 7.Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier. 8.Place 12 inches of fabric along the bottom and side of the trench. 9.Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10.Do not attach filter fabric to existing trees. Maintenance: 1.Inspect sediment fences at least once a week and after each 1 inch or greater rainfall. Make any required repairs immediately. 2.Should the fabric of a sediment fence collapse, tear, decompose, or become ineffective, replace it promptly. 3.Remove sediment deposits as necessary to provide adequate storage volume for the next rain and reduce pressure on the fence. Take care to avoid undermining the fence during cleanouts. 4.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. Steel Post 8' Max. Standard Strength fabric with wire fence 6' Max. Extra strength fabric without wire fence 18-24" 8" down & 4" forward along the trench24" Wire Fence Filter Fabric Plastic or Wire ties 24" 8" Min. 4" Min. Backfill trench and Compact thoroughly Upslope Wire Fence Filter Fabric Steel Post Plastic or Wire CROSS SECTION VIEW STANDARD CONSTRUCTION ENTRANCE / EXIT ROLLED EROSION CONTROL PRODUCTS (RECP)TEMPORARY SILT FENCE ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G ES C D E T A I L S NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 5.3 TEMPORARY PUMP AROUND NOTES AND SPECIFICATIONS: 1.BERMS SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. DIVERSION PUMP DISCHARGE SHALL NOT GENERATE SCOUR, EROSION, OR THE EXPORT OF EXCESS SEDIMENT TO SURFACE WATERS. 2.WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK. 3.THE CONTRACTOR SHALL SIZE THE PUMP AROUND SYSTEM SUFFICIENTLY FOR A RANGE OF POSSIBLE BASEFLOW DISCHARGES AND THE SYSTEM SHALL RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 4.THE STREAMBANKS AND WORK AREA MUST BE STABILIZED AT THE END OF EACH DAY BEFORE THE PUMP AROUND SYSTEM IS SHUT DOWN AND BEFORE FLOW IS RETURNED THE CHANNEL. APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. P P WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY FLOW STREAMB A N K INTAKE HOSE STREAM DIVERSION PUMP DEWATERING PUMP DISCHARGE HOSES INTAKE HOSEFLOW DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE SUMP-HOLE FOR POOL (12" TO 18" DEEP, 2-FT DIAMETER) TEMPORARY PUMP AROUND SEQUENCE 1. SET UP PUMP WITH SUCTION AND DISCHARGE HOSE. 2. INSTALL UP-STREAM SANDBAG DAM. 3. INSTALL DOWN-STREAM SANDBAG DAM. 4. THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 5. STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. EARTHERN BERM EARTHERN BERM G: \ S H A R E D D R I V E S \ C A D \ 8 2 B U N C O M B E S W C D \ 8 2 0 4 F R E D E W P & S T R A P \ S A N D Y T U R K E Y \ S H A R O N D U B U C \ D W G \ 8 2 0 4 _ S A N D Y T U R K E Y - D U B U C _ S H T - D E T A I L S . D W G | CH R I S | S A V E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 5 : 3 5 A M | JE _ G R A Y S C A L E . C T B | | P L O T T E D : Tu e s d a y , O c t o b e r 1 7 , 2 0 2 3 1 0 : 0 7 : 2 1 A M NOT TO SCALE SCALE (34"X22"): SCALE (17"X11"): NTS NTS ---------------- ---------------- ---------------- AP P R V DE S C R I P T I O N RE V 7 SAMUEL ASHE DRIVE ASHEVILLE, NC 28805 SHEET NUMBER DATE: DR A W N B Y : CH E C K E D B Y : AP P R O V E D B Y : XX XX CM P PE R M I T D R A W I N G RE - V E G E T A T I O N N O T E S A N D S C H E D U L E S NO T F O R C O N S T R U C T I O N BU N C O M B E C O U N T Y E W P SA N D Y M U S H C R E E K - DU B U C BU N C O M B E C O U N T Y , NO R T H C A R O L I N A 10/17/2023 6.1 SEEDING SCHEDULES ZONE 1: STREAMBANKS ZONE 2: BUFFER RE-ESTABLISHMENT 1. FINAL VEGETATION SPECIES SELECTION MAY CHANGE DUE TO REFINEMENT OR SPECIES AVAILABILITY AT THE TIME OF PLANTING. SPECIES SUBSTITUTIONS WILL BE COORDINATED BETWEEN THE BANK MANAGER, ENGINEER AND PLANTING CONTRACTOR PRIOR TO THE PROCUREMENT OF PLANT/SEED STOCK. 2. LARGER NATIVE TREE SPECIES TO BE PRESERVED WILL BE FLAGGED BY THE ENGINEER PRIOR TO CONSTRUCTION ACTIVITIES. ANY TREES HARVESTED FOR WOODY MATERIAL WILL BE UTILIZED TO PROVIDE BED AND BANK STABILIZATION AND COVER OR NESTING HABITAT ON THE FLOODPLAIN. ANY EXCESS WOODY MATERIALS MAY USED TO BACKFILL OLD CHANNELS. 3. ALL DISTURBED AREAS WILL BE STABILIZED USING TEMPRORY AND PERMERMANET SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED E&SC PLANS. 4. SUPPLEMENTAL PLANTING ACTIVITIES MAY BE REQUIRED WITHIN THE CONSERVATION EASEMENT. TEMPORARY SEEDING AND MULCHING NOTES 5. TEMPORARY SEEDING AND MULCHING SHALL BE APPLIED TO ALL AREAS AND ACCESS ROUTES DISTURBED DURING CONSTRUCTION. 6. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 7. ALL DISTURBED AREAS WILL BE SEEDED WITH TEMPORARY SEED AND MULCHED WITH WHEAT STRAW. SEEDING WILL BE PERFORMED USING A BROADCAST SPREADER. OTHER METHODS MAY BE USED BUT MUST BE APPROVED BY ENGINEER IN ADVANCE OF INSTALLATION. 8. MAINTENANCE OF SEEDED AREAS SHALL CONSIST OF WATERING, WEED AND PEST CONTROL, FERTILIZATION, EROSION REPAIR, RESEEDING, AND INCIDENTAL OPERATIONS AS NECESSARY TO ESTABLISH A HEALTHY, VIGOROUS, WEED FREE AND DISEASE FEE UNIFORM STAND OF GRASS. ALL AREAS WHICH FAIL TO SHOW A UNIFORM STAND OF GRASS FOR ANY REASON SHALL BE TREATED REPEATEDLY UNTIL A UNIFORM STAND OF AT LEAST 90% COVERAGE IS ATTAINED WITH NO BARE AREA GREATER THAN FIVE (5) SQUARE FEET. PERMANENT SEEDING NOTES 9. PERMANENT SEEDING SHALL OCCUR IN CONJUNCTION WITH TEMPORARY SEEDING WHERE APPLICABLE. IDEALLY, PERMANENT SEEDING SHALL OCCUR DURING THE PLANTING SEASON FOR EACH SEED TYPE. AREAS FERTILIZED FOR TEMPORARY SEEDING SHALL BE SUFFICIENTLY FERTILIZED FOR PERMANENT SEEDING; ADDITIONAL FERTILIZER IS NOT REQUIRED FOR PERMANENT SEEDING. 10. ALL SEED AND SEED VARIETIES MUST BE FREE OF STATE AND FEDERALLY LISTED NOXIOUS WEED SEED AND INVASIVE SPECIES. 11. THE CONTRACTOR SHALL LOOSEN THE SOIL TO A MINIMUM DEPTH OF 4-INCHES AND GRADE TO A SMOOTH, EVEN SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. THE AREAS TO BE SEEDED ARE THEN TO BE ROLLED AND RAKED TO REMOVE RIDGES AND FILL DEPRESSIONS TO MEET FINISH GRADES. THE CONTRACTOR IS TO LIMIT SUB GRADE AND FINISH GRADE PREPARATION TO AREAS THAT WILL BE PLANTED IMMEDIATELY. PREPARED AREAS ARE TO BE RESTORED IF ERODED OR OTHERWISE DISTURBED AFTER FINE GRADING AND BEFORE PLANTING. 12. SEED SHALL BE SOWN WITH A SPREADER OR A SEEDING MACHINE. SEED IS NOT TO BE BROADCAST OR DROPPED WHEN WIND VELOCITY EXCEEDS 5 MPH. SEED SHALL BE EVENLY DISTRIBUTED BY SOWING IN TWO DIRECTIONS AT RIGHT ANGLES TO EACH OTHER. WET SEED OR SEED THAT IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR STORAGE IS NOT TO BE USED. AFTER BEGIN SOWN, THE SEED SHALL BE RAKED INTO THE TOP 1/4 INCH OF THE TOPSOIL, LIGHTLY ROLLED, AND WATERED WITH FINE SPRAY. SEEDED AREAS ON STREAM BANKS SHALL BE PROTECTED WITH COIR FIBER MATTING. ZONE 1: STREAMBANK 13. LIVESTAKES AND HERBACEOUS PLUGS LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 4,840 STEMS PER ACRE (3.0' O.C.) FROM TOE OF THE RESTORED CHANNEL TO 3.0' OUTSIDE THE BANKFULL STAGE. HERBACEOUS PLUGS SHALL BE PLANTED ALONG THE TOE OF THE CHANNEL IN THE OUTSIDE OF THE POOL MEANDER BENDS. ZONE 2: RIPARIAN BUFFER 14. WOODY SPECIES LISTED IN THE PLANTING SCHEDULE SHALL BE PLANTED IN OFFSET ROWS AT A DENSITY OF 440 STEMS PER ACRE (10.0' O.C.) FROM 3.0' OUTSIDE THE BANKFULL STAGE TO THE GRADING LIMITS. EXACT PLACEMENT OF THE SPECIES SHALL BE DETERMINED BY THE CONTRACTOR’S VEGETATION SPECIALIST PRIOR TO SITE PLANTING AND BASED ON THE WETNESS CONDITIONS OF PLANTING LOCATIONS. SOIL SPREADING 15. AREAS OF SOIL SPREADING SHALL BE STABILIZED USING TEMPORARY SEEDING AS DEFINED IN THE SEEDING SCHEDULE AND THE APPROVED EROSION AND SEDIMENTATION CONTROL PLANS. GENERAL RE-VEGETATION AND PLANTING NOTES