Loading...
HomeMy WebLinkAbout4677 - Mayes Meadow - Conservation Easement Cost Alternatives Table200 South Tryon Street, Suite 1500 Charlotte, NC 28202 Office: 704-376-1555 Bolton-Menk.com Table 1: Cost Alternatives Analysis General Alternative #1 Sewer1 Sewer2 Sewer3 Greenway1 Greenway2 *Greenway3 Greenway4 *Greenway5 *Sewer4 CE Adjustment N/A 0 0 0 0 0.69 0.27 0.55 0.19 0.61 Stream Credits N/A 45 15 0 60 120 30 60 30 60 Wetland Credits N/A 0.11 0 0 0.02 0.41 0 0.55 0 0.28 Length of Land Disturbance N/A 3200 LF 900 LF 2800 LF 3000 LF 1,000 LF 400 LF 800 LF 1300 LF 609 LF **Des/Con Cost N/A $ 640,000 $ 56,700 $ 176,400 $189,000 $ 331,439 $ 132,576 $ 265,152 $ 430,871 $ 38,367 ***City Approval No No No No N/A N/A N/A N/A N/A Yes ***Town Approval No N/A N/A N/A Yes No Yes No Yes N/A Total Cost N/A $ (1,470,000) $ (886,700) $ (1,006,400) $ (189,000) $ (331,439) $ (132,576) $ (265,152) $ (430,871) $ (38,367) ****Land Valuation $ 509,000 $ 509,000 $ 509,000 $ 509,000 $ 509,000 $ 509,000 $ 6,300,000 $ 509,000 $ 6,300,000 $ 6,300,000 Lost Land Value $(5,791,000) $ (5,791,000) $ (5,791,000) $ (5,791,000) $(5,791,000) $ - $ (5,791,000) $ - $ - Overall Cost $(5,791,000) $ (7,261,000) $ (6,677,700) $ (6,797,400) $ (189,000) $(6,122,439) $ (132,576) $ (6,056,152) $ (430,871) $ (38,367) Available Option No No No No Yes No Yes No Yes Yes *Preferred Alternatives ** Estimates for sewer and greenway trail are based on average cost per linear foot for install *** Represents whether the option will be approved by the Town of Corneilus and/or City of Charlotte ****Land value is a comparison of the tax value for the property (higher value) vs the farm value (if land cant be developed) Alternative #2 Alternative #3 PLANNING | LANDSCAPE ARCHITECTURE | CIVIL ENGINEERING | URBAN DESIGN 200 South Tryon Street, Suite 1500 Charlotte, NC 28202 Office: 704-376-1555 Bolton-Menk.com