HomeMy WebLinkAboutSW6230704_Supplement-EZ Form_20231020 SUPPLEMENT-EZ COVER PAGE
JRMS WADED
PROJECT INFORMATION _
1 Project Name Riverfall Phase 2
2 Project Area(ac) 42.26
3 Coastal Wetland Area(ac)
4 Surface Water Area(ac)
5 Is this project High or Low Density? Low
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A _
10 Is streambank stabilization proposed on this project? Yes
NUMBER AND TYPE OF SCMs:
11 Infiltration System 0
12 Bioretention Cell 0
13 Wet Pond 0
14 Stormwater Wetland 0
15 Permeable Pavement 0
16 Sand Filter 0
17 Rainwater Harvesting(RWH) 0
18 Green Roof 0
19 Level Spreader-Filter Strip(LS-FS) 0 _
20 Disconnected Impervious Surface(DIS) 0
21 Treatment Swale 0
22 Dry Pond 0
23 StormFilter 0
24 Silva Cell 0
25 Bayfilter 0
26 Filterra 0
FORMS LOADED
DESIGNER CERTIFICATION
_27 Name and Title: _ Jeffrey A.Nobles. PE
28 Organization: Larry King&Assoc., RLS,PA
29 Street address: 1333 Morganton Road,Suite 201
30 City,State,Zip: Fayetteville,NC 28305
31 Phone number(s). _ 910-483-4300
32 Email: jnobles@Ikanda.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
Signature of Designer
Seal Date
DRAINAGE AREAS
1 Is this a high density project? I No
2 If so,number of drainage areas/SCMs 0
3 Does this project have low density areas? Yes
4 If so,number of low density drainage areas 1
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
!,DRAINAGE AREA INFORMATION Entire Site LD 1
, 4 1 ype of SCM
5 Total drainage area(sq 1680109 1680109
6 Onsite drainage area(sq ft) 1680109 1680109
7 Offsite drainage area(sq ft)
8 Total BUA in project(sq ft) 211065 sf 211065 sf
New BUA on subdivided lots(subject to permitting)
9 (sq ft) 165000 sf 165000 sf
New BUA not on subdivided lots(subject to
_10 permitting)(sf)
11 Offsite BUA(sq ft)
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft)
-Sidewalk(sq ft) _
-Roof(sq ft)
-Roadway(sq ft) 46065 sf 46065 sf _
-Future(sq ft)
-Other,please specify in the comment box
below(sq ft) sf sf
New infiltrating permeable pavement on
13 subdivided lots(sq ft) sf sf
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) sf sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) sf sf
16 Existing BUA that is already permitted(sq ft) sf sf
17 Existing BUA that will be removed(sq ft) sf sf
18 Percent BUA 13% 13%
19 Design storm(inches) .0 in .0 In
20 Design volume of SCM(cu ft) cf cf __
21 Calculation method for design volume cf 0
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
LOW DENSITY
DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003
1 Is project below density thresholds set forth in the applicable stormwater rule? _ Yes
2 Does project maximize dispersed flow and minimize channelization of flow?? Yes
3 Has the use of piping been minimized per.1003(2)(c)? Yes
4 Side slopes of the vegetated conveyances(H:V) 3 sf
5 Maximum velocity in the vegetated conveyances during the 10-year storm? 5
6 Are curb outlet swales proposed? No
7 Maximum longitudinal slope of curb outlet swale(s)(%) _
B Bottom width of curb outlet swale(s)(feet)
9 Maximum side slope of curb outlet swale(s)(H:V)
10 Minimum length of curb outlet swale(s)(feet)
11 Are treatment swales used instead of curb outlet swales? No
12 Is stormwater released at the edge of the setback as dispersed flow? Yes
13 Have stormwater outlets been designed to prevent downslope erosion? Yes
14 Are variations to rule.1003 proposed? No
ADDITIONAL INFORMATION
15J Please use this space to provide any additional information about this low density project:
Drainage Pervious
Swale Area BUA area C Q Slope Vair,w I/m.6 Flow depth
* (act (ac) (act Ws) (V (fps) Ifps) (ft)
1 4.02 2.16 1.86 066 } 1200. 5.86 6.00 3.21 0.44
-
2 1.24 0.62 0.63 0.68 5.40 1.16 6.00 2.64 0.72
3 0.73 0.29 0.44 0.54 3.0D 2.00 6.00 2.41 0.24
4 1.02 0,66 0.35 0.63 5.10 1.00 6.00 2.85 0.33
5 0.35 0.30 0.05 0.81 2.20 2.00 6.00 2.18 0.20
6 1.33 0.65 0.68 0.59 6.00 2.00 6.00 3.32 0.67
7
8 2.77 1.54 1.23 0.78 12.50 3.07 6.00 4.88 0.82
6 2.69 1.48 1.23 0.71 12.20 2.00 6.00 3.96 0.88
10 1.59 0,81 0.78 0.84 7.00 1.00 6.00 2.66 0.81
11 1.45 0.72 0.72 0.88 6.50 2.00 6.00 3.39 0.69
12 0.15 0.09 0.07 0.84 0.70 2.00 6.00 1.46 0.10
13 0.80 0.31 0.49 0.90 7.90 3.25 6.00 3.21 0.51
14 0.79 0.30 0.49 0.68 3.20 2.68 6.00 3.17 0.50
15 0.87 0.23 0.44 0.62 2.40 3.77 6.00 3.35 0.42
16 0.64 0.21 0.43 0.64 2.20 4.34 6.00 3.45 0.40
17 0.07 0.01 0.06 0.37 0.20 0.60 6.00 0.90 0.24
18 0.52 0.18 0.34 0.50 2.10 4.46 6.00 3.45 0.39
19 0.38 0.13 0.25 0.52 1.40 3.77 6.00 2.93 0.35
20 0.13 0.04 0.09 0.47 0.50 2.00 6.00 1.78 0.27
21 0.57 0.30 0.28 0.61 2.70 2.00 6.00 2.72 0.50
22 1.12 0.88 0.44 0.89 4.80 2.50 6.00 3.11 0.65
2) 0.93 0.50 0.43 0.63 3.90 3.77 6.00 3.78 0.05
24 0.72 0.38 0.34 0.63 3.00 2.00 6.00 2.78 0.52
25 0.11 0.07 0.04 0.90 0.30 2.00 6.00 1.57 0.22
26
27
28
29
30