HomeMy WebLinkAbout820401_Routine Inspection_20231010S4.
;l (111
jk Xf
X$$i ( ykflIl
�i��� lit t}{A
11', S...... 1Ij 47XI i{ i €rtko
�€a(i
,{j��d} ��!!i (
�.+i. {13`�
i
Type of Visit: E)Compliance Inspection 0 Operation Review Q Structure Evaluation Q Technical Assistance
Reason for Visit: aJRoutine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access
Date of Visit: /D Arrival Time: Departure Time: County: d_ l�yj Region: 569
Farm Name: ��j Loyd Ps Owner Email:
Owner Name: i F� �iiino Phone:
Mailing Address:
Physical Address:
Facility Contact: rr»•jJ� G� Title:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field Other:
a. Was the conveyance man-made?
Phone:
Integrator: 1�
Certification Number: C�-G�"yiUO
Certification Number:
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Yes
JNo
NA
❑ NE
❑ Yes
Ej No
❑ NA
❑ NE
❑ Yes
[—]No
❑ NA
❑ NE
Yes
❑ No
❑ NA
❑ NE
Yes
E]'No
Ej NA
❑ NE
❑ Yes
&No
❑ NA
0 NE
Page I of 3 511212020 Continued
Facility Number: Date of Inspection: d
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes [:]No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes ❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):_
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes ❑ No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes ❑ No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
.0 Yes ❑ No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes ❑ No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes ❑ No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes ❑ No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes ❑ No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):}Tjyj
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes ❑ No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes ❑ No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes ❑ No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes ❑ No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes ❑ No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes ffNo
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes [],No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes .0'No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall
Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes _E�No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes .0 No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: v Date of Inspection: �)
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
,.e-No
❑ NA
❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
EFYes
❑ No
❑ NA
❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ,❑failure to develop a POA for sludge
levels
❑ Non -compliant sludge levels in any lagoon LL__
date first indicating Fo#
C/�wtAu�
List structure(s) and of survey non-compliance: 9Ui
e
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
_4D No
❑ NA
❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
E'No
❑ NA
❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
❑ No
❑ NA
❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
❑ No
❑ NA
❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility Fail to notify the Regional Office of emergency situations as required by the
❑ Yes
❑ No
❑ NA
❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
❑ No
❑ NA
❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
❑ No
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
❑ No
❑ NA
❑ NE
i
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: < /711)
Date: /C) /6
511212020
FACILITY#: ,�—,/4( FARM NAME: G N LEVEL
PERMIT
- DUE EVERY 5 YEARS
- EXPERIATION DATE NUMBER OF ANIMALS
CURRENT NUMBER OF ANIMAL
- OIC CARD YES OR NO
WASTE UTILIZATION PLAN (WUP) (u20)
SOIL TYPES
CROP TYPES
- ODOR CONTROL CHECKLIST
R NO
- Irrigation Plan Maps E OR N
WASTE REPORT p2i)
-GOOD FOR 60 DAYS BEFORE OR AFTER
(f!/v (f F
DATE
/�'J/l/a-�
�f/
NITROGEN LEVEL
1
DATE
NITROGEN LEVEL
f!/ /
DATE `7/(, l -
NITROGEN LEVEL
--
SOIL REPORT (#21)
- EVERY 3 YEARS:
- P-1 (NO MORE THEN 400)
DATE
- PH (N.t if4or less)
- Cu1ZN (NO MORE THEN 3000) CU ZN
(IF PEANUTS NO MORE THEN 300)
IRR2(u21)
Not over PAN CROP TYPES
FLOW RATES
Not over PAN CROP TYPES
FLOW RATES
NITROGEN (N)
NITROGEN (N)
Not over PAN CROP TYPES _
FLOW RATES NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES - NITROGEN (N)
CALBRIATION weal
EACH REEL SHOULD BE CALIB ATI�D EVERY OTHER YEAR
- DATE OF CALIBRATION Ale
- FLOW RATES Q �,Q �CP.C.D �'-d c-
RAIN FALL (*21)
-INITIAL AFTER 1" RAIN EVENT
-LOOK FOR ANY LEVEL THAT IS LESS THEN THE DESIGNED FREEBORED POA NEEDED.
f-DUE��VE�YYEAR: DATE
o` /� / > �)_ SLUDGE wet a 25)
G` 0:P: 3-%RATIO OF SLUDGE 5_6 n C/il O: C U P: o2.0 %RATIO OF SLUDGE i is 20019
O: P: % RATIO OF SLUDGE
O: P: % RATIO OF SLUDGE -
OTHER FORMS (422 AND#21)
RAIN BREAKER FORM_�_CROP YEILDS t ` MORTALITY
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT
CROPS NO PONDING REELS_ FEED BINS LAGOON GARBAGE
Bermuda grass: Opens March 1n-Ends September30th
Small Grain Over seed: Opens October 1 rt- Ends March 31 n
Corn: Opens February 15t - Ends .tune 30*
Cotton: Opens March 15th- Ends August 1�
Rye: Opens September 1�-Ends March 31st
Oats: Opens September i-t- Ends April 15th
Wheat: Opens September 1st- Ends April 30th
Soybeans: Opens April 1st- Ends September 15th
Fescue: Opens August 1st- Ends July 31 st
Sorghum Hay: Opens March 15N - Ends August 31 st