HomeMy WebLinkAboutNCC205983_NOT Signed Certification_20231017 NCGO1 Notice of Termination (NOT) Certification Form
Directions:
Print this form, complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral & Land Resources Stormwater Program
512 N.Salisbury Street, 6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22]
General Permit Certificate of Coverage (COC) No.: !\)c.C_
Name of Project: ILkpier b entl 3- Z
Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report,plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
I,as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge
and belief, such information is true,complete, and accurate.
Legally Responsible Organizational Entity: D-(Z . r O t�r0�� l �C -
*Legally Responsible Person: v4.4 CGLY( Oil
Title of Legally Responsible Person: Cam•. �o A.1 S t-or tAs a: CO4''"p `e Vracp
/7/Zo23
*Signature:' Date: /U/
Print Name and Title of Signed (only if authorized individual signing differs from Legally Responsible Person):
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity, such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV,Section B, Item (6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV, Section B, Item (6)of the NCG010000 permit.