HomeMy WebLinkAbout20090499 Ver 3_CAMA Application_20231016DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
Envranmen ral
Quality
1. APPLICANT'S NAME: ML Marina LLC & ML Masters LLC
2. LOCATION OF PROJECT SITE: 201 Fernando St Manteo, NC 27954
Longitude:-75.67067 Latitude: 35.90715
3. INVESTIGATION TYPE: CAMA + Dredge & Fill
4. INVESTIGATIVE PROCEDURE:
Date of Visit
Purpose of Visit
Applicant Present?
7/18/2023
Modification to Major Permit
Yes
5. PROCESSING PROCEDURE:
Application Received
Application Complete
Regional Office
8/24/2023
9/17/2023
1 DCM - Elizabeth City Regional Office
6. SITE DESCRIPTION:
(A) Local Land Use Plan:
Land Classification from LUP: Land Classification From LUPs
(B) AEC(s) Involved: Coastal Shoreline, Estuarine Shoreline, Public Trust Shoreline,
Public Trust Areas, Estuarine Waters
(C) Water Dependent: Yes
(D) Intended Use: Private/Community
(E) Wastewater Treatment:
Existing: Central & Municipal
Planned: N/A
(F) Type of Structures:
Existing: Marina, Piers (Ocean and Estuarine) and Docking Facilities, Boat slips,
Boathouse, Finger pier, Pier or dock, Platform, Breakwater, Bulkhead(below MHW
wood), Boardwalk, Condo, Misc. building, Parking lot, Res. bldg.(single family)
Planned: Breakwater, Bulkhead(below MHW/NHW vinyl), Boardwalk
(G) Estimated Annual Rate of Erosion: N/A
Erosion Information Source: Annual Erosion Source
7. HABITAT DESCRIPTION:
DREDGED (ft2)
FILLED (ft2)
OTHER (ft2)
A Open Water
480
(B) CW's above NHW
C CW's below NHW
(D) Shallow Bottom
1576
E High Ground
15160
F Non -Coastal WL
(E) Total Area Disturbed: 17216 ft2
(F) Primary Nursery Area: Secondary
(G) Water Classification: SC: Aquatic Life, Secondary Contact Recreation, Tidal Salt
Water
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 11
Open to Shellfishing: No
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 12
8. PROJECT SUMMARY:
The applicant proposes the replacement of the existing bulkhead, boardwalk, and breakwater.
9. NARRATIVE DESCRIPTION:
The proposed development site is listed as Marshes Light at 201 Fernando Street; the project
area is adjacent Fernando and Compton Street in the Town of Manteo and Shallowbag Bay.
The property is listed under the names of ML Marina LLC & ML Masters LLC, and the
parcels total 14.5 acres. The properties are currently developed with a marina with 60 slips,
piers, boat slips, finger piers, breakwater, bulkhead, boardwalk, condos, a net shed, and
parking. Vegetation on the site includes the Coastal wetland (CW) plant Black needle rush
(Juncus roemerianus), 404 wetland plant Phragmites, Atlantic Cedar, Pine trees, and
indigenous grass. The shoreline is —3,125 linear feet (lft) and is bulkheaded except for
locations where CW and 404 vegetation exists. The elevation of the shoreline ranges from 3 to
5 feet above Normal Water Level (NWL).
The riparian property to the north is marsh land and is developed with a boardwalk and
platforms. The riparian property to the south is developed with a single-family residence, pier,
slips and boat ramp.
Major Permit #124-05 was originally issued to Harry Schiffman in 2005 for maintenance
excavation, bulkhead/retaining wall, gazebo, and the development of single-family residential
structures and condominium complexes. The permit was transferred in 2006 to Marshes Light,
LLC. Minor modifications to the permit included increasing the boardwalk and the addition of
the Harbor Masters Shed. A major modification was issued in 2009 to include the expansion
of the marina and addition of fuel services. The permit was transferred to ML Marina LLC &
ML Masters LLC in 2020. Another major modification was issued in 2021 for a marina
expansion to include 93 additional boat slips and a breakwater; this development has not taken
place to date.
The water classification for adjacent waterbody is SC: Aquatic Life, Secondary Contact
Recreation, Tidal Salt Water. It is designated as Coastal Waters and is in the Pasquotank River
Basin. The water depths along the project area range from -2.46' to-3.3.64' NWL. The
project area is in a secondary primary nursery area and is closed to shellfishing.
10. PROJECT DESCRIPTION:
The existing 518 lft of wooden bulkhead is proposed to be replaced with a vinyl bulkhead. The
alignment will be placed an average distance of 2' waterward of NWL, with a maximum
distance of 4' waterward of NWL.
The current 528-1ft boardwalk is partially sited over water and partially upland of the bulkhead
over land. The replacement 10-foot wide boardwalk will be proposed with 481ft constructed
over water and the balance of 4801ft constructed over land.
An existing 441ft breakwater to the north of the existing bulkhead is proposed to be replaced
with slotted, vinyl sheeting. The new breakwater will be constructed approximately 6'
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 13
landward of the existing wooden breakwater, which will be removed.
11. ANTICIPATED IMPACTS:
Construction of the replacement bulkhead and breakwater will fill and disturb 1,576 sf of
Shallow Bottom Habitat in the EW/PTA Areas.
The replacement boardwalk constructed over water will shade 480 sf of Open Water Habitat in
the EW/PTA Areas.
The replacement boardwalk constructed over land will shade 4,800 sf of High Ground habitat in
the CS Areas. The upland disturbance associated with the tiebacks/fill for the replacement
bulkhead will impact—10,360 sf of High Ground habitat in the CS Areas.
Name: YVONNE Date: 10-16-2023 Office: DCM - Elizabeth City Regional Office
CARVER
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 14
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT PA-1156
1. APPLICANT'S NAME: ML Marina LLC & ML Masters LLC
Major Modification to #124-05
2. LOCATION OF PROJECT SITE: 201 Fernando St Manteo, NC 27954; adjacent
Shallowbag Bay
Longitude:-75.67067 Latitude: 35.90715
3. INVESTIGATION TYPE: CAMA + Dredge & Fill
4. INVESTIGATIVE PROCEDURE:
Date of Visit
Purpose of Visit
Applicant Present?
7/18/2023
Modification to Major Permit
Yes
5. PROCESSING PROCEDURE:
Application Received
Application Complete I
Regional Office
8/24/2023
9/17/2023
1 DCM - Elizabeth City Regional Office
6. SITE DESCRIPTION:
(A) Local Land Use Plan: Town of Manteo
Land Classification from LUP: B-2
(B) AEC(s) Involved: Coastal Shoreline (CS), Public Trust Areas (PTA), Estuarine
Waters (EW)
(C) Water Dependent: Yes
(D) Intended Use: Private/Community
(E) Wastewater Treatment: Existing: Central
Planned: N/A
(F) Type of Structures: Existing: Marina, Piers, Boat slips, Finger pier, Platform,
Breakwater, Bulkhead, Boardwalk, Condos, Net shed, and Parking lots
Planned: Breakwater, Bulkhead, Boardwalk
(G) Estimated Annual Rate of Erosion: N/A
Erosion Information Source: N/A
7. HABITAT DESCRIPTION:
DREDGED ft'
FILLED (ft')
OTHER ft'
(A) Open Water
480
B CW's above NHW
(C) CW's below NHW
D Shallow Bottom
1576
E High Ground
15160
(F) Non -Coastal WL
(E) Total Area Disturbed: 17, 216 ftz (0.39 acres)
(F) Primary Nursery Area: Secondary
(G) Water Classification: SC: Aquatic Life, Secondary Contact Recreation, Tidal Salt
Water; Open to Shellfishing: No
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 11
8. PROJECT SUMMARY:
The applicant proposes the replacement of an existing bulkhead, boardwalk, and breakwater.
9. NARRATIVE DESCRIPTION:
The proposed development site is listed as Marshes Light at 201 Fernando Street; the project
area is adjacent Fernando and Compton Street in the Town of Manteo and Shallowbag Bay.
The property is listed under the names of ML Marina LLC & ML Masters LLC, and the
parcels total 14.5 acres. The properties are currently developed with a marina with 60 slips,
piers, boat slips, finger piers, breakwater, bulkhead, boardwalk, condos, a net shed, and
parking. Vegetation on the site includes the Coastal wetland (CW) plant Black needle rush
(Juncus roemerianus), 404 wetland plant Phragmites, Atlantic Cedar, Pine trees, and
indigenous grass. The shoreline is —3,125 linear feet (lft) and is bulkheaded except for
locations where CW and 404 vegetation exists. The elevation of the shoreline ranges from 3 to
5 feet above Normal Water Level (NWL).
The riparian property to the north is marsh land and is developed with a boardwalk and
platforms. The riparian property to the south is developed with a single-family residence, pier,
slips and boat ramp.
Major Permit #124-05 was originally issued to Harry Schiffman in 2005 for maintenance
excavation, bulkhead/retaining wall, gazebo, and the development of single-family residential
structures and condominium complexes. The permit was transferred in 2006 to Marshes Light,
LLC. Minor modifications to the permit included increasing the boardwalk and the addition of
the Harbor Masters Shed. A major modification was issued in 2009 to include the expansion
of the marina and addition of fuel services. The permit was transferred to ML Marina LLC &
ML Masters LLC in 2020. Another major modification was issued in 2021 for a marina
expansion to include 93 additional boat slips and a breakwater; this development has not taken
place to date.
The water classification for Shallowbag Bay is SC: Aquatic Life, Secondary Contact
Recreation, Tidal Salt Water. It is designated as Coastal Waters and is in the Pasquotank River
Basin. The water depths along the project area range from -2.46' to -3.64' NWL. The project
area is in a secondary primary nursery area and is closed to shellfishing.
10. PROJECT DESCRIPTION:
The existing 5181ft of wooden bulkhead is proposed to be replaced with a vinyl bulkhead.
There are three areas on the southern end that have experienced erosion landward of the
existing bulkhead, resulting in a NWL measurement of 4' to 8' landward of the derelict wall.
The new alignment will be placed a maximum distance of 2' waterward of the current
bulkhead.
The current 528-1ft boardwalk is partially sited over water and partially upland of the bulkhead
over land. The replacement 10-foot wide boardwalk will be proposed with 481ft constructed
over water and the balance of 4801ft constructed over land. Two sets of stairs are proposed to
access the new boardwalk.
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 12
An existing 441ft breakwater to the north of the existing bulkhead is proposed to be replaced
with slotted, vinyl sheeting. The new breakwater will be constructed approximately 6'
landward of the existing wooden breakwater, which will be removed.
11. ANTICIPATED IMPACTS:
Construction of the replacement bulkhead and breakwater will fill and disturb 1,576 sf of
Shallow Bottom Habitat in the EW/PTA Areas.
The replacement boardwalk constructed over water will shade 480 sf of Open Water Habitat in
the EW/PTA Areas.
The replacement boardwalk constructed over land will shade 4,800 sf of High Ground habitat
in the CS Areas. The upland disturbance associated with the tiebacks/fill for the replacement
bulkhead will impact—10,360 sf of High Ground habitat in the CS Areas.
Name: YVONNECARVER Date: 10-12-2023 Office: DCM - Elizabeth City Regional Office
Field Investigation Report: ML Marina LLC & ML Masters LLC
DCM Major Modification
Page 13
Permit Application Report
Application ID
Application Type
Submitted
App Complete
Deadline
Decision
Expiration
PA-1156
DCM Major
Modification
08-24-2023
09-17-2023
Primary Applicant Information
Applicant Type
Title
Business Name
Name
Email
Business Phone
Mobile
Phone
Business/Company
ML Marina LLC &
ML Masters LLC
ML Marina LLC &
ML Masters LLC
bhowsare@icrsaga.com
252-441-9003
Physical Address
Mailing Address
Street 1
City
State
Zip
Street 1
City
State
Zip
1314 S. Croatan Hwy,
Suite 301
Kill Devil
Hills
NC
27948
P.O. Box 90
Kill Devil Hills
NC
27948
Registered Agent Information
Agent Type
Title
Business Name
Name
Email
Business Phone
I Mobile Phone
Individual
Mr.
Brian Rubino
brubino@quible.com
12524918147
12524918147
Physical Address
Mailing Address
Street 1
City
State
Zip
Street 1
City
State
Zip
8466 Caratoke
Hwy Ste 400
Powells Point
NC
27966
P.O. Drawer 870
Kitty Hawk
NC
27949
Project Information
Project Name
Project Type
Disturbed Land Area (Scl Ft/Acres)
1
Marshes Light
Private/Community
8882 Sq. Ft. / 0.2 Acres
Is proposed project located in national registered historic district or national register listed/eligible: False
List of previous state or federal permits for work on project tract: A list of prior permits, transfers and modifications is included
in the project narrative section since this section does not provide sufficient space to include everything.
Project Location Information
Address
County
River Basin
Subdivision
County Parcel ID
Latitude
Longitude
201 Fernando St Manteo, NC
27954
Dare
Pasquotank
025557000
35.90715
-75.67067
Project Discharges to State Waters
Discharge Type
Surface Sanitary
Runoff Wastewater
Industry/Commercial
Effluent
Vessel
Wash Down
Residential
Other
Wastewater/Stormwater Discharged Into Wetland?
Discharge Same Salinity as Receiving Waters
Is There Any Mitigation Proposed
False
False
False
Detailed Description of the Existing Development Located on the Property
Existing Man -Made Features:
Existing man made features on -site include a boardwalk, bulkhead, breakwaters, roads, parking, sidewalks, single family residences,
condos, ship store, marina, docks, and piers.
Existing Land Uses:
The existing land use is a mixed use development consisting of residential, commercial, and marina facilities. Adjacent properties
include similar uses.
Existing Wastewater Treatment/Disposal:
This served by the town of Manteo central wastewater system.
Solid Waste/Fish Offal/Trash Disposal:
On -site dumpsters and roll -out cans.
Use and Daily Operations of the Project When Complete
Proposed Development Purpose:
The proposed development includes the replacement of a portion of the existing bulkhead, boardwalk and a section of breakwater.
This is needed due to deteriorating conditions of the existing structures that are in need of replacement. The owners evaluated
repair versus replacement and it was determined it was prudent to replace in this situation.
Buildings/Facilities/Units/Structures:
Replacement of the existing bulkhead, boardwalk and a section of breakwater.
Use & Daily Operations:
The daily use of this section of the property will continue as a mixed use community and marina with parking and pedestrian access.
Construction Methodology & Equipment:
Construction equipment will consist of dump trucks, excavator, skid steers, vibratory hammer, and hand tools.
Development Activities Narrative Specifics:
The proposed development includes the replacement of the existing bulkhead, boardwalk and a section of breakwater all in need of
replacement. No new upland development or impervious surfaces are proposed.
Application Narrative:
The proposed project involves the replacement of an existing section of
boardwalk, bulkhead, and breakwater at Marshes Light in Manteo, Dare County,
North Carolina. Marshes Light (Site) is located along the shoreline of
Shallowbag Bay, and bound by Fernando Street to the north, Grenville Street to
the south and the College of the Albemarle Campus to the west.
The existing uplands on Site were permitted to be developed under CAMA Major
Permit #124-05. CAMA Permit 124-05 was modified in 2009 to permit the expansion
of the existing 60 slip marina. The permitted expansion included an additional
98 wet slips with a wave attenuator, sewer pump out, fuel tanks and other marina
amenities etc. CAMA Permit 124-05 was transferred to ML Marina, LLC in 2017. The
permit was renewed for several years while repair work was on going and the
permit expired in 2019. ML Marina, LLC (SAGA Construction) is now ML Masters,
LLC. These two entities are managed by the same people, but both oversee Marshes
Light. The marina has existed in its current location and configuration since
the late 1970's. In 2020, a Major Modification was issued for the expansion of
the existing marina to 153 slips and the addition of a wave attenuation
breakwater system.
This proposed modification is for the replacement of an existing boardwalk,
bulkhead, and breakwater on the northern side of the property. This modification
does not include any changes to the permitted marina. The existing boardwalk at
the northern end of the property that was permitted in the original CAMA Major,
is in need of replacement to due age and normal wear and tear. A new 10ft wide
by 528 LF boardwalk is proposed within the a similar footprint of the existing.
This boardwalk is situated over the top of a timber bulkhead that is also in
need of replacement. Currently 1,522 sf of the existing boardwalk is situated
over water, and 3,711 sf is situated over land. The new proposed boardwalk would
be mostly situated over land with only the section of boardwalk at the
breakwater (442 sf) and a small section at the southern end of the boardwalk (40
SF) to continue to be over water. All of the rest of the boardwalk (4,798 sf)
would be over land based on the new bulkhead alignment and fill. This
modification also includes the construction of a new bulkhead and wingwalls
approximately 2ft waterward of the existing bulkhead and 518ft in length. The
new bulkhead alignment would require 1,532 sf of material to be placed below NWL
for backfill and filling in washout areas. The new boardwalk would follow the
alignment of the new bulkhead, allowing the majority to be over land. In
addition to the new boardwalk and bulkhead, a 44 LF section of the existing
breakwater to the north of the existing bulkhead is proposed to be replaced.
This new section of breakwater would be placed landward of the existing and
would be constructed of slotted vinyl sheeting instead of timber. All proposed
work and existing features are shown on the attached CAMA Major Plan.
The project proponent hereby certifies that all information contained herein is
true, accurate, and complete to the best of my knowledge and belief. The project
proponent hereby requests that the certifying authority review and take action
on this CWA 401 certification request within the applicable reasonable period of
time.
Boat Ramp Development Activity Included: False
Shoreline Stabilization Development Activity Included: True
Has There Been Erosion in the Preceding 12 Months Amount of Erosion (Feet Within the Past 12 Months)
False
Source of Erosion Amount Information
Shoreline Stabilization
Type of Stabilization
Describe "Other' Stabilization
Bulkhead
Type of Stabilization Material
Describe "Other' Stabilization Material
Vinyl
Length
Width
Avg Distance Waterward of NWH/NWL
Max Distance Waterward of NHW/NWL
518
1
2
2
Sq Ft of Fill to be Placed Below Water Level
Type of Fill Material
Source of Fill Material
1532
Sand
Approved sand mine
How Will Fill Material be Kept on Site and Erosion Controlled
All material will be sloped and seeded as to not promote erosion
Will Wetlands be Crossed in Transporting Equipment to Project Site
Explain Steps Taken to Avoid/Minimize Environmental Impact
False
Shoreline Stabilization
Type of Stabilization
Describe "Other" Stabilization
Breakwater
Type of Stabilization Material
Describe "Other' Stabilization Material
Vinyl
Length
Width
Avg Distance Waterward of NWH/NWL
Max Distance Waterward of NHW/NWL
44
1
2
4
Sq Ft of Fill to be Placed Below Water Level
Type of Fill Material
Source of Fill Material
0
No fill will be utilized for this breakwater
How Will Fill Material be Kept on Site and Erosion Controlled
No fill will be utilized for this breakwater
Will Wetlands be Crossed in Transporting Equipment to Project Site
Explain Steps Taken to Avoid/Minimize Environmental Impact
False
Living Shoreline Development Activity Included: False
Piers & Docking Facilities Development Activity Included: True
Docking Facilities Details
Facility Use
# of Tie Pilings
Existing Slips
New Slips
Private/Community
0
153
0
Piers & Docking Facility Structures
Structure Type
Length
Width
Quantity
Fixed Platforms
528
10
1
Freestanding Moorings & Buoys Associated With This Docking Facility
Structures Consistent With Water Use Plan Existing Freestanding Moorings & Buoys Slips I New Freestanding Moorings & Buoys Slips
True
Buoy Details:
Moorings & Buoys Details
Mooring or Buoy Distance From Shoreline Arc of Swing Water Depth
Excavation Development Activity Included: False
Bridges & Culverts Development Activity Included: False
Oceanfront Erosion Control Development Activity Included: False
Temporary Structures Development Activity Included: False
Utility Crossings Development Activity Included: False
Freestanding Moorings, Buoys & Bird Nesting Poles Development Activity Included: False
Log Removal/Marine Debris Development Activity Included: Yes/No
Navigational Aids Development Activity Included: False
Other Fill Below Water Level Development Activity Included: False
Stormwater Structures Development Activity Included: False
"Upland Development" Development Activity Included: False
Energy Facilities Development Activity Included: False
Aquaculture Development Activity Included: False
Submerged Lands Mining Development Activity Included: False
General Development Activity Details Required
General Development Activity Questions
These questions are applicable if 1 of the following development activities are included in the project
(Boat Ramps, Freestanding Moorings, Buoys & Bird Nesting Poles, Piers & Docking Facilities, Temporary Structures, Living Shorelines,
Shoreline Stabilization Submerged Lands Mining)
Boat Type(s)
Typical Boat Length
Other Boat Type (Describe)
Open runabout; Sail boat
25
Adj Riparian Property Line #1 (Proximity of
Structure Nearest to Property Line)
Adj Riparian Property Line #2 (Proximity of
Structure Nearest to Property Line)
Adj Riparian Property Line #3 (Proximity of
Structure Nearest to Property Line)
26
370
Width of Water Body
Water Depth @ Waterward End of
Structure (NLW or NWL)
Water Depth @ Most Landward
Boat Slip (NLW or NWL)
Water Depth @ Most Waterward
Boat Slip (NLW or NWL)
17400
-3
-3
-3
Navigational
Aids Required
Number of
Buoys
Number of Day
Markers
Min Distance of Each Aid Placed
Beyond Shoreline
Max Distance of Each Aid Placed
Beyond Shoreline
False
Marina Development Activity Details Required
Marina Details
These questions are applicable if there are a combined number of slips of 10 or more across all development activities
Repair or Maintenance
Services
Travel Lift
and/or Rail
Fuel & Marine
Supplies
Dry Storage (# of Boats)
Lease of Slips
Other Services
False
False
False
False
False
Detailed Plan - Location of Repair/Maintenance Services & Efforts to Contain Debris/Runoff From Entering Adjacent Wetlands/Water Bodies
Provide a Detailed Plan of the Location of Fuel Handling Facilities & Describe Safety Measures Planned to Protect Water Quality
Other Services (Detailed Description)
Industrial Pollutants Being Used (Paint, Sandblasting Waste,
Petroleum Products, Vessel Maintenance Operations)
Industrial Pollutants Management Plan
False
# of Toilets
# of Showers
Location of Toilets
Boat Holding
Tank Pumpouts
Existing
Pumpouts
Proposed
Pumpouts
Pumpouts —Location of Each
Pumpouts —Type of Each
False
How Will Overboard Discharge of
Sewage From Boats be Controlled
Number of Channel Marker
or No Wake Signs Proposed
Provide Details to the Type of Signage and Location of the Signs
Marina Safety Policy on
Overnight & Live Aboard Storage
Marina Located Within or Close
Proximity to Shellfish Lease
Shellfish Lease
Proximity to Marina
Shellfish Leasholder(s) Name & Address
False
CAMA PERMIT
APPLIED FOR
PROJECT: Replacement of existing boardwalk,
bulkhead, and breakwater on the northern side of
the property.
COMMENTS ACCEPTED THROUGH 11-03:2023
APPLICANT FOR MORE DETAILS CONTACT
THE LOCAL PERMIT OFFICER BELOW,
ML Marina LLC & ML Masters LLC YVONNE CARVER - DCM
c/o Brian Rubino 252.491.8147 401 South Griffin Street, Suite 300
1314 S. Croatan Hwy, Suite 301
Elizabeth City, NC 27909
Kill Devil Hills, NC 27948 252-264-3901
DATE: July24th, 2023
NAME: Town of Manteo
ADDRESS: PO Box 246
CITY: Manteo ST: NC ZIP: 27954
RE: Marshes Light Major Modification
To Whom It May Concern:
This correspondence is to notify you as a riparian property owner that ML Master, LLC is applying for a Major Modification to
their active CAMA Major permit to: replace the existing bulkhead on the northern end of the property with a new one 2 ft
waterward of the existing, replace the existing 1 Oft wide boardwalk over the existing bulkhead, and replace a 44 ft section of
the existing breakwater landward of the existing , on their property located at 201 Fernando St. Manteo, NC 27954, which is
adjacent to your property. A copy of the application and project drawing(s) is enclosed for your review. If you have no
objections to the proposed activity, please mark the appropriate statement below and return as soon as possible to:
Troy Murphy, Quible & Associates P.C. at PO Box 870, Kitty Hawk, NC 27949
If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments
regarding this project. If you have objections or comments, please mark the appropriate statement below and send your
correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you
have questions about the project, please do not hesitate to contact me at 252-491-81478 or the Division of Coastal
Management at 252-264-3901.
Sincerely, -?� 1��
Troy Murphy (Authorize g nt on behalf of ML Master, LLC)
I have no objection to the project as described. I have objection(s) to the project as described.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of
15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank
below.)
I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement.
Print Name Signature of Adjacent Property Owner
Mailing Address and/or Email Address
Date
Phone Number
DATE: July 24th, 2023
NAME: Walter E. & Linda M. Daniels
ADDRESS: 24 Oak Drive
CITY: Durham ST: NC ZIP: 27707
RE: Marshes Light Major Modification
To Whom It May Concern:
This correspondence is to notify you as a riparian property owner that MIL Master, LLC is applying for a Major Modification to
their active CAMA Major permit to: replace the existing bulkhead on the northern end of the property with a new one 2 ft
waterward of the existing, replace the existing 1 Oft wide boardwalk over the existing bulkhead, and replace a 44 ft section of
the existing breakwater landward of the existing , on their property located at 201 Fernando St. Manteo, NC 27954, which is
adjacent to your property. A copy of the application and project drawing(s) is enclosed for your review. If you have no
objections to the proposed activity, please mark the appropriate statement below and return as soon as possible to:
Troy Murphy, Quible & Associates P.C. at PO BOX 870, Kitty Hawk, NC 27949
If no comments are received within 30 days of receipt of this notice, it will be considered that you have no comments
regarding this project. If you have objections or comments, please mark the appropriate statement below and send your
correspondence to the NC Division of Coastal Management at 401 S. Griffin St., Ste 300., Elizabeth City, NC 27909. If you
have questions about the project, please do not hesitate to contact me at 252-491-81478 or the Division of Coastal
Management at 252-264-3901.
Sincerely, "-1;VZ
Troy Murphy (Authorize Agent on behalf of MIL Master, LLC)
I have no objection to the project as described. I have objection(s) to the project as described.
WAIVER SECTION
I understand that a pier, dock, mooring pilings, boat ramp, breakwater, boathouse, lift, or groin must be set back a minimum distance of
15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank
below.)
I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement.
Print Name Signature of Adjacent Property Owner Date
Mailing Address and/or Email Address
Phone Number
■ Complete items 1, 2, and 3.
■ Print your name and address on the reverse
so that we can return the card to you.
• Attach this card to the tuck of the mallplece,
or on the front If space permits.
1. ArticI Addressed to: T
(X�o Y�?n -Z I L) AA ra/n RAJ j s
OUA
Ii i III II IIII III I Il I IIIII I II I III I I I II I IIhI l;l
9590 9402 6189 0220 6902 61
B. Received by
D. 1s delivery address different from Rem 1
If YES, enter delivery address below.
3. Service Type
❑ Adult SWatt"
❑ Adult Signature Restricted Delivery
FF Certified Mail Restricted Delivery
❑ Collect on Delivery
2. Article Number (Transfer from service labeO u Collect m Delivery Restricted Delvery
❑ Insured Mail
70C2 3330 0001 76.45 1798 Insured lRestrictedDelivery
PS Form 3811, July 2020 PSN 7530-02-NO-9053 .:
# Complete items 1, 2, and 3.
• Print your name and address on the reverse
so that we can return the card to you.
till Attach this card to the back of the mallpiece,
or on the front If space permits.
1. Article Addressed to.
-9Dwti o F- o-�
PO & x ayZD
IIIIIIIII IIII IIIiII IIIIIIIIII III IIIIIIIII II III
9590 9402 7482 2055 9389 22
2. Article Number {transfer from service la*
7022 3330 0001 7645 1781
Ps Form 3811, July 2020 PSN 7530-02-000-9053
A.
X
O Agent
❑ Priority Man Express®
❑ Registered Maur"
❑ Registered Mall Restri IG
❑ Signattuurs CwWmatlon"
❑ Signature Connrrnatim
Restricted Delivery
Domestic Return Receipt
❑ Agent
13rGe� b C. pate of Delivery
D: Is delivery address ditwt from Item t? ❑ Yes
If YES, enter delhrary address below. ❑ No
3. Service Type
❑ Priority Mall Exp wsO
0
n
gagdd signetare Restricted Delivery
LYCertlfled Mall®
0 RRaey� e d Mang ResMcted
De1Wery
0 Certified M�RuVicted Denvery
p ftnetwe conflrmatlonm
Collect on Wary
❑ Signature Confirmation
❑ Collect on Delivery Restricted Detivery
Restricted Dewey
❑ mewed Man
I Insured Mefi Restrioted Delivery
rovr r<arrr
Domestic Return Receipt
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRAXTON DAVIS
Director
EMAIL MEMORANDUM
TO: The Coastland Times
ATTN: Hannah Russ
NORTH CAROLINA
Environmental Quality
Manteo, NC 27954
legals(@-thecoastlandtimes.net
FROM: Lisa Doepker, Administrative Specialist
DATE: 10/16/2023
SUBJECT: Major Public Notice: ML Marina LCC & ML Masters LLC
Please publish the attached Notice in the Sunday, October 22, 2023, issue of The
Coastland Times. Please note that this is for a one -day publication only.
The State Office of Budget and Management requires an original Affidavit of Publication
prior to payment for newspaper advertising. Please send the affidavit, an original copy
of the published notice, an original invoice and payment request to Lisa Doepker, via
email at: lisa.doepker@deq.nc.gov.
Thank you for your assistance in this matter. If you should have any questions, please
contact me at our Elizabeth City office (252) 264-3901.
Attachment
cc: Curt Weychert, Assistant Major Permits Coordinator, DCM,
curt.weychert deq.nc.gov
Gregg Bodnar, Major Permits Coordinator, gregg.bodnar(�deg.nc.gov
Christy Simmons, PIO, DCM, christy.simmons(o)-ncdenr.gov
Ellie Davis, Accounts Payable, DCM, ellie.davis(@�ncdenr.gov
File
�North Carolina Department of Environmental Quality I Division of Coastal Management
Elizabeth City Office 1 401 South Griffin Street, Suite 300 1 Elizabeth City, North Carolina 27909
DepaN ent f Ent nm M ll 252.264.3901
NOTICE OF FILING OF
APPLICATION FOR CAMA MAJOR
DEVELOPMENT PERMIT
The NC Department of Environmental Quality hereby gives public notice as
required by NCGS 113A-119(b) that application for a development permit in an AEC as
designated under the CAMA was received on 9/17/2023. ML Marina, LLC & ML Masters
LLC, proposed the replacement of an existing bulkhead, bulkhead, boardwalk and
breakwater. Project area is located at Fernando and Compton Street in the Town
of Manteo.
A copy of the entire application may be reviewed at the office of the Division of
Coastal Management, located at 401 S Griffin St, Ste 300, Elizabeth City and reached by
phone at (252) 264-3901 during normal business hours. Comments mailed to Braxton
Davis, Director, DCM, 400 Commerce Avenue, Morehead City, NC 28557, prior to
November 13, 2023, will be considered in making the permit decision. Later comments
will be considered up to the time of permit decision. Project modification may occur based
on review & comment by the public, state & federal agencies. Notice of the permit
decision in this matter will be provided upon written request.
PLEASE PUBLISH ON: October 22, 2023
Troy Murphy
From: Troy Murphy
Sent: Friday, August 18, 2023 1:07 PM
To: 401 PreFile
Subject: NC DWR Pre -Filing Notification Request - Marshes Light, Manteo, Dare County, NC
Attachments: P03093-CAMA MOD PLAN-080923.pdf
Good Afternoon,
This email is to serve as a NC DWR Pre -Filing Notification request for a modification to an active CAMA Major permit for
Marshes Light, a property located at 201 Fernando Street in Manteo, Dare County, NC. The proposed project involves
the replacement of an existing section of boardwalk, bulkhead, and breakwater located along the shoreline of
Shallowbag Bay. The existing development and marina on site were permitted under CAMA Major Permit #124-05. This
modification does not include any changes to the permitted marina or upland development. This proposed modification
is for the replacement of an existing boardwalk, bulkhead, and breakwater on the northern side of the property. The
existing boardwalk at the northern end of the property was permitted in the original CAMA Major, is in need of
replacement to due age and normal wear and tear. A new 10ft wide by 528 LF boardwalk is proposed within the a
similar footprint of the existing. This boardwalk is situated over the top of a timber bulkhead that is also in need of
replacement. This modification would include the construction of a new bulkhead and wingwalls approximately 2ft
waterward of the existing bulkhead and 518ft in length. The new boardwalk would follow the alignment of the new
bulkhead. In addition to the new boardwalk and bulkhead, a 44 LF section of the existing breakwater to the north of the
existing bulkhead is proposed to be replaced. This new section of breakwater would be placed landward of the existing
and would be constructed of slotted vinyl sheeting instead of timber. All proposed work and existing features are shown
on the attached CAMA Major Plan. Please reach out with any questions about this proposed project.
Thank you,
Troy
Troy Murphy
Environmental Scientist
Quible & Associates, P.C.
8466 Caratoke Hwy, Bldg 400
Powells Point, INC 27966
PO Drawer 870
Kitty Hawk, NC 27949
t 252-491-8147
www.auible.com
LEGAL DISCLAIMER
The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or
privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by
persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and
delete the material from any computer.
NC Division of Coastal Management
Cashier's Official Receipt
27183(OAB C n
Received From:
Permit No.:
Applicant's Name: L�rl A.o, �d-C�L���C�L'C Gd,LLL
Project Address: �-o I G@CAanJ6 S-f ,
Date: 20 23
17
Check No.: 7,5'3
County: 'D c4-:tz—
Please retain receipt for your records as proof of payment for permit issued. Q
Signature of Agent or Applicant: `? Date: v
Date:
Signature of Field Representative:
�c:/Yt I31M�
NOT : THI DOCUMENT IS E IMINA Y - NOT OR CO STRUCF;ION,
REC RDATI N, SALES OR C N EYANC S - THIS DOCUM NT IS
DISCUSSIOO C"Z QN-1! 7XISTING INFORMATION SHOWN ON THIS
DOCU�ENT I BASED 0LT AV LA LE DAT AND IS NOT A CERTI IED SU EY.
ALL I�JFORM ION SHO THISD UMENT IS SUBJECT T ANY QUIREM NTS
BY -- Y-F�E — Y RAY` -- - —_ / —
QUIBLE F-AS-S-OCIA
COMPLETENESS OF ANY INFORMATI04
FOR ANY ERROR OR OMISSION OR AN
USE OF THIS INFORMATION.
I I
I
I
I I
I I
F-A
/ ':.
TOWN OF MATEO
OB 654, PG 413)
ST
b VHKHIVIGG IMC ALUUKH T VK I G I ----_ --
THIS CUMEN AND IS NOT RE PONSIBL
LOSSES OR DAM GES RE ULTING IROM TH
-u�L
�- - - - -
A
PROJECT
AREA
/ PERMITTED
DfiRTMOOR �F17E � . �/
f -1 ---� _ \� / [MARINA(NOT CONSTRUCTED)
NIF
4LTER ETHERIDGE DANIEL5
LINDA MARKV5 DANIEL5
(DB 1923, PG OlG2)
6RFAIVII I F: clT -
l
EXISTING
MARINA
U
PERMITTED
MARINA
(NOT CONSTRUCTED)
3N ALLOWBA6
BA Y
;7
/ �� �"`� O • J W O z
U
Z
Z
co�U � _
5NALLONlBAG J .0 g
BAY Q +°l�W
Z Z LJ O d N 00 e0
S//�/� °u W
^� 4 m y
OJ J 0 2 4i N N C
* Q o 0
rAzizz�a._ao
�p S
�j z z U
\ rn
l
PRELIMINARY
FOR CAMA
YlGINITY MAPPERMITTING
o' ONLY
Z
O
w
ry
o
co
a
O
u
aLd
w
5rrw1
M
O
U
w
o Z
w
x U
=
U
Ld
Zo
Of
Q
0
O
O
N oQ
z}� aowaz� Li
W H Q H p m H J Z
U CC Z wOw Ow Oa
g dw w zWJza��w
0 L U w a = U =
M tr Oa In tYO=
U NOW U
N~ lL Cl) Z_ nC-,)ln V1
U a LLJ
W H z W a z J W OU =
~a=mcoV) �oaJpw
U Z mwZ fnZ -
tZ' < (n cl) 0 LJUCC wm m0
0
w c�—�wz OL�oz z
tl Q��ZaOd WJp Uw0(n
W O W o U
U m U w H O m H p p m a
i a p L i O w
w o omw npLi Liz
N 00 J S J H O m I Y ZO
S a ~ w W U
M cn U
N —
N r
N m M
\ U M m
O M ~ ~ N
�
p a =coo u n
c� �
NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTION, ��� ��� If
RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR
DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS \ I
DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY.
ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS I�
BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. �� \ \\\\���� EBREX.
M7ER
ABLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE
COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE
FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE
USE OF THIS INFORMATION. �� +
EX.
INETLAND5 LINE
NET 5HED
l^ETLAND5 LINE
> — EX.
EX.
1 // v PIER
E
SHORELINE
X.
BREAKWATER
5E5TION TO BE
BENCH / NG REMOVED
PILI
(TYn)
/
EX.
/
I/O HIDE
BOARDNALK
Ap
EX.
/ SHORELINE
� Ex. /
j BENCH
BULKHEAD
5TAIR5
i' EX
5HORELINE
----,30,
BENCH 5HALLOWBA6
BAY
/ EX
/ BENCH / / / / / 5HORELINE
EX.
/ 1! BULKHEAD
CD
e * o
N
U yqj
� e J W O Z
c
U
�ZUaa�vyMv
Qe
Cl z W d N DO e0 p
V/
•�O—� �n N.-
�` 3
e�
y�C�Z z�aw:a
o
Z W o N
W O N U i
zL��
>Z� s
z z w V U
PRELIMINARY
FOR CAMA
PERMITTING
ONLY
z
0
LLI
ZO a
00
:II
C7 a
aLd
w
rrw1 0 Ll
U p Z
M mil/ 1.4 O cUi�
p4 C4 Z 0
O fY =
N O Q
FR] Z o
Q
y 0
O
Z
0
V) Z Q
Z}l aLd owa� _�
U a z O m O J O z 3
QOIWi Q Z=UJ=
0
�00
d
N~ 00
O0ed5z_<ZZ cn
0 zpwW�O�Wo
O H U= in
0 O z 0 z w
ZO
W 0""
(n W O Z U O d O Z Z
a i� E< 0-:E o OOOL
W OW 2vi0 Ua =�OLj0Z
owN U 5 U(=n J0mF ("m 0
a �LW
5 LnLi
J =J=U�
0
Q Q
Q U
N r
N m M
V rq m c�
pCCw O z mw
O Q ) U m _r. N
a o = u n
14
N
0
N
0
00
NK
PROPOSED
NEW BULKHEAD
2.0'
--N-W- IIIIj--
EX. PROPOSED
BULKHEAD NEW 10 FT
TO BE REPLACED WIDE BOARDWALK
TYPICAL BULKHEAD/BOARDWALK SECTION
*STRUCTURAL DESIGN BY OTHERS
N TS
PROPOSED
1" GAP
If
I
I
\\�\
EX.
\ \\\\ BREAKhG4TER
\ \
\
SECTION 404 j ;
\
_
WETLANDS LINE -%
1 / l EX.
NET SHED
EX. / 11
COASTAL
kETLAND5 LINE
I
1 EX. /
/� PIER v
99-
� �
5HORELINE I
EX.
MIVLi I
// BREAKWATER
/
5E5TION TO BE
EX. REMOVED
BENCH
o PILING
(Typ)
PROPOSED
NEW STORS
PROPOSED
G
REPLACEMENT
OF 44 LF
q,
F THE
^h
i
IB n1j2E LK EXISTING
rSLOTTED
���� Ap
/
BREAKWATER
/
EX
5HORELINE
h�
(NIHL)
— — i—i I I—III—III—III—III—III-1 I—i i— — / PROPOSED /
BENCH
NEW 528 LF
r BY 10 FT WIDE /
TIMBER/VINYL BREAKWATER SECTION BOARDWALK /
*STRUCTURAL DESIGN BY OTHERS / TO REPLACE
NTS
EXISTING /
AND FOLLOW /
NEW BULKHEAD /
ALIGNMENT/
/
— /AEG
-x. v
5TA/RS
EX./
/
-����
SHORELINE
PROPOSED
1,532 SF
PROPOSE
BENCH
OF FILL
BELOW NWL
FOR BULKHEAD
NEW STAI S/%
BACKFILL
/EX.�-
EX.
/ BENCH
5HORELINE
/
Er
j 5HORELINE ----1
EX.
/
BULKHEAD
1!
/
BULKHEAD
PROPOSED
NEW 518 LF
BULKHEAD
2 FT WATERWARD
OF EXISITNG
5HALLOWBA6
BA)"'
NOTE: THIS DOCUMENT IS PRELIMINARY — NOT FOR CONSTRUCTION,
RECORDATION, SALES OR CONVEYANCES — THIS DOCUMENT IS FOR
DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS
DOCUMENT IS BASED ON BEST AVAILABLE DATA AND IS NOT A CERTIFIED SURVEY.
ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS
BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY.
QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE
COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE
FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE
USE OF THIS INFORMATION.
O
e QD m
Z *w o m
Uzz4^ N
Z
ai W
ZM E
Z
N 7 U M V
Z W a p
"N
0- 3
e
z W
z� m
�p S
PRELIMINARY
FOR CAMA
PERMITTING
ONLY
z
O
U
w
o
a °°
A M �
O W :II
a
a Z w
w W
O w
Vi v o z
x ) =LLJ
py a 1.4 O V)
z U
M � _
O Q
Ld z o Of
Q
0
O
z
O
V) a
zO}n azwazo w
_o v)
Ld
U a z � u) m O J O =< 3
Qd 6:7E � I J Q Z= U J=
U N V7 d'aU FnU) 0
N~ 000p0d F-z��(n v)
OUa w�v_) LL,5�az�w
U =
S O (np mOZ Zww O (f)zp
W
a }�zaoa J�LLI 0�ov
W O W :E vi0 0 Q= O�oZ
S U m (w Q O m F 0 Z 0 w
w ao° w U)LjLj ww>
( n O J S J U m 0
= Q W LLj
U
M
N r
N m M
\ M o
cn
p w O z mw rr
O Q U m _r. N
a Of W u n
/VI [— ir111 ' 1 ; / 91 lI "I" I( /t , LLCs / //4 /'z3
� ".
� �,�;', t �� � �, r
� ��i�i(�r, ���
,. I
`R`� t [ y � n l '.' 1'..
� /J
i
/ � ,�
-- ,�
N f���';9�rtG•-rt
`��� /`t��: w
`�+
i
/ ��q'
.�t
1 JS�
��
�-
4 �A
i
r e
e (�
} �
'`� '
f a iM',
�'�'
�1 1 J.
}!
r���
i S
�A
� '-
�k
i .a'
i,_
,�
� �.