Loading...
HomeMy WebLinkAbout20221406 Ver 1_Project Withdrawn_20231005From: Williams, Kim To: Moose, David E CIV (USA); Snider, Hollev Cc: Mickey Sugg; Tim Long; Fryar, Wesley Subject: [External] Malmo Loop Rd; Action ID# SAW-2022-01061 & DWR Project #20221406 Date: Thursday, October 5, 2023 10:45:37 AM Attachments: Malmo Phase 1A NWP Aua 2022.Ddf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi David and Holley Based on input from the USAGE, Logan Development has revised their site plan for Malmo Loop Rd Tract and will be avoiding impacts to jurisdictional features related to installing the spine road. The only proposed impacts at this time will be those needed to construct Phase lA off Malmo Loop Rd and authorized under the original NWP (less than 0.1 acre of impact; see attached). Therefore, they wish to withdraw the Section 404/401 permit application that was submitted on 8/25/23 and just use the NWP attached. Note that Gary issued a provisional permit for Phase IA in 2022. I assume he thought that a 401 WQC was going to be needed, but since impacts were under 0.1 acre, it wasn't. David- do you need to issue a final NWP? Let me know if you have any questions or concerns. Thanks! Kim Kim Williams I Section Manager Davey Resource Group, Inc. Direct: 910-452-0001 x 1908 1 Cell: 910.471.5035 1 Fax: 910.452.0060 3805 Wrightsville Ave., Suite 15 1 Wilmington, NC 28403 On Thu, Sep 21, 2023 at 6:03 AM Williams, Kim <Kim.Williams&davey.com> wrote: Hi David The project engineers and client are still evaluating all options. We will be in touch shortly, once we have revised the plan. Thanks so much! Kim On Wed, Sep 20, 2023, 2:42 PM Moose, David E CIV (USA) <David.E.Mooseausace.army.mil> wrote: Mickey and I would be available either 3:30 tomorrow or 3:00 on Monday if you would like to have the follow up at one of those times. Thanks David Moose Regulatory Specialist US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4810 David. e. moosenusace. army. mil E-PCN-Submittal https://edocs.deq.nc.gov/Forms/Pre-Construction Notification_Form PJDs, Wetland Delineation Concurrence & JD's. hU://saw-reg.usace.army.mil/J D/FINALSAW-JD-REQUEST-FORM-20170508.pdf Submittal You may submit requests via e-mail in PDF format to W ilmingtonNCREGnusac e. army. mil Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0 https://usace.contentdm.ocic.org/utils/getfile/collectionZp l602l coll9/idl2566 The Wilmington District is committed to providing the highest level of support to the public. From: Moose, David E CIV (USA) Sent: Wednesday, September 13, 2023 4:01 PM To: Williams, Kim <Kim.Williams&davey.com> Cc: Sugg, Mickey T CIV USARMY CESAW (USA) <Mickey.T.Suggnusace.army.mil>; Tim Long <tlong&.logandevelopers.com>; smtp-Collier, Richard <rcollier(cr�,mckimcreed.com>; Drew Hatcher <DHatcher(c�r�,mckimcreed.com>; Fryar, Wesley <wesley.fryar&davey.com> Subject: RE: [Non-DoD Source] PCN - Brunswick - Non -DOT I will not be available on the 15th. Is there another day that works for everyone? I could possibly do the 18th at some time. David Moose Regulatory Specialist US Army Corps of Engineers 69 Darlington Ave Wilmington, NC 28403 (910) 251-4810 David, e.moosenusace.army. mil E-PCN-Submittal httl2s:Hedocs.deq.nc.gov/Forms/Pre-Construction_ Notification_ Form PJDs, Wetland Delineation Concurrence & JD`s. http://saw-reg.usace.army.mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf Submittal You may submit requests via e-mail in PDF format to WilmingtonNCREGAusace. army.mil Automated Data sheets for Atlantic & Gulf Coastal Plain Data Form Version 2.0 https://usace.contentdm.ocic.org/utils/getfile/collectionZp l602l coll9/id/2566 The Wilmington District is committed to providing the highest level of support to the public. From: Williams, Kim <Kim.Williams&davey.com> Sent: Wednesday, September 13, 2023 3:55 PM To: Moose, David E CIV (USA) <David.E.Moose&usace.army.mil> Cc: Sugg, Mickey T CIV USARMY CESAW (USA) <Mickey.T.Suggn.usace.army.mil>; Tim Long <tlong&logandevelopers.com>; smtp-Collier, Richard <rcollierna.mckimcreed.com>; Drew Hatcher <DHatcherna.mckimcreed.com>; Fryar, Wesley <wesley.fryarndavey.com> Subject: Re: [Non-DoD Source] PCN - Brunswick - Non -DOT Hi David and Mickey I wanted to follow up with you and see if you have any availability on Friday to discuss this project. Thanks! Kim On Fri, Sep 8, 2023 at 1:47 PM Williams, Kim <Kim.Williams&davey.com> wrote: Hi David and Mickey Thanks again for meeting with us earlier this week to discuss Malmo. It was very informative. The project engineers have been working on conceptual plans for the project area and they hope to have them completed by mid next week. Would you both be available on Friday (9/15) for another call to review these plans and discuss next steps? Thanks! Kim On Wed, Sep 6, 2023 at 8:42 AM Moose, David E CIV (USA) <David.E.Moosenusace.army.mil> wrote: We can do loam. David Moose Regulatory Specialist US Army Corps of Engineers From: Williams, Kim <Kim.Williams(adavey.com> Sent: Wednesday, September 6, 2023 7:04 AM To: Moose, David E CIV (USA) <David.E.MooseQusace.army.mil>; Sugg, Mickey T CIV USARMY CESAW (USA)<Mickey.T.Sugg(&,usace.army.mil> Cc: Tim Long <tlong(alogandevelopers.com>; smtp-Collier, Richard <rcollier&mckimcreed.com>; Drew Hatcher <DHatcher&mckimcreed.com> Subject: Re: [Non-DoD Source] PCN - Brunswick - Non -DOT Hi David and Mickey Are you available today at 10 AM for a conference call to discuss Malmo Loop? If so, I'll send out a Teams invite. Thanks! Kim On Wed, Aug 30, 2023 at 1:10 PM Moose, David E CIV (USA) <David. E.Moose&usace. army.mil> wrote: Good Morning As of 8/28/2023 I will be handling Brunswick County. I have started reviewing the PCN for 2022-02583 Malmo Loop Tract _ Phase 1 and Spine Road. Currently, we do not consider this application as being complete. This is because we cannot determine the indirect impacts from the proposed installation of the spline road (See Condition 32 of NWP 29). The proposed road appears that it will not be an independent utility of the proposed development along Malmo Loop but will be used for multiple phases and future development. When making minimal adverse environmental effects determinations the district engineer will consider the direct and indirect effects caused by the NWP activity. We would need to look at all potential development plans that this road would service. If you would like to discuss this further, please feel free to contact me and we can set up a time. Thank you. David Moose Regulatory Specialist US Army Corps of Engineers From: WilmingtonNCREG<WilmingtonNCREG&usace.army.mil> Sent: Monday, August 28, 2023 1:09 PM To: Moose, David E CIV (USA) <David.E.Moose &,usace.army.mil> Subject: FW: [Non-DoD Source] PCN - Brunswick - Non -DOT Thanks Kasey ****Please do not respond to this email with questions concerning your request. Please contact the PM directly **** From: WilmingtonNCREG Sent: Monday, August 28, 2023 8:59 AM To: Beecher, Gary H CIV USARMY CESAW (USA) <GG=.H.Beecherna.usace. army.mil> Subject: FW: [Non-DoD Source] PCN - Brunswick - Non -DOT 2022-02583 (Malmo Loop Tract _ Phase 1 and Spine Road Thanks Kasey ****Please do not respond to this email with questions concerning your request. Please contact the PM directly **** From: laserfiche.ncdenr.gov&mccicloud.io <laserfiche.ncdenr.govnmccicloud.io> Sent: Friday, August 25, 2023 2:31 PM To: WilmingtonNCREG<WilmingtonNCREG&usace.army.mil> Cc: SAW-PCN-RG <SAW-PCN-RG(kusace.army.mil> Subject: [Non-DoD Source] PCN - Brunswick - Non -DOT A new project has been received on 8/25/2023 2:30 PM for Malmo Loop Tract - Phase 1 and Spine Road. The link below will take you to the project folder. htips:Hedocs.deq.nc.gov/Laserfiche/index.asl2x? db=WaterResources#id=2933 577:view=browse This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored.