Loading...
HomeMy WebLinkAboutNC0060534_PCI NOV2023PC0516 RESP_20231020The City of Z North Carolina October 20, 2023 Mr. Dan Boss Assistant Regional Supervisor Water Quality Regional Operation Section Asheville Regional Office Division of Water Resources, NCDEQ Subject: NOV-2023-PC-0516 Response Dear Mr. Boss, In response to the attached NOV, I offer the following. The POTW is currently working to correct the recent finding of violations in the inspection report that follow: 1) As stated an IWS was performed in 2022, the necessary forms will be completed and submitted as soon as possible. 2) Samples will be collected quarterly as specified in the STMP. A spreadsheet will be created and maintained to reference data. In addition the POTW will be seeking guidance from the Pretreatment Division to modify the STMP to more closely represent the Pollutants of Concern. 3) The POTW will begin sampling the IU on a quarterly basis as specified in the IUP. 4) An updated Headworks Analysis will be completed and submitted as soon as possible. 5in,�,erely, 7 m Williams Industrial Pretreatment Coordinator City of Brevard Phone: 828.883.8461