Loading...
HomeMy WebLinkAbout20231229 Ver 1_More Info Received_20231016Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID#* Version* 1 20231229 Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity?* Yes No Is this project a public transportation project?* Yes No Reviewer List: * Sue Homewood: Sue. Homewood Select Reviewing Office: * Central Office - (919) 707-9000 Does this project require a request for payment to be sent? Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Pre -Filing Meeting Date Request was submitted on: 7/26/2023 Is this supplemental information that needs to be sent to the Corps?* Yes No Project Contact Information Name: Chad Ponce Who is submitting the information? Email Address: chad.ponce@bolton-menk.com Project Information Existing ID #: Existing Version: 20231229 1 20170001(no dashes) 1 Project Name: Arrowridge Industrial Site Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown Is this project connected with ARPA funding? Yes No County (ies) Mecklenburg Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document 4802.04_Ex_F_Aquatic Resources MapRevl.pdf 6.62MB 4802.04_Ex_J_Aquatic Resources Impacts 6.57MB MapRevl.pdf Only pdf or kmz files are accepted. Describe the attachments or comments: Based on an email exchange with Emily Greer (USACE) on October 16th, Wetland 2 does not meet the hydrology indicators and should not be considered a wetland. I am submitting here a revised wetland delineation figure and impact map. The total impacts to aquatic resources at the site are now 0.02 acres of temporary impact for a sanitary sewer crossing. This impact meets the conditions of the General Certification for NWP 39 and NWP 58 and does not require an individual 401 WQ certification. I hereby would like to cancel the request for an individual WQ certification. Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: /ircf+raJ �rer Submittal Date: 10/16/2023 Is filled in automatically.