HomeMy WebLinkAboutSW6230401_Supplement-EZ Form_20231017 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
r 1 Project Name Phalanx Crossfit
2 Project Area(ac) 2.18
3 Coastal Wetland Area(ac) 0
4 Surface Water Area ac _ 0
5 Is this ro'ect High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 JWJdth of vegetated setbacks provided feet 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is strenmbank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond 1
14 Stormwater Wetland
15 Permeable Pavement _
16 Sand Filter A�
17 Rainwater Harvesting RWH _
18 Green Roof
19 Level Spreader-Filter Strip LS-FS
20 Disconnected Impervious_ Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 ,Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Jarrod E.Hilliard,PE,CFM,Owner
28 Organization: Hilliard EnCneering,PLLC
29 Street address: 3417 Winterwind Circle
30 JCity,State,Zip: Sanford,NC 27330
31 1 Phone number(s): 919-352-2834
32 Finail jhilliard@hilliardengineering.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete,and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
J
Designer
O
.•'0kESs�o''
Signature of Desi r
�Q SEAL 0..
1 035670
4p%
..� \�
Seal Date
DRAINAGE AREAS
1 :Is this a high density project? Yes
2 If so,number of drainage areas/SCMs 1
3 Does this project have low density areas? No
4 If so,number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
rD
DRAINAGE AREA INFORMATION Entire Site 1
4 Type of SCM wet pond
5 ITotal drainage area(sq ft 125,361 32,944
6 Onsite drainage area(sq ft 32,944 32,944
7 Offsite drainage area(sq ft 92417 0
8 Total BUA in project(sq ft 36907 sf 29038 sf
New BUA on subdivided lots(subject to permitting)
9 (sq ft
New BUA not on subdivided lots(subject to
10 permitting) s 29038 sf 29038 sf
11 Offsite BUA(sq ft) 7869 sf
12 Breakdown of new BUA not on subdivided lots:
Parking(sq ft) _ 16879 sf 16879 sf
Sidewalk sq ft) 159 sf 159 sf
Roof(sq ft 12000 sf 12000 sf
Roadway s ft
-Future(sq ft)
-Other,please specify in the comment box
below(sq ft
New infiltrating permeable pavement on
13 subdivided lots(sq ft
New infiltrating permeable pavement not on
14 subdivided lots(sq ft)
Existing BUA that will remain(not subject to
15permitting) s ft
16 Existing BUA that is already permitted(sq ft
17 Existing BUA that will be removed(sq ft
18 Percent BUA 29% 88%
19 Desi n storm(inches) 1.0 in
20 Design volume of SCM(cu ft) 2326 cf
21 Calculation method for design volume simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
WET POND
1 Drainage area number 1
___a,Minimum rewired treatment volume(cu ft) _ 2326 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out?
4:Is the SCM located away from contaminated soils? Yes
51 What are the side slopes of the SCM H: ? 3:1
Does the SCM have retaining walls,gabion walls or other engineered
6 side slopes? Yes
Are the inlets,outlets,and receiving stream protected from erosion
7 10-year storm)? Yes
Is there an overflow or bypass for inflow volume in excess of the
6 design_ volume? Yes
9 What is the method for dewatering the SCM for maintenance? Pump(preferred)
10I If applicable,will the SCM be cleaned out after construction? Yes
111 Does the maintenance access comply with General MDC(8)? Yes _
12,Does the drainage easement comply with General MDC(9)? Yes
13 If the SCM is on a single family lot,does(will?)the plat comply with _ N/A
General MDC 10?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
151 Is there an O&M Plan that complies with General MDC(12)? Yes
161 Does the SCM follow the device specific MDC? Yes
17 Was the SCM designed by an NC licensed professional? Yes
ET POND MDC FROM 02H.1053
18'Sizing method used SA/DA
19 Has a stage/storage table been provided in the calculations? Yes
20
Elevation of the excavated main pool depth(bottom of sediment
removal)(fmsl) 363.50
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 364.50
22 Elevation of the bottom of the vegetated shelf(fmsl) 370.50
231 Elevation of the permanent pool(fmsl) 370.50
24 Elevation of the top of the vegetated shelf(fmsl) 371.50
25 Elevation of the temporary pool(fmsl) 371.50
261 Surface area of the main permanent pool square feet) 2038
271 Volume of the main permanent pool(cubic feet) 6128 cf
28 Avera a depth of the main pool(feet) 3.01 ft
29 Avera a depth equation used Equation 2
301 If using equation 3,main pool perimeter(feet)
31 If using equation 3,width of submerged veg.shelf(feet)
32 Volume of the forebay cubic feet) 9"cf
33 Is this 15-20%of the volume in the main pool? Yes
34 Clean-out depth for forebay(inches) 36 in
35 Design volume of SCM(cu ft) 3511 cf
36 Is the outlet an orifice or a weir? Orifice
371 If orifice,orifice diameter(inches) 3/4"
38 If weir,weir height(inches)
39 If weir,weir length(inches)
40 Drawdown time for the tempos pool(days) 4.93
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? No
43 Depth of forebay at entrance(inches) 42 in
44.Depth of forebay at exit(inches) 30 in
45'Does water flow out of the forebay in a non-erosive manner? Yes
46 Width of the vegetated shelf(feet) 6 ft
471 Slope of vegetated shelf(H:V) 6:1
48
Does the orifice drawdown from below the top surface of the
permanent I? Yes
49 Does the pond minimize impacts to the receiving channel from the 1- Yes
r,24-hr storm?
50 Are fountains proposed?(If Y,please provide documentation that No
MDC 9 is met.
51 Is a trash rack or other device provided to protect the outlet system? Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment Centipede
54 Has alanting plan been provided for the vegetated shelf? _ Yes
ADDITIONAL INFORMATION
55 Please use this space to provide any additional information about the ,
wet pond(s).
Wet Pond 1 2:30 PM 10/17/2023