Loading...
HomeMy WebLinkAbout[External] Notice of Conservation Easement Modification Request/ WLS Upper Rocky Mitigation Bank/ SAW-2015-01816 / Mecklenburg CountyCAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning IRT, Our office received the attached WLS Upper Rocky Mitigation Bank (SAW-2015-01816) Conservation Easement Modification request on October 4, 2023. The request proposes to modify the Upper Rocky conservation easement to accommodate the proposed Mayes Meadows development. The submittal package was prepared by Bayard (developer) in coordination with WLS and Unique Places to Save (UP2S). The submittal includes an Executive Summary, Modification Request (including alternatives analysis), Cost Alternatives Table, and Exhibits. WLS worked closely with Bayard and UP2S to minimize impacts to the conservation easement. The proposed modification includes relocating easement breaks and the addition of approximately 1.288-acres of easement, including 597 LF of stream and 0.49 ac of wetlands, which will not generate compensatory mitigation credits. The proposed modification will be reviewed using the streamlined review process, as outlined in Section 332.8(g)(2) of the 2008 Mitigation Rule, which requires an IRT review period of 30 calendar days from the date of this email notification. Please provide any comments by 5 PM on the 30-day comment deadline shown below. Comments provided after the 30-day comment deadline may not be considered. Please note, if a site visit is requested by the IRT, comments will be due 15-days following the visit. At the conclusion of this comment period, a copy of all comments will be provided to the Sponsor and the NCIRT along with the District Engineer's intent to approve or disapprove this Conservation Easement Modification. This notification will be followed by a 15-day Dispute Resolution Period. An easement approval notification will be provided at the conclusion of the dispute resolution period. **The IRT has a closed IRT Meeting scheduled for October, 23, 2023. Please let me know if you would like to discuss this proposal at that time. 30 Day Comment Start: October 11, 2023 30 Day Comment Deadline: November 10, 2023 60 Day DE Decision: December 11, 2023 IRT Dispute Resolution Period End: December 26, 2023 WLS Contact: Daniel Ingram daniel@waterlandsolutions.com <mailto:daniel@waterlandsolutions.com> (919) 622-3845 Please provide comments on the proposed easement modification to: USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> , (828)-933-8032 USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887 Thank you for your participation. Please reach out with any questions. Regards, Kim Kim Isenhour Mitigation Project Manager US Army Corps of Engineers I Wilmington District I Regulatory Division 3331 Heritage Trade Dr., Suite 105 I Wake Forest, NC 27587 I 919.946.5107 30 Day Comment Deadline: November 10, 2023 60 Day DE Decision: December 11, 2023 IRT Dispute Resolution Period End: December 26, 2023 WLS Contact: Daniel Ingram daniel@waterlandsolutions.com (919) 622-3845 Please provide comments on the proposed easement modification to: USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil, (828)-933-8032 USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil, (919) 930-1887 Thank you for your participation. Please reach out with any questions. Regards, Kim Kim Isenhour Mitigation Project Manager US Army Corps of Engineers I Wilmington District I Regulatory Division 3331 Heritage Trade Dr., Suite 105 I Wake Forest, NC 27587 I 919.946.5107 2