HomeMy WebLinkAbout20231299 Ver 1_Other_20231016Baker, Caroline D
From: Pitner, Andrew
Sent: Monday, October 16, 2023 3:03 PM
To: Wade Wilkerson
Subject: RE: [External] Shoreline Stabilization Permit
Your project is on our list and near the top of it. I'd expect that staff should be getting to the review within the next
week or two. I'll let them know that you've got a window for the work to occur.
Andrew
Andrew Pitner, P.G. - Andrew.Pitner@ncdenr.gov
Division of Water Resources - Water Quality Regional Operations
Mooresville Regional Office (MRO)
North Carolina Department of Environment & Natural Resources
610 East Center Avenue, Suite 301, Mooresville, NC 28115
MRO Main Phone: (704) 663-1699
Direct Office Phone: (704) 235-2180
MRO Fax: (704) 663-6040
DWR website: http://www.ncwater.org
NOTICE: Email correspondence to and from this address is subject to the North Carolina
disclosed to third parties unless the content is exempt by statute or other regulation.
From: Wade Wilkerson <wadewilk@gmail.com>
Sent: Monday, October 16, 2023 2:37 PM
To: Pitner, Andrew <andrew.pitner@deq.nc.gov>
Subject: [External] Shoreline Stabilization Permit
Public Records Law and may be
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Mr. Pitner,
Hello, my name is Wade Wilkerson and I have a home on Lake Tillery. We have a concrete bulkhead at our
property on Lake Tillery that does not need any work done on it. In front of it is an existing wooden
seawall/bulkhead with a boardwalk that is in need of repair. The existing concrete bulkhead will not be
altered. After contacting Duke Energy Lake Services last month about this they said I needed approval from
the state and then they would be able to review it.
I submitted my application through the NC Dept of Water Resources on 9/19/23 and paid the $240 fee on
9/20/23.
The website shows it in review with ID number 20231299.
Address is: 50421 Mallard Drive, Albemarle, NC 28001
I am sorry to bother you but I was hoping to check on the status and the expected completion of the review?
I'm sure you must be busy and hate to push, but they have started the 5 year lake draw down for repairs today
with the draw down taking about a week and staying about 6-10 feet below full pond for the next 3 weeks so I
am in a time crunch to get all approvals before starting work. Is there any way to expedite it?
I appreciate anything you can do to help.
Thank you,
Wade Wilkerson
wadewilkCa)-gmail.com
336-577-3249