HomeMy WebLinkAboutSW3220803_Add Info_20221110 oE�M5TAT3� ti ROY COOPER 5 = Governor E7 ELIZABETH S.BISER Secretary *Eaf QUAMNVEw x BRIAN WRENN NORTH CAROLINA Director Environmental Quality November 10, 2022 Thomas &Hutton Engineering Co. Attn: Matthew S. Kiker, PE 1020 Euclid Avenue Charlotte, NC 28203 AND KH Wesley Chapel, LLC Attn: Mike McLendon, Authorized Signatory 8913 Silver Springs Court Charlotte, NC 28215 Subject: Request for Additional Information Stormwater Permit No. SW3220803 Cresswind Phase 4 Union County Dear Mr. Kiker and Mr. McLendon: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on August 15, 2022. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please QA/QC the submission. There were a number of issues that prevented a complete review of the project (I reviewed as much as I could based on what was provided, but there may be other comments that come up when the submission is corrected). Some notable examples are provided below: a. Please clarify the BUA accounting for this project. Below is a summary of the drainage area information for the proposed wet pond as shown in the Application (Section IV, 10) and the Supplement-EZ Form (Drainage Areas Page) Item Application Su lement-EZ Form Building/Lots/Roof 715,000 sf 1,001,880 sf Street/Roadway 217,681 sf 284,716 sf Parking 143,000 sf 290,000 sf Sidewalk 62,284 sf 84,156 sf North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAROLINA _ oepm nt of EnvimnmwUl uwl ry 919.707.9200 Future 0 sf 56,295 sf Total BUA 1,137,965 sf 1,840,410 sf %BUA 55% 40% Please revise as needed so it is clear what the proposed BUA for this project is. b. The calculations show 23.0 ac (1,001,880 sf) of BUA draining to the SCM while the Application shows 1,137,965 sf and the Supplement-EZ Form shows 1,840,410 sf. c. The provided cross-section details on plan sheet C3.29 do not appear to correspond to the grading plans (for example, the cross-section shows the permanent pool surface elevation at 567.0' while the other submittal items indicate 574.5', the drawdown orifice is shown on the plans to be 3" and 4" in the other submittal materials, etc...). d. The number of lots associated with this project is shown as 143 in the narrative and Application (Section IV, 10), however the plans show 144 (Lots 371 to 514 are part of this phase). e. The plan view of the wet pond does not show the forebay. 2. Please provide calculations showing that the inlet and outlet protection is adequately sized (General MDC 4). 3. Please exclude the sediment storage zone from the main pool and forebay volume calculations (Wet Pond MDCs 1, 2, 3, & 5). I can't say for sure if this is an issue since the provided cross-section view of the pond has the wrong elevations, but it appears to be the case based on the other provided submittal items. Please revise as needed. 4. As designed, the forebay is too large (Wet Pond MDC 5a). Using the provided forebay and main pool volumes from the stage-storage tables (see earlier comment, these values will need to be revised to exclude the sediment storage zone however this issue still appears to be present when this is taken into account) of 28,375 cf and 134,764 cf respectively results in a forebay that is 21% the size of the main pool (28,375 cf/ 134,764 cf=21% >20%). Please revise as needed. 5. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Line 2—The Project Area value shown (107.1 ac) does not correspond to the project area value shown in Section IV, 7 of the Application. Please revise as needed. b. Drainage Area Page: i. It is strongly recommended to use the latest version of this form (available on our website: https:Hdeg.nc.gov/about/divisions/energy-mineral-and- land-resources/stormwater/stormwater-pro gram/stormwater-desi gn). It contains some modifications from the version of the form that you used, such as providing a line for the total drainage area to the SCM. ii. Revise the values as needed in accordance with the earlier comment. The entire site column should be an accounting of the entire site, not just a sum of the other columns. If any portions of the project area are located outside of the drainage area to the SCM they should be accounted for in this column. iii. Lines 17-19 —Please provide these items for the wet pond column. c. Wet Pond Page: i. Line 9—The provided detail did not appear to indicate a drawdown orifice that could be used to dewater the entire pond. Please revise as needed. ii. Line 26—Per the provided calculations, the surface area of the main pool is 36,947 sf(39,712 sf is shown). iii. Lines 27, 28, & 32—These items will need to be recalculated (to exclude the sediment storage zone). iv. Line 28 —Per the provided calculations, the average depth is 3.97 ft (4.78 ft is shown). Please revise as needed. 6. Please reupload the plan sheets from the last submission for this project individually under the appropriate specific file types ("Plansheet—Cover Sheet", "Plansheet— Grading/Drainage Plan", etc...). Laserfiche does not handle large files (such as an entire plan set) well. NOTE: We do not require a full plan set (either electronic or hard copy) you only need to provide the plan sheets needed for us to complete the review. 7. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 ii. For LISPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group) will be able to receive the submission. Do not leave the package in the foyer with the security guard. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 10, 2022, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW3220803 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or(919) 707-3646. Sincerely, Jim Farkas Environmental Engineer Stormwater Program cc: Mooresville Regional Office