Loading...
HomeMy WebLinkAbout20231420 Ver 1_ePCN Application_20231016i DWR Division of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Pre -Filing Meeting Date Request was submitted on: 9/13/2023 Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20231420 1 Is a payment required for this project?* No payment required What amount is owed?* Fee received $240.00 $570.00 Fee needed - send electronic notification $323.00 $767.00 Reviewing Office* Select Project Reviewer* Raleigh Regional Office - (919) 791-4200 Zachary Thomas:zachary.thomas Information for Initial Review la. Name of project: Yardly Buffaloe Village 1a. Who is the Primary Contact?* Kevin C Martin 1b. Primary Contact Email: * kmartin@sandec.com Date Submitted 10/16/2023 Nearest Body of Water Nauss River Basin Neuse Water Classification C-NSW Site Coordinates ................................. Latitude: Longitude: 35.840324-78.513905 A. Processing Information Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Wake 1c. Primary Contact Phone: * (919)270-7941 O Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 29 - Residential Developments NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Joyce S Miles,Teresa Vogt Hunt, & Stephen Vogt 2b. Deed book and page no.: 2c. Contact Person: Joyce Miles 2d. Address Street Address P.O. Box 513 Address Line 2 city Knightdale Postal / Zip Code 27545 2e. Telephone Number: (919)749-2530 2g. Email Address:* joycemiles202O@gmaii.com 3. Applicant Information (if different from owner) 3a. Name: TM BTR of Carolinas LLC, Attn. Megan Ledbetter 3b. Business Name: 3c. Address Street Address 11405 N Community House Road, Suite 150 Address Line 2 city Charlotte Postal / Zip Code 28277 3d. Telephone Number: (704)251-8142 3f. Email Address:* MLedbetter@taylormorrison.com 4. Agent/Consultant (if applicable) 4a. Name: Kevin C Martin 4b. Business Name: S&EC, PA 4c.Address Street Address 8412 Falls of Neuse Rd., Ste. 104 Address Line 2 City Raleigh Postal / Zip Code 27615 4d. Telephone Number: (919)270-7941 4f. Email Address:* kmartin@sandec.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality / town: Raleigh 2. Project Identification State / Province / Region NC Country USA 2f. Fax Number: State / Province / Region NC Country USA 3e. Fax Number: State / Province / Region NC Country USA 4e. Fax Number: O 2a. Property Identification Number: 1746410189&1746308877 2c. Project Address Street Address 5221 & 5225 Forestville Rd. Address Line 2 city Raleigh Postal / Zip Code 27603 3. Surface Waters 3a. Name of the nearest body of water to proposed project:" Neuse River 3b. Water Resources Classification of nearest receiving water:' C-NSW 3c. What river basin(s) is your project located in? Neuse 3d. Please provide the 12-digit HUC in which the project is located. 030202010704 4. Project Description and History 2b. Property size: 37.1 State / Province / Region NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The site is mostly wooded however there are 2 single family residences and small agricultural fields within the project area. Surrounding area is either undeveloped or residential. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.1395 4g. List the total estimated linear feet of all existing streams on the property: 596 4h. Explain the purpose of the proposed project: * To allow for development of the site for a public roadway along with private roadways internal to the site. 6 commercial lots, 222 residential units, and associated improvements are proposed. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: Grading equipment typically utilized for residential construction in the piedmont of Nc will be utilized. Indirect impacts are not anticipated. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: Northern portion has a confirmed Jd, southern portion JD was submitted in July 2023 and has not been confirmed yet 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2021-02043 (northern) & SAW-2023-01446 (southern) 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Kevin C Martin Agency/Consultant Company: S&EC, PA Other: O Unknown 5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR Northern Portion: Corps 11/1/2021 DWR 9/16/2019 Southern Portion: DWR 6/2/2022 6. Future Project Plans 6a. Is this a phased project?" Yes O No 6b. If yes, explain. The initial subdivision plan that will be permitted and have the impacts will include public roadway along with private roadways internal to the site. Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? buildout will include 6 commercial lots, 222 residential units, and associated improvements. The phased buildout is not anticipated to have any environmental impacts beyond what is included with the current Subdivision Plan. D. Proposed Impacts Inventory O 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries p Buffers Open Waters Pond Construction 2. Wetland Impacts Reason (?) Lot fill 2b. Impact type* (') P 2c. Type of W." Headwater Forest 2d. W. name W1, LW12&3 2e. Forested" Yes 2f. Type of Jurisdicition * (?) Both 2g. Impact area 0.074 (acres) lot fill P Headwater Forest W2 Yes Both 1�=]_ 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.114 2g. Total Wetland Impact 0.114 21. Comments: Impact W2 is assumed to be jurisdictional since our JD has not been verified by the Corps. Based on previous conversations with Lyle Phillips of the Corps he may decide that this wetland is not jurisdictional because it is immediately upstream of an offsite SCM, if he does them impacts would fall below 0.1 acres and wetland mitigation would not be required for the project. This conversation took place prior to the May 2023 Supreme Court decision on wetlands so it is even more likely now that the wetland is not jurisdictional. 6. Buffer Impacts (for DWR) 6a. Project is in which protect basin(s)? Check all that apply. Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b. Impact Type _716c. Per or Temp 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact 6g. Zone 2 impact Road Crossing P S1b No 330 2,245 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 Zone 1 Zone 2 Total Permanent impacts: 330.00 2,245.00 Zone 1 Zone 2 Total combined buffer impacts: 330.00 2,245.00 6i. Comments: E. Impact Justification and Mitigation 8 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Retaining walls have been utilized to avoid stream impacts and to minimize wetland and buffer impacts. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Silt fence, tree protection fencing, sediment basins, inlet protection, concrete washouts, construction entrances will be employed during project construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): D W R Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Falling Creek Umbrella Mitigation Bank 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.23ac 3c. Comments As mentioned above, mitigation may not be required for the project if during the processing of the application, the Corps determines that wetland #2 is not jurisdictional. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance (lower SHWT) Wetland Swale (higher SHWT) Other SCM that removes minimum 30 % nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government Stormwater program you are using. City of Raleigh Comments: G. Supplementary Information a 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? * Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? * Yes No 3b. If you answered "no," provide a short narrative description. We have reviewed the "Draft Internal Policy, Cumulative impacts and the 401 Water Quality Certification and Isolated Wetlands Programs' document prepared by the NC Division of Water Quality on April 10, 2004, version 2.1. The draft states that many private developments are unlikely to cause cumulative impacts, including projects such as urban in -fill, most residential subdivisions and small commercial developments as well as agricultural and silvicultural operations. The Yardly Buffaloe Village project is a residential development. Additionally, the project is located within the City of Raleigh jurisdiction, therefore the adjacent properties that have potential for development will have the following regulations to protect downstream waters: the Neuse River Basin Riparian Buffer Protection regulations, these regulations require limited development within the riparian buffer area, in addition Best Management Practices may be required that control nitrogen if diffuse flow cannot be achieved; the Water Supply, Watershed Protection Program which limits development densities as well as requires protective riparian buffers; We anticipate that the DWR will advise us if any additional information is needed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. All sanitary sewer discharge will be sent to City of Raleigh treatment plant. A sewer analysis was prepared for the project and submitted to City of Raleigh to confirm capacity. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? S&EC, PA reviewed the referenced project using the USFWS North Carolina Field Office's online project review process and have followed all guidance and instructions in completing the review. We completed our review September 27, 2023 and submitted our project review package on 10/6/23 in accordance with the instructions for further review (see attached S&EC T&E report) 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? * The NOAA Habitat Conservation/Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. No Essential Fish Habitat was identified near the project. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? * The NC State Historic Preservation Office HPOWEB GIS Service interactive map was referenced on September 15th, 2023, no historic listings or study list entries or determined eligible listings were identified within the property boundaries. See attached project report 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Yes No 8c. What source(s) did you use to make the floodplain determination? Wake County GIS and FEMA FIRM panel Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document DWR prefiling notice reciept conf.pdf 606.68KB DWR prefiling request Yardley Bufaloe.pdf 656.72KB SHPO project _report _foresville_buffalo _48168_48168.pdf 1.08MB Yardly Buffalos Village_Environmental Impacts_Full Buildout.pdf 1.49MB S&EC Yardly Buffaloe T&E Report Signed.pdf 5.34MB 5221 5225 Forestville Rd. JD Request.pdf 10.83MB signed 5225 Forestville rd Agent Authorization_1746410189.pdf 259.02KB signed 5221 forestville rd Agent Authorization_1746308877.pdf 257.85KB Wetland survey KV94.800_Miles Property_Wetlands_signed 6-15-23.pdf 1.84MB DWR buffer Letter 5221 & 5225 Forestville Rd.pdf 2.85MB Corps email confirmation of delineation.pdf 50.43KB AJD Map_Updated.pdf 7.9MB Buffaloe_Forestville SE DWR Ietter.pdf 19.31MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the INC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Kevin C Martin Signature &- �Wwor Date 10/16/2023 O