Loading...
HomeMy WebLinkAboutNC0027103_Authorization to Construct_20231019 (2)DocuSign Envelope ID: B461C549-CB61-47E4-B016-1EEB0459C333 ROY COOPER Giovernor ELIZABETH S, BISER 5-rd-y RICE ARD E- ROCERS, JR- V7 rprror NORTH CAROLINA free MFUMrRMI QUI31fty October 19, 2023 Mr. Tyler Thomas Town Manager Town of Pembroke 98 Union Chapel Road Pembroke, North Carolina 28372 SUBJECT: Dear Mr. Thomas: Authorization to Construct ATC No. 027103A04 Town of Pembroke Pembroke WWTP NPDES Permit No. NCO027103 A letter of request for an Authorization to Construct (ATC) was received August 15, 2023, by the Division of Water Resources (Division). With additional information received on October 19, 2023, final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 1.33 MGD Pembroke WWTP, with discharge of treated wastewater into the Lumber River in the Lumber River Basin. This authorization results in an increase in design and permitted capacity to 2 MGD, provided ATC No. 027103A02 and ATC No. 027103A03 were also completed, and is awarded for the construction of the following specific modifications: Construction of a new 675,000 gallons oxidation ditch with Rotary Aerator, two (2) 1,375 square foot tertiary disc filters with four (4) 1,170 GPM submersible pumps, one (1) 500,000 gallons aerobic digester with a one (1) 700 GPM submersible sludge pump, and all necessary piping and controls (if applicable); in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. [NOTE: This 2 MGD expansion (total capacity) of Pembroke WWTP consists of three contracts. The Authorization to Construct permits are being issued, once for each contract. All three final Engineer's Certification shall be submitted to the Division before the 2 MGD facility may be operated.] QE North CamalataDegutantofElw �,na,rnt Q1�y I Dnai mofWdaResomes �� 512North Salisbm7Street 1 16 11 Mul Savice Cade I R;lhi North Cmaluw27699.1611 4NORT�HCNORTHCAROLINA */ 919.7079000 Nweo Uepeltmem m Environmental Qual\ DocuSign Envelope ID: B461C549-CB61-47E4-B016-1EEB0459C333 Mr. Tyler Thomas, Town Manager October 19, 2023 Page 2 of 4 This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO027103 issued effective October 1, 2022, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0027103. It is the Owner's responsibility to ensure that the as -constructed project meets the requirements of all applicable regulations and statutes, the ATC Permit Application package, and all of the requirements contained herein. Failure to comply may result in penalties in accordance with North Carolina General Statute § 143-215.6A through § 143-215.6C. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Fayetteville Regional Office, telephone number 910-433-3300, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a Professional Engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit and the ATC Permit Application package. Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. The Engineer's Certification form is included with this submittal. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. All ORC site inspections must be documented in a log to be on -site and available for review at all times A copy of the project plans and specifications shall be maintained on file by the Permittee for the life of the facility. DocuSign Envelope ID: B461C549-CB61-47E4-B016-1EEB0459C333 Mr. Tyler Thomas, Town Manager October 19, 2023 Page 3 of 4 During the construction of the proposed additions/modifications, the Permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in compliance with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. The issuance of this ATC does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ori Tuvia at telephone number (704) 235-2190 or by email at Ori.Tuvia@deq.nc.gov. Sincerely, EV DocuSigned by: 64 v6w" CE9CD2D3C45B4D4... for Richard E. Rogers, Jr. Director, Division of Water Resources by Douglas Dowden Supervisor, NPDES Industrial Permitting Unit Attachment: Engineering Certification, cc: NPDES Files E-copy: Carl Scharfe, PE The Wooten Company Email: cscharfe@thewootencompany.com DWR Fayetteville Regional Office, Water Quality Programs Karin Britt DWI (karin.britt@deq.nc.gov) Without Engineer's Certificate attached: cc: Robeson County Health DocuSign Envelope ID: B461C549-CB61-47E4-B016-1EEB0459C333 Town of Pembroke Pembroke WWTP Authorization to Construct No. 027103A04 Issued October 19, 2023 NPDES Permit No. NC0027103 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Pembroke Wastewater Treatment Plant, located in Robeson County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Construction of a new 675,000 gallons oxidation ditch with Rotary Aerator, two (2) 1,375 square foot tertiary disc filters with four (4) 1,170 GPM submersible pumps, one (1) 500,000 gallons aerobic digester with a one (1) 700 GPM submersible sludge pump, and all necessary piping and controls (if applicable); in conformity with the project plans, specifications, and other supporting documentation comprising the ATC Permit Application package submitted to the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Date Registration No. Mail this Certification to: Attn: Ori Tuvia NPDES Industrial Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617