HomeMy WebLinkAboutNC0021601_PCI_20231010
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED
October 10, 2023
Jim Fatland
Town of Tryon
Email: manager@tryonnc.gov
SUBJECT: Pretreatment Compliance Inspection Report
Tryon WWTP
NPDES WW Permit No. NC0021601
Polk County
Dear Permittee:
The North Carolina Division of Water Resources conducted a Pretreatment Compliance Inspection (PCI)
of the Tryon WWTP on 9/20/2023. The PCI was conducted to verify that the program is being managed and
maintained in compliance with all Pretreatment regulations. The findings and comments noted during this
inspection are provided in the enclosed copy of the inspection report entitled "Pretreatment Compliance
Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Melanie Kemp with the Water
Quality Regional Operations Section in the Asheville Regional Office at 828-296-4500 or via email at
melanie.kemp@deq.nc.gov.
Sincerely,
Melanie Kemp, Environmental Specialist
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Pretreatment Compliance Inspection Report
Ec: LF
Deborah Bradley (ORC)
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0021601 23/09/20 P S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
3 N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Tryon WWTP
1526 E Howard St
Tryon NC 28782
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
11:00AM 23/09/20 20/08/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Deborah M Bradley/ORC/828-859-5626/
Other Facility Data
12:00PM 23/09/20 24/12/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Deborah Bradley, /ORC/828-894-2048/Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Pretreatment Other
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Melanie Kemp DWR/ARO WQ/ - - /
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
NPDES yr/mo/day
23/09/20
Inspection Type
P3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Melanie Kemp, with the Asheville Regional Office, conducted a Pretreatment Compliance Inspection
(PCI) of the Tryon’s Pretreatment Program on September 20, 2023. Deborah Bradley (Pretreatment
Coordinator/WWTP ORC) was present during the inspection.
Overall, the program appears to be in compliance with Federal and State Pretreatment requirements.
The Town of Tryon’s Pretreatment Program has one Significant Industrial User (SIU): Tryon Finishing
Corp. Paperwork was readily accessible and organized.
During the file review, it was noted that there have been two copper exceedances within the last six
months. The SIU is pumping out their treatment basin and conducting an engineering analysis to
better understand the source of the copper. The ORC has not noticed that the copper violations
have impacted the WWTP. Two NOVs have been issued by the POTW but the industry is not in
significant non-compliance.
NC0021601 17 (Cont.)
Page#2
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)]
1. Control Authority (POTW) Name: Town of Tryon WWTP
2. Control Authority Representative(s): Deborah Bradley
3. Title(s): Pretreatment Coordinator/ORC
4. Last Inspection Date: 03/22/2022 Inspection Type (Check One): PCI Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? YES NO
6. Is POTW under an Order That Includes Pretreatment Conditions? YES NO
Order Type, Number, Parameters: _______________________________ Are Milestone Dates Being Met? YES NO
ICIS CODING
Main Program Permit Number MM/DD/YY
| N | C | 0 | 0 | 2 | 1 | 6 | 0 | 1 | | 09 | 20 | 23 |
7. Current Number Of Significant Industrial Users (SIUs)? 1
8. Number of SIUs With No IUP, or With an Expired IUP? 0
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0
10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0
11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi-Annual
Periods?
0
12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi-Annual Periods? 0
13. Number of SIUs in SNC with Pretreatment Schedule? 0
14. Number of SIUs on Schedules? 0
15. Current Number Of Categorical Industrial Users (CIUs)? 0
16. Number of CIUs in SNC? 0
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being Addressed?
YES NO
18. Since the Last PCI, has the POTW had any Problems Related to an Industrial
Discharge (Interference, Pass-Through, Blockage, Citizens’ Complaints, Increased
Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
YES NO
19. Which Industries have been in SNC for Limits or Reporting during
either of the Last 2 Semi-Annual Periods? Not Been Published for
Public Notice?(May refer to PAR if Excessive SIUs in SNC)
SNC for Limits: 0
SNC for Reporting: 0
Not Published: 0
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an
Order, Has a Signed Copy of the Order been sent to the Division?
N/A
21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which
Ones?
YES NO
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? YES NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? YES NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? YES NO Is Table Adequate? YES NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? YES NO Inspector, please verify yourself!
26. If NO to 23 - 26, list violations _______________________________________________________________________________
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? YES NO
If yes, which ones? Eliminated: Added:_______________________
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2
28. PRETREATMENT PROGRAM ELEMENTS REVIEW- Please review POTW files, verify POTW has copy of Program Element
in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info:
Program Element Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headworks Analysis (HWA) 09/11/2023 Yes No not approved yet Yes No
Industrial Waste Survey (IWS) 06/13/2023 Yes No not approved yet Yes No
Sewer Use Ordinance (SUO) 01/22/2013 Yes No 04/02/2013 Yes No
Enforcement Response Plan (ERP) 06/01/2020 Yes No 09/02/2020 Yes No
Long Term Monitoring Plan (LTMP) 12/05/2017 Yes No 01/29/2018 Yes No
________________________________________________________________________________________________________________
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION)
29. User Name 1. Tryon Finishing Corp. 2. 3.
30. IUP Number 001
31. Does File Contain Current Permit? Yes No Yes No Yes No
32. Permit Expiration Date 12/31/2027
33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A N/A
34. Does File Contain Permit Application Completed Within One Year Prior
to Permit Issue Date?
Yes No Yes No Yes No
35. Does File Contain an Inspection Completed Within Last Calendar Year? Yes No Yes No Yes No
36. a. Does the File Contain a Slug/Spill Control Plan?
b. If No, is One Needed? (See Inspection Form from POTW)
a. Yes No
b. Yes No
a. Yes No
b. Yes No
a. Yes No
b. Yes No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
Organic Management Plan (TOMP)?
Yes No N/A Yes No N/A Yes No N/A
38. a. Does File Contain Original Permit Review Letter from the Division?
b. All Issues Resolved?
a. Yes No
b.Yes No N/A
a. Yes No
b.Yes No N/A
a. Yes No
b.Yes No N/A
39. During the Most Recent Semi-Annual Period, Did the POTW Complete
its Sampling as Required by IUP, including flow?
Yes No Yes No Yes No
40. Does File Contain POTW Sampling Chain-Of-Custody Forms? Yes No Yes No Yes No
41. During the Most Recent Semi-Annual Period, Did the SIU Complete its
Sampling as Required by IUP, including flow?
Yes No N/A Yes No N/A Yes No N/A
41b. During the Most Recent Semi-Annual Period, Did SIU submit all reports
on time?
Yes No N/A Yes No N/A Yes No N/A
42a. For categorical IUs with Combined Wastestream Formula (CWF), does
file include process/dilution flows as Required by IUP?
Yes No N/A Yes No N/A Yes No N/A
42b. For categorical IUs with Production based limits, does file include
production rates and/or flows as Required by IUP?
Yes No N/A Yes No N/A Yes No N/A
43a. During the Most Recent Semi-Annual Period, Did the POTW Identify
All Limits Non-Compliance from Both POTW and SIU Sampling?
Yes No Yes No Yes No
43b. During the Most Recent Semi-Annual Period, Did the POTW Identify
All Reporting Non-Compliance from SIU Sampling?
Yes No N/A Yes No N/A Yes No N/A
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days?
c. If applicable, Did POTW resample within 30 days of becoming aware
of SIU limit violations in the POTW’s sampling of the SIU?
a.Yes No N/A
b.Yes No N/A
c.Yes No N/A
a.Yes No N/A
b.Yes No N/A
c.Yes No N/A
a.Yes No N/A
b.Yes No N/A
c.Yes No N/A
46. During the Most Recent Semi-Annual Period, Was the SIU in SNC? Yes No Yes No Yes No
47. During the Most Recent Semi-Annual Period, Was Enforcement Taken
as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)?
Yes No N/A Yes No N/A Yes No N/A
48. Does the File Contain Penalty Assessment Notices? Yes No N/A Yes No N/A Yes No N/A
49. Does The File Contain Proof Of Penalty Collection? Yes No N/A Yes No N/A Yes No N/A
50. a. Does the File Contain Any Current Enforcement Orders?
b. Is SIU in Compliance with Order?
a.Yes No N/A
b.Yes No N/A
a.Yes No N/A
b.Yes No N/A
a.Yes No N/A
b.Yes No N/A
51. Did the POTW Representative Have Difficulty in Obtaining Any of This
Requested Information For You?
Yes No Yes No Yes No
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3
FILE REVIEW COMMENTS:
CoCs were missing from the SIU reports. SIU sampling results from April and July 2023 showed copper limits violations. The
POTW issued two NOV’s but the SIU isn’t in SNC yet. The SIU is pumping out their pretreatment basin and conducting an
engineering analysis to address this issue.
INDUSTRY INSPECTION ICIS CODING:
Main Program Permit Number MM/DD/YY
| | | | | | | | | | | | | |
1. Industry Inspected:________________________________________________________________________________________
2. Industry Address:__________________________________________________________________________________________
3. Type of Industry/Product:___________________________________________________________________________________
4. Industry Contact:________________________________________Title:_____________________________________________
Phone:__________________________________________Fax:_____________________________________________
5. Does the POTW Use the Division Model Inspection Form or Equivalent? YES NO
6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly?
Comments:
A. Initial Interview YES NO
B. Plant Tour YES NO
C. Pretreatment Tour YES NO
D. Sampling Review YES NO
E. Exit Interview YES NO
Industrial Inspection Comments:
OVERALL SUMMARY AND COMMENTS:
Comments: ______________________________________________________________________________________________
__________________________________________________________________________________________________________
Requirements: ______________________________________________________________________________________________
__________________________________________________________________________________________________________
Recommendations: ___Request that the SIU include CoC’s with sampling results. _______________________________________
__________________________________________________________________________________________________________
NOD: YES NO
NOV: YES NO
QNCR: YES NO
POTW Rating:
Satisfactory X Marginal UnSatisfactory
PCI COMPLETED BY: Melanie Kemp DATE: ___10/06/2023__________________________