Loading...
HomeMy WebLinkAbout820321_Routine Inspection_20231010Type of Visit: Q Compliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit:.—aRoutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Q O a Arrival Time: ;3d /1m Departure Time: Iyji7t County: 5"hRegion: Foe Farm Name: Owner Email: Owner Name: Phone: a Mailing Address: Physical Address: Facility Contact:Title: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? Phone:: p Integrator: Certification Number: OV q06 Certification Number: b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: ❑ Yes ,rNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA ❑ NE ❑NA ❑NE ❑ Yes ❑ No ❑ NA [_]NE ❑ Yes E7No ❑ NA ❑ NE ❑ Yes FrNo ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facili Number: - Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes , _-Mo ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): y 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes 6No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes eNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes .43 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ,❑i'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Ea -No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes _Q"No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes �' o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): ��i 4ZV� z��.e-�f.�-. 6 J &0 13. Soil Type(s):� 14. Do the receiving crops differ ft& those designated in the CAWMP? ❑ Yes [3"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes allo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? '[3-No 17. Does the facility lack adequate acreage for land application? ❑ Yes E]'No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes .ego ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes �jNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes r No ❑ NA ❑ NE the appropriate box. T ❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ErNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E[No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - _3 ` Date of Ins ection: . /Q a' 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ENo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes O'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? socl'�' _1�9 /' -_ Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 ❑ Yes fNo ❑ NA ❑ NE ❑ Yes J2'No ❑ NA ❑ NE ❑ Yes 2rNo ❑ NA ❑ NE ❑ Yes Ej'No ❑ NA ❑ NE ❑ Yes JCJ�'No ❑ NA ❑ NE ❑ Yes -E�No ❑ NA ❑ NE ❑ Yes E3'*No ❑ NA ❑ NE ❑ Yes E2'No ❑ NA ❑ NE ❑ Yes La'No ❑ NA ❑ NE Phone: '1y 9.2s —9225 Date: 0/L0 511212020 FACILIFf #: _��/ FARM NAME: LAGOON PERMIT ma) DUE EVERY 5 YEARS EXPERIATION DATE_ CURRENT NUMBER OF OIC CARD YES OR NO NUMBER OF ANIMALS G 3y0 WASTE UTILIZATION PLAN (WUP) (#20) SOIL TYPES CROP TYPES - ODOR CONTROL CHECKLIST YES OR NO - Irrigation Plan Maps YES OR NO WASTE REPORT (#21) -GOOD FO/R 60 J)AYS BEFORE OR AFTER DATE �`,�/� / - 3 NITROGEN LEVEL ! DATE z/� ` `/�3 NITROGEN LEVEL DATE L ` S L r3 NITROGEN LEVEL G //e-117- 3 DES SOIL REPORT (#21) - EVERY 3YEARS: DATE - P-I (NO MORE f4.r IW 600) - PH (Note if4 or lesv) - Cu2N (NO MORE THEN 3000) CU ZN (IF PEANUTS NO MORE THEN 300) Not over PAN CROP TYPES FLOW Not over PAN CROP TYPES IRR2 (#21) NITROGEN (N) FLOW RATES NITROGEN (N) Not over PAN CROP TYPES q�� FLOW NITROGEN (N) Not over PAN CROP TYPES FLOW RATES NITROGEN (N) CALBRIATION (s24) EACH REEL SHOULD BE CALI"AJ'ED RY OTHER YEAR DATE OF CALIBRATION !!//) FLOW RATES RAIN FALL (#21) -INITIAL AFTER 1" RAIN EVENT -LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED. DUES EV,fRY YEAR: DATE o2/a(aX SLUDGE (#21 &25) 0:-1 P: 3 %RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE 0: P: % RATIO OF SLUDGE O: P: % RATIO OF SLUDGE �40 OTHER FORMS (tt22 AND #21) RAIN BREAKER FORM CROP YEILDS—,X—MORTALITY *If fields are grazed there will be no crop yields VISUAL CHECK FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT CROPS NO PONDING REELS_ FEED BINS_ LAGOON GARBAGE Bermuda grass: Opens March I�t- Ends September 30t Small Grain Over seed: Opens October 1 st- Ends March 31A Corn: Opens February 15N-Ends dune 30* Cotton: Opens March 15w - Ends August 1� Rye: Opens September Id-EndsMarch 31st Oats: Opens September 1�f- Ends April 15t Wheat: Opens September 1st - Ends April 30t Soybeans: Opens April 1 st- Ends September 15n Fescue: Opens August 1 at- Ends July 31st Sorghum Hay: Opens March 15th - Ends August 31 st