HomeMy WebLinkAboutNCC233161_ESC Approval Submitted_20231023 Iredell County Planning & Development
Erosion Control Section
IR.EDELL 349 North pCpenter Street
COUNTY NC P.O• Box 788
Statesville, NC 28687
Date: July 20th, 2023
LETTER OF APPROVAL
Gerome Blackmon
Blackmon Custom Builders, Inc.
626 Beaty Street
Davidson,NC 28036
RE: Project Name: Judas Rd-Yorkwood Project
Acres Approved: 1.7
Project ID: IREDE-2024-007
Project Location: Pin 4649126271.000
Submitted By: Blackmon Custom Builders,Inc.
Date Received: July 11th, 2023
Plan Type: New
Dear Mr. Blackmon
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this letter of Approval. The Certificate of
Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval as is required by Title 15A NCAC 4B.0129 and Appendix
H of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development
Code requires that a copy of the approved erosion control plan be on file at the job site.
Any amendments and/or revisions to the approved plan must be reviewed and approved
prior to implementation in order for the site to remain in compliance. Failure to submit
plans for approval may result in administrative actions and/or penalties as indicated in the
Iredell County Land Development Code. Also, this letter gives notice as required by G.S.
113A-61.1(a)and Appendix H of the Iredell County Land Development Code, of our
right of periodic inspection to insure compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If,following
the commencement of this project,it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Iredell County Land
Development Code and the Sedimentation Pollution Control Act of 1973, (North
Carolina General Statute 113A-51 through 66),this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act and Code.
Letter of Approval
Judas Rd-Yorkwood Project
7/20/2023
Page 2 of 2
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations,and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does
not supersede any other permit or approval. It is the responsibility of the applicant to
obtain all other required permits or approvals.
As of March 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent(NOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction Stormwater General Permit. This form MUST be
submitted prior to the commencement of any land disturbing activity on the above named
project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions
about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will
be emailed to you within three business days. As of May 1,2019, a$100 fee will be
charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form,which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In
addition, it is required that this office to be notified of the proposed starting date for this
project. Failure to notify this office of the starting date may result in a Notice of
Violation and civil penalty. As required in the approved plan construction sequencing,
please schedule a preconstruction conference with our staff prior to land disturbing
activity.
Your cooperation is appreciated.
Sincerely,
Blake Jordan
Erosion Control Inspector I
Enclosures: Fact Sheet on the New NCG01 Permit
Permit