Loading...
HomeMy WebLinkAboutNCC216470_NOT Closeout Documents_20231018 OF Rq� 5401 North �y PROJECT 6112 Balance Ct o�T-CAROy� PERMIT 4 LDG 054473-2021 CERTIFICATE OF COMPLETION PLAN 4 Mass 0103-2021 City of Raleigh Stormwater Management Division (919) 996-3940 Stephen Leischner DATE 10/18/23 THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: ® Final Inspection is Approved The project has been inspected by a City stormwater inspector. Under the referenced permit(s),the site is found to be in compliance with the approved plans and City Code. All required stormwater certifications, surveys and approvals have been received and approved. All temporary measures have been removed and permanent ground cover sufficient to restrain erosion has been established. ® City Permit(s) Closed The referenced permit(s)have been closed. ® Coverage Under NCGO10000 Proceed to deq.nc.gov/NCGO1 to submit a Notice of Termination (NOT)request to terminate NCGO1 permit coverage. Please note that this Certificate must be uploaded as part of completing the NOT process. Once the NOT is approved, continued self-monitoring of the project for NCGO1 compliance will no longer be required. ® All Below Ground Stormwater Conveyance is Unobstructed Photographs and other assurances that all pipe systems, inlets, and junction boxes have been cleared of sediment and any other construction related debris. ® All Applicable Temporary Erosion Control Measures Removed Insure appropriate removal of all temporary measures inclusive of inlet protection, silt fence, silt fence outlets, etc. Extenuating circumstances could be detailed in comments below. Stormwater Inspections Form 504 V3.312022 Page 1 of I