THIRD ANNUAL MONITORING REPORT
CARDINAL GAS PIPELINE AT THE
PROVIDING
TRIBUTARY TO HAW RIVER
ENVIRONMENTAL
SERVICES TO STREAM STABILIZATION AND BUFFER RESTORATION
LANDOWNERS, WAYNICK ROAD
DEVELOPERS ROCKINGHAM COUNTY, NORTH CAROLINA
AND INDUSTRY [-j vC� A �I L
- 020_00087
`JDWyR#• 20191702
October 2023
American Land Concepts, Inc. (ALC) has completed the third annual monitoring
for the Stream Stabilization at the above referenced property. Approximately 245 linear
feet of the tributary to Haw River was stabilized to protect the integrity of the pipeline. In
addition, restoration was completed to mitigate for temporary impacts to the Jordan Lake
Riparian Buffer.
Stream and buffer restoration was completed in late 2020. The stream
stabilization consisted of the construction of grade control structures and bank armoring.
Jordan Lake Riparian Buffer restoration consisted of seeding and tree/shrub plantings.
ALC, inspected the stream stabilization and buffer restoration the Cardinal
Pipelines at the Tributary to Haw River numerous times since the completion of the
stream stabilization. No deterioration was noted during the site inspections. The grade
controlling structures are functioning as designed and the structures are stable. The
riparian buffer restoration plantings are thriving and the planted material have a greater
than 85% survival rate.
238 B MAIN STREET
REISTERSTOWN MARYLAND 21136
PHONE 410/526-2688
FAX 410/526-2970
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2023
Photo 1: View downstream at photostation 1. Photograph was taken on
August 10, 2023.
Photo 2: View upstream at photostation 2. Photograph was taken on
August 10, 2023.
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2023
Photo 3: View of drop structures from photostation 3. Drop structures are
stable and no deterioration was evident during site visits. Photograph was
taken on August 10, 2023.
Photo 4: View of buffer restoration from photostation 3. Photograph
was taken on August 10, 2023.
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2023
Photo 5: View of buffer restoration looking south at photostation 4.
Photograph was taken on August 10, 2023.
Photo 6: View of buffer restoration at photostation 4. Photograph was
taken on August 10, 2023.
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2023
Photo 7: View of drop structures looking upstream at photostation 5.
Photograph was taken on August 10, 2023.
AMERICAN LAND CONCEPTS
238 B MAIN STREET
r REISTERSTOWN, MARYLAND 21136
- PHONE: (410)-526-2688
north
Scale V'=50'
ROW
\\ \\ \ \ \ 1 1'1t'*'v'*' \\ \\ \\ \\ \ \ \\
\ \ \\
n \ \
It
/ ! / ( (III { { I ► \ \\ \ \ i ` �.
\` Outside of ROW`
\N
IN
Waynick Road Areas temporarily and
Stream and Riparian Buffer Monitoring : permanently seeded
post construction
Exhibit
Area planted with
Cardinal Gas Pipeline
woody vegetation post
+ construction
at the Tributary to Haw River
SAW-2020-00087
+
DWR# 20191702
Rockingham County, North Carolina
October 2021
Prepared For:
Cardinal Operating Company, LLC
4300 NC llWY 65
Reidsville. North Carolina 27320