HomeMy WebLinkAbout740019_Monitoring (Report)_20231011Division of Water Resources
Facility Number i - 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: • Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit:-` Arrival Time: c Departure Time: s, County: Region:
Farm Name: ` (\Urr C l� cl r ✓�J Owner Email:
, � o
Owner Name: )A iD G v Phone:
Mailing Address: �U (151 1 -S � f 0 eJ 5 �j Lec'-00 I I,f_ AY,
Physical Address:
Facility Contact: t rnfJ+ Title:
Onsite Representative: � r '_ �AA
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Latitude:
Phone:
Integrator: srn )\T) a
Certification Number:
Certification Number:
Design Current Design Current
`apaeity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
Design Current
Dry Poultry Capacity Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
❑ Yes
�No
❑ NA
❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
❑ Yes
❑ No
❑ NA
❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No
❑ NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
❑ o
❑ NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ YesVN
❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes❑
NA
❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: - Date of inspection: joA
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
No ❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
VNo ❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
2No ❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environment I threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes o ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? [:]Yes [ No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require [:]Yes dNo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
[:]Yes No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes dNo
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes o
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes o
rN
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes ❑�lo
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes o
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: iq- 11q 7 1 Date of inspection: - -
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
C� 1V ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge
levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
o ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
TNo❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
[�/No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
E No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes [;KNo ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes E N/ o ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E�Xo ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes 5X10 ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
-Zo
11 -z 3 2. 22
�,bSPf1
ey
;n r�
C""'p b��
Reviewer/Inspector Name: I ' VC lkc- -
I g 'ck
t LT
Z
I , )\ �,� d
III
DSD I? �oa3`�
Phone:
Reviewer/Inspector Signature:
Page 3 of 3
Date: I ->—1 1 - 2,5
511212020