HomeMy WebLinkAboutNC0086983_Authorization to Construct_20090504`� _• :'
��� L
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue
Coleen H. Sullins Dee Freeman
Governor
Director Secretary
May 4, 2009
Mr. Steven Yarbrough
Caswell County Schools
P.O. Box 160
Yanceyville, North Carolina 27379
SUBJECT: Authorization to Construct
A to C No. 086983AOI
Caswell County Schools
South Elementary WTP
Dechlorination Facilities
Caswell County
Dear Mr. Yarbrough:
A fast track application for Authorization to Construct dechlorination facilities was
received on April 27, 2009, by the Division of Water Quality (Division). Authorization is hereby
granted for the construction of modifications to the existing South Elementary WTP, with
discharge of washwater effluent into Hyco Creek in the Roanoke River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a dechlorination system utilizing sodium thiosulfate pursuant to the
fast track application received on April 27, 2009, and in conformity with the
Minimum Design Criteria for Dechlorination Facilities.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO086983 issued September 7, 2007, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0086983.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
1617 Mail Service Center, Ralegh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Ralegh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-64921 Customer Service:1-877-623-6748
Internet: www.ncwaterquality.org
An Equal Opportunity l Affirmative Action Employer
Noe CaC011na
�tura!!y
■
Mr. Yarbrough
May 4, 2009
Page 2
The Winston-Salem Regional Office, telephone number (336) 771-5000 shall be notified
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of these permitted facilities, the
attached Engineer's Certification form must be received from a professional engineer certifying
that the permitted facility has been installed in accordance with the NPDES Permit and this
Authorization to Construct. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T 15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when ap lip cable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division in accordance with North
Carolina General Statute 143-215.6A to 143-215.6C.
Mr. Yarbrough
May 4, 2009
Page 3
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please do not hesitate to contact
Seth Robertson, P.E. at telephone number (919) 715-6206.
Sincerely,
,YS��
04 Coleen H. Sullins
swc/sr
cc: Randall Thompson, P.E., Simmons Engineering & Surveying, Inc., 115 Glendale Ave.,
Burlington, NC 27215
Caswell County Health Department
Winston-Salem Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Point Source Branch, NPDES Program
Daniel Blaisdell, P.E.
Steve Coffey, P.E.
ATC File No. 086983A01
Caswell County Schools
A To C No. 086983AOI
Issued May 4, 2009
Engineer's Certification
I, , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the South Elementary WTP, located
on NC Hwy 86 S in Caswell County for Caswell County Schools, hereby state that, to the best of
my abilities, due care and diligence was used in the observation of the following construction:
Installation of a dechlorination system utilizing sodium thiosulfate pursuant to the
fast track application received on April 27, 2009, and in conformity with the
Minimum Design Criteria for Dechlorination Facilities.
I certify that the construction of the above referenced project was observed to be built
within substantial compliance and intent of the approved plans and specifications.
Signature
Date
Registration No.
Send to: Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633