Good morning Andrea,
There was a small discrepancy of found between the credit release letter and the credit release schedule previously distributed. Please see the attached amended letter reducing the released
amount by 3 SMU’s to 666.690. The credit release schedule previously sent and RIBITS reflect the correct release amount.
Please let us know if you have any questions.
Regards,
Steve Kichefski
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828)-271-7980 Ext. 4234
(828)-933-8032 cell
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey
located at our website at https://regulatory.ops.usace.army.mil/customer-service-survey/ <https://regulatory.ops.usace.army.mil/customer-service-survey/> to complete the survey online.
From: Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>
Sent: Thursday, September 28, 2023 1:02 PM
To: Andrea Eckardt <aeckardt@wildlandseng.com>; Eric Neuhaus <eneuhaus@wildlandseng.com>; Kirsten Gimbert <kgimbert@wildlandseng.com>
Cc: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY
CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron <byron_hamstead@fws.go
v>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>;
Dave McHenry <david.mchenry@ncwildlife.org>
Subject: Notice of As-Built Credit Release / Wildlands Catawba 01 UMB - Double Rock / SAW-2020-01532 / Alexander County
Good afternoon Andrea,
The 15-Day As-Built/MY0 review for the Double Rock Mitigation Site (SAW-2020-01532) ended August 31, 2023. This credit release followed the review process outlined in Section 332.8(o)(9)
of the 2008 Mitigation Rule. We have reviewed the baseline monitoring report and as-built plans you submitted on July 28, 2023, and a site meeting was conducted on August 16, 2023.
Based on the review and site meeting, we determined that the requested credit can be release in full. Attached to the credit release letter are the site meeting minutes and IRT comment
memo. Please make sure that IRT comments and site meeting action items are addressed and included in the MY1 annual report.
Please let us know if you have any questions.
Thanks,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
From: Davis, Erin B CIV USARMY CESAW (USA)
Sent: Wednesday, August 2, 2023 12:48 PM
To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil <mailto:Todd.J.Tugwell@usace.army.mil> >; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil
<mailto:Steven.L.Kichefski@usace.army.mil> >; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil <mailto:Kimberly.T.Isenhour@usace.army.mil> >; Haywood,
Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil <mailto:Casey.M.Haywood@usace.army.mil> >; Bowers, Todd <bowers.todd@epa.gov <mailto:bowers.todd@epa.gov> >; Hamstead,
Byron <byron_hamstead@fws.gov <mailto:byron_hamstead@fws.gov> >; Polizzi, Maria <maria.polizzi@deq.nc.gov <mailto:maria.polizzi@deq.nc.gov> >; Haupt, Mac <mac.haupt@deq.nc.gov <mailto:mac.haupt@deq.
nc.gov> >; Merritt, Katie <katie.merritt@deq.nc.gov <mailto:katie.merritt@deq.nc.gov> >; Wilson, Travis W. <travis.wilson@ncwildlife.org <mailto:travis.wilson@ncwildlife.org> >; Munzer,
Olivia <olivia.munzer@ncwildlife.org <mailto:olivia.munzer@ncwildlife.org> >; Dave McHenry <david.mchenry@ncwildlife.org <mailto:david.mchenry@ncwildlife.org> >
Cc: Kirsten Gimbert <kgimbert@wildlandseng.com <mailto:kgimbert@wildlandseng.com> >; Eric Neuhaus <eneuhaus@wildlandseng.com <mailto:eneuhaus@wildlandseng.com> >; Andrea Eckardt <aeckardt@wildlandsen
g.com <mailto:aeckardt@wildlandseng.com> >
Subject: Notice of As-Built Review / Wildlands Catawba 01 UMB - Double Rock / SAW-2020-01532 / Alexander County
Good afternoon IRT,
The below referenced FINAL As-Built Report review and associated MY0 Credit Release has been requested by the bank sponsor. The As-Built Report and associated documents have been posted
to the RIBITS site for this bank and are now available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist identified below
if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the credit release approval process, which requires an IRT review period
with a comment deadline of 15 calendar days after the date of this email notification or from the date of a site visit, should it be required. Comments provided after the comment deadline
(shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to the sponsor and the NCIRT along with District Engineer's
approval or disapproval of the credit release.
15-Day Comment Start Date: August 3, 2023
15-Day Comment Deadline: August 31, 2023 (15 days following field review)
45-Day Credit Release Approval Deadline: September 30, 2023 (45 days following field review)
Field Review Date: Wednesday, August 16, 2023 at 9:30am
Meeting Location: 35.864580, -81.095985
Park by old barn (egg house). From Stikeleather Rd you will drive down landowner’s driveway, once you pass house on right you will cross over cattle guard and then follow existing dirt
road to right and park by old barn on left.
Attached are georeferenced site overview CCPV map.
Project Information:
Project: Wildlands Catawba 01 – Double Rock Mitigation Project
Sponsor: Wildlands Holdings VI, LLC
Sponsor POC: Kirsten Gimbert, kgimbert@wildlandseng.com <mailto:kgimbert@wildlandseng.com> , (704) 941-9093
Action ID: SAW-2020-01532
County: Alexander
Location: 35.863028, -81.101083
HUC: 03050101
USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil <mailto:Steven.L.Kichefski@usace.army.mil> , (828)-933-8032
USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil <mailto:Erin.B.Davis@usace.army.mil> , (919) 930-1887
Mitigation Plan Projected Credits
As-Built Credits
Mitigation Plan Projected Lengths
As-Built Lengths
4556.100 SMUs (warm)
4556.100 SMUs (warm)
5,922 ft
5,931 ft
Note: No credit changes noted from Final Mitigation Plan to As-Built
Requested Credit Release: As-built/MY0
15% of the total stream restoration credits: 666.690 Warm Water Stream Credits
RIBITS Cyber Repository Link: https://ribits.ops.usace.army.mil/ords/f?p=107:278:33628202683028:::RP,278:P278_BANK_ID:5788 <https://ribits.ops.usace.army.mil/ords/f?p=107:278:33628202683028:::RP,278:
P278_BANK_ID:5788>
Please note that you must be logged in to access documents in the cyber repository.
Please reach out if you have questions.
Thank you,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
굞ᕘ莮諕丠쇄ᰐ⊈䍻ژᤂ擤�鲄舓魯葁쿧빳鳯緯�ᷧ⳨蹉飳痭欬耐ሢ辳㥻든⩖읎멢ꞻ蓼䰞鴻晉Ნ읤箰∵㸂꜔ꏎ놏䴁豱캽ꀅܨ㚅끘嬥阨레䆜죞쮽捼쉡匚黤ᥫ妕ƃꊧ硎�埏㩃갟⣤ᙗ笤䵙乒탤ⶡ䲉⿎譎휏ُ䬊⥷虩歼乃➄鮝꼸껎玅承ꪩ읯緑鑮琩靤蝄གྷᗺ䶎凚핸膛躠耱刣㫉뭈桐鎿✗㦗뮧몲϶累⡄㶓稰䒑寐졃摗貼搸ᰝ캅輅�⿕䢓뷷꩜魈厔ႜテ⇁崈ᦇ苷ꢭ舤퓶✰쥕树嬾떞搈መ慠叛綣ࣈ㊒⫼䛾簇녮ꖰ⢢㬷囫鷶싼ꚪ敞ȳ
旅疾那䄩趱냽ԗ䶅㿅ꖯϋ捤읶ﰝ温푿罪뇃'뵧竤伩穱꼉缦挅ƌ䔎��뾫�哛圵崨韃ꪋ쨫뱞卺죕ᩖ縥癝ᅓ樿㯖裑䞖ॲ㮰歪亂픣婂㭷䷘顷盝톾뵥揰믡즨㱱鰘趾챻銙뚦❇䲷캶悧㙨�ᅃ㺵᥇オ女풫⬹ꥱ誽퇎䮒礀섒ﳶ䰝韘䵡⼣㢱翃뤃迕栚᷼䬚㟑㖪㐣輆�⊄Ꝓ볯ᛉ汼旔ﭻ涷䒝円ⱗ稁誛轾珱쒵斡俕煿⽔萗繴䏂䌸鿇蓒�ԃᤍ⮉谼ᷖ덫ᇩꀣ紫敖踉ﹸ믁域듖뽖ᔾ䫡ꡄퟏ밧胬ⴄ炕곙�骚웚軖쇾⠡ဂ盠㣞㰜ೋ쎏걹渭
吙픆鳗쯹✢驛㙶탐ேꥩ컗滆璜짆㉡迷蹼캢Ŋ圈ᣂ⇆껿臨ዂ눎⠐֜獳婼䅾쏡곜�틼䆖袸唏�䓏嶞ꎬ坯햊錿쾈ꠓꎒ☒泮ꌽ㩊幡᪉䀭࢘ाᜲᛥ㙰閧翇湱�杤䴝츱ո㴹îⴽ愘乽劍ǧ㪪抟䖟䧲Бㆶ黠⚀㪯탖贋겛좲笚蘍扨敡衢䚏灠℆淿韭Ȿ⥴뗡Ὗ譗櫔ఀ꼑痩黆ಕ肋텑䌸�ﱽ鴑꭛诿녤㓥酗ꊇ⣌孿䈢ㇹ줋噩䥰鏜�㕍ᡃﭝݹ�쯋쯋砯ﳳﱑ踈㓁읠竽ડԅ㾏ᨤⷱ젠僻扳⮳⢝潛韧앛빖应㑩騭ਲ伅幂陓㫟偮낧
탸嵐䟭것ᣆ〮輤ꧥ瀕␎뚧去ᅇ䬕鴰ゾ砰ꁹꋿ繅㘫ິ⢖槧⋊ᘆ᧸黇⢵⊹ሚﺈÑ铬㐻ᡚ⸹빔猐恟테ꎂ耚㹽绖쀉럳홈䉮區鍍蒋梊註긏ᴱ늫肪뇮ꜩਚ継�ꂅ瑂⾣ᔯ婜死봈ﴝ�ᓰὂ䣬葭ဘ梎风뤗콷佊ᚊ釧⇁꿨쇒홑챝毯䨨�욹꿾䀅㨔ᤨ⾨㷸퀶Қԥ㔿⽠녟Ж麞궜玮ⵙᦘ껲樇莴쿝皓ヌᝓ퓒称붤哜萳峒Ⱆᙞᰔ�颎䖘꠳펈예놈댧뤎䃯븮큹黇遂跓뭤䛯ႉ钠四輦臧䧵屈鄝ᅢᵱ阠葈ᅲ䱣圚뗢꺃훙櫟ꇺ᩻㫪䘼䑓ᰓ쾼ҿ꣡ꊒ梽袣
猡왿䱶杧೦茆及䊉勂奁꫶ⓙ꾄찛岹ז㸪ȉ盬齖뤘耋횒䎜過ꀧ쳚咽�⠆ꨝ낸쏍㲞隱욎飩獍빝䳹脾끴⽶舂鮵퀐誅덳伫ꅮ賫꽿낹ッᚐ䳦틧鳺嘵⼣�ຶ稛덙箹ͮᣓ䜡̘㷐쥉뙧儇펵쒜몌븾ⱈ䪑戥쀑盧뷗㫎䣥똲褎홿ῃ譥ↀ⽮펭垛트眠슁Йー캆ᡑ藫ᓻ㘎㰾抷閞焞㑴咮峨鏜캶땅ꎟ磐얒❌�쬁蠺䅤챓ᎃ�襜ሆ壘┭᱿䑠ᘘ�榯瀽Ω慁苫⏴ꦭ栺촼乪剴望ﲾ믓ᨩ휝耄⦊蓩ੜ什呥䊀㮛㰧ᙑ듰驦ਭ탖Ⴒ挖ﲿ
ႌ捤醠팃ꁠ旮ፙ뤟芘㞢랗폛묔۰뾶㫡迺嶔ኔ揮顎䝀ꅇ擰༣냟垣㓟쯶큎ᅓ怛焿퀑阆䆡큏ናꭣ쎅廼ᐃ佰ꡊ帓屟ᰬ㠦飘ꘛ玢즊㎎렯բᭅ鲞柴鞪ᐮ쎋뜷ᰔꃝ푏ᰪ紪쉃遲�‐ĒḂ뮧ﲭ䩾�⌬餝눵祟ꪡ㑇㋪䉅蜾ﻝ⢶罩ꎈथा䌊ﰉ➑서쮷鄖㬾뽾鋏��䛐荅〢⭖ꕴ㮇火ᢧ窦ᨺ㡊梚䵬Ⴧल䀥炥獟驥屴墫镂₪矢ﴖ沵紎嘜䴐颶䷿鷼怪죸釳Ʋ˚骅ﲹ祪ᐯ嵐ꆄᑧ氌㌢庨沥䚝룕䴔帴킓9ꪮᄓ蠳ଟ蔇�輍숎�흉ꌅₜ犤꼉⌷�ಔ
쏭귫혻ꀴ⡜镡Ყ汜셁ㆍ桸蘄뉀穢㠟歹庼剿畡ꡞ솛➤ꔝ火Ἶ툲︢蟟뗬榰돦�螩낾ᩬ╖厙쿝鿽⫶萏�矢挖泆ꦆ䮱庶ᔥ∥岥穉슒췖⨥�詞鉞䬧��䡂䮥늋譊뻈春挬챦晦鯷㋅呦ﳯ�컹�㹳┹掣큏彴띚镃ﳬ�hᔷ원殎㡰콊렵疺䦀㤩跩�ʢ칇콉彿틟훞약⏘雛璄脁ᛠ䣮港揫린ℼᥱ穴獇앍곓䎨எ䡉䤥僸뫌㒃耖晳챱㢤䨗輡꙾喨ᕨꋷ垽Ꮺ얔蜕㕀彖息촀锲㘕ؔ�ဧ츘䅚贋鄽גﺼ싎븋㏆氳댽㻋⒱⬭驑ﮏ騬⽜hВ枣難㤑
繿牻苓칯耬같綌쏤啧쨦៣隬ꗧ儶䞹꣦ﳉꈔ嶄꾻瀠罽晻붨㣪࡙⎁蹝匵䕁찱몪闌齧☇ㄾ�ᕜ鏳䄕玤⫡ܮ嫊橳돻悴栙訹牤슃騱ຆǮ祩췥슽묱削贝䆧શК㺁䞟㘅↓�㦈씘㕽럌ꘈ闛㫬ῧ뇴˹꼾雺뚻ǔ깤ᷗ␜ꝗ宆囏䮃嶫帨滛屯÷ꡯ䛨ᔖ氈糦낏뜋㷯Ⱚ쿈仍㾍殳∽͐膤羚홿瑶勷标�欟龪쨼䭉넾荣ꚩ瀠�㊏�⫎膑ﷶ훒⸋簂샰傴애炡秥ཞ䄻慚庴泙괼쑜ꈏ뙬磮煒ݝ얍䠕ꇵ쁀틣⯪๒ሹ芥抇뛾☢銫靌偞胨⪥ꘑ嗰ଷ℘ꫬ
趜旳᧗샚괿ޜ௰ꞿ섰孜Ύ漒刑Ljꉳ몽䲸ꩧ潭鉕េ됐儷笟쌎٪鍟킼睉鼇�ፘ⌳춝엕$ᦁ貭꠪望䮄貮돰刷˻蝆挨鱍䱾妹쏜舆ᱸ꿩鶋䗶�풑䀎࿘첣詰ꭇ멮ꌾ葊䓳ጷ㌓僫絊蜟族踾冷⚗跜앩颟榣��嗋蚥ᐡ锜嫳Შ铹ì槻⍧嘔國涸烲뉳풵诀ĕꌌ땩⏚ﳴׯ啥�⢼Ⴚ穽훧乍뎶俆⡻罒翻䕁匮ஷ뭇▝Ჵ뭱姰⾍&⎁䝹ၼ㱉絪�槬ͧ娘拝绿탿쏞႕邎ަ�䞧奺웡깲혲ភᳵꄩ犸ۘ꼭墲雒ꊰ廖콠틠勚餎꜐ꜧ㜔털�♝̰Ϲ夕ம㧤㔠䡿ϫ
혴ꜰ킥䋓੩膩踷ꯍ胥ꐕ➖㖯陓鋦哯�㻆㲔뿹㮙杇癔肱ੲ厄잔ʳ甝ვဒ滺랑ሹ쒽ꔕ禇釙⠈臠铀ᡐ쌵�鏿啖㷗猊霁㻹賿ᶧ奞﮾�쯁茭ꀼ䩳ဴ㬊畢罭ॻ�祽狇赩₍ⳉ涫硯癷�☘ꮁԙ㷇⃝簅坺橩ꎴ↕輑쨒⠁ꔜᑦ圔㽚鋂ﺛ퍶ݏ蒪樧䴊譛交銐䋣ꚱ匶招郞낰킰ḃ뙎惘ⓚ쪢軸ꆁ뚍襇䃘츶⠡ֽ㟡芄氚Ę亏镾봙嫞嵟啕悕钒쀿꼅ﳩ礚▜惋興年샦賸㷭ش춓냡咘歲쥕㶅ꛮ熤ᆊ鼊颓쇛뒐ꌢ�哏ഐ厃駪磠剠Ở坷繅䗳摑喸㈧᳨昐陼柳ਞ룃Ƥ
�㨄꜠窐髊㏇艞摣厘뎛խ№摝�풦लᥒ迏ꈹ䔆헥DZᲸ몧ꢲڵ烊믩뭅쇣쇐�繐猟ࣴ僓႟ᐥ撁ெ렊笇纋돳儵麞喆໔橜디아❕씽ͷ鈕업쀿⥜믩䞿赋᠈襪摛鏖틊뮇咜㛇Ȣ继뜰⺑ᤀ叽⏅ཿ挛ȝ⸒�ﴄ⌃槲俆�䬬겵혝瑯듪㙰㸉✩퇀�ꡜ햑䖷剗መ냴퐴ퟗ뀷�偓㨣㐒ଽ鶱⭑쳡ȝ╎뺔톣퓩垺刏岃瀬ৈꌟ罂諣鄻蹎ꟼ岎㙪䡶ഓ꺇ꮪ㏶濿ᜨ쒒䗗朸阵忭�틅秿㠓㤶�焟╓犄鰾時릀魐ຒ⟌뵊쐓獤߂虹௺姷ݿ婃衮㪂
뚺씈㽒몹更ꇌ፥溮泥鈽묁ﶝ陛☐䋖⦖黺岻웜ⴗ鋦漐㰓빜៳뻙�泯⌷䲨㨰䍶䧔失䥢﮾㝽ꠛ鈖嚢ʑ뀕䔙䧙㻁멖⠸퍖쭦媹瀆�쥼젷鱯⁁⡐ؔঃ䋿ᐱ뎩嘣玄煦Ⲍஜ틯䵲�ᄩ쏓㨂�@ŝ鉻Ḳ냵dᗦ牟嘳葼ᙎ舔킸쉄볭橪쬪⿒즻͌夽ࠒ䫜咍呱䚔闟⦘㖸䕁샕✆ꢤ슺暓꿨垉憎螗՞┠ꔜᔭ뼇뱢Ꜯ鐒㰛嵑ᓌ䂈禘嚆莵憅ᛵᄣ⍊֏ꆁ鹰턿쿄軹拟ມ㗒烛䳠菖斧罥줼馿㉷�ᝁ鸳ꅞ⌘쒫㕻먔絃㖭ጷ硏⼹툶懁偔䅯
ꄮ坞媈㛋藸Ꙅ礿䳕椝Ĵ㮟倸ᶑ櫭ጵꜩ彎Ŭ漉₩寎>䫋態푇댌拾鰢鱗臽銀䔾둠⳦媶圴㔕ᇁﹺꐍḎ쯃ꯜ畯ᘻ䱟˦랙㼽횱鯓ၨ즱ø骆ᯥ숯稥컂䫳�촒懤惎띧댳敮粿샛Ȝ쾷쭕Юꊦ끡懔쁃폁焱ᅿ僱润鳘馇츱솃版嬨鲟鏪ễꈪ䯵䨧โ紝ⶥ璕浒嚾쩾뭖傶ᳺዒꩭ锭ⱎ蔹횜왈惙飌瞙ퟞ�ᑡ䌳嵍㽿ﯷ쿜�痗睟觴跰䷳蠵縓蔓琳伈讦ࠇꁿ雤릫蒼賡益ꑞ起勪£꙼暻Ո싢뼽獷⹆㟣鉵䈜⫹圮㓘쏐㦘扪ᄶ쪤㖂醼肪㿀ꍏ婖ᄩ蟥螸所瑕Ꙏꌃ
䡩㋴ਛዂ겴磿⨢�쭞졐ྨ᯾䌂峖⡽痣㠋財回]퓽▦㨶檚쨪鉤蟂쎁慀짤咪謓鄭濗挿෴㌈睤붾ꡡ閁촕㛥ᕅꍭ㟄勺⨇婨ᗅ꿀ઌ酐幺착ﯲ嗩�Ί봂륍즙넖瀄ᖧ풵욚㹻⠞쌅壀켡婇칎㥳픂䣫ୁ둇⃤퇐�⼅ꗀ䣧價꛰ఎ죁导坧ݧ洛둥及禍읚峸⣏ͫҬ쮞ᷛŴꬋ㼵빁芓ᅠ鹼栜㬮䲰ႊ鷵횿謌嶓쑌余ꊤ触ꅌపⰂ空竴֧⩚ꉸ놊䁋⍱汯˙玫ᵃ觟Ț욉唒嚩㱸謎䵁鐲쪑깦叇릺솂耱ꀂ麃醟汰껿㼠杏ⴻ渲௸㐨ଆ蜃昵磚Ḅ躊ꯋ
鍨㲵衊㒴驔轸㓼�㶖檒說ꐍ␎迂哤滅镕鈨�߸ﲵ☱ᤌ⸗讧⌁媳ຓ棛뽉糯븵䬏䮀㧜깮盧љ把㮾겣䁷�灁❺꽙ﻯ酷︾スⴷ䘠ۺ麃θ轇鑡涍麶⫉꼪饽ᢗꧪ줢쮶阑彞쿦⊟䧟뎯ᇘכ鶷찪牅번꛲엓㠬痬¦䜂燚嶹曈히䑦竰ᬇ맓⯖鵶欚Ľ₧�啊蠘鏂쥵䐒幙竗味❵ማשּׂ蜠헺颸蟓澷ぴ鸷꾥꒩ꪤ䞭톣畴谍䶌ⴖ觳䦈ﶽꚰ䱣‣ﺃ㔴Ҝ︭�┇숷�㙓鸕촫ﱰꧭ藰厕㧡㼒헸ᩏ뢄⭂䄅➅跽㾕嫲❮蓒疺忴᳢般獈즏�ᠣ
ಜ칼꒳㍠谍딌䏺㌚ږ䲝뽊摿⎽扁鄋╖辄띠藅굾쬬ࣼ�婣퉡銮灃⮊�蛫氳࿋龱ȴ瓩溴鳔Ƀ賳厸뜇೬졋졺ꤗ뜖拌밃⁈茆䥆ᘨ党�䌕듄㼍쁄怟ㅷ嗨迅眢篻낯涟Z圻㜷朷✧ཷ⦅裀ᯘ햅絝鹬و⼠㸷鯰㣙ٱ뱡긲澾실鋮⧈峰烙쩉愫鑣泆�쮷젡뗔翻榭伟冈ѱ串캷�▐䵹脙邁ⷧ愙땳鷅쩆匿ᙄ荁肓雕�뙁㵚ခ谨놊垭黠纭献씵o遡긼⏾㹬螨�坓暦뢊䝢⣿࿏셉ᑳ칮磊ﰆ妛잕䶝寄ᦚꋋ唟쀍ᄆ砂ᶽ蚌튚ꫲ亖棦䆧蜐뎞߳ꢪ䇝䌌⹂㐈楎鋆靃�聹쑀䆺呃
෧妰㛌썆슫꯸有斯杤ꕥ釿オ诱슂웚㺎弶踀稭퀐쳲腳ઞ牁㺍쨊㭖အ렄틬淌탌몙霥礈ᙞ꿭蔼ᐅꞍⱙ甾ꂥ螹蠏䉎Ј汸텆삽뙕╔␇ᒽ볲洵⦗⑱꙾�Ꞹ붭郀Ὓ栠ḻ꿇喴织槖ాȄ䂣梦凫咵刉ꘈڵ飡㬃䎪摜ꙫ뙈愺ໟ営娟㤮褄ﻒ먶丑ꁱ쳾릊駢撡琞霥ᗉ뢝鼠ọ≧ꁁ諂蓹볩鹕⚶䇴来ܟ䢜⇢묁궷ꂮ㒢浵䵭⺶⽦砏忘投⊡띻漧鷪ŝ룰�箌禿凌㪓抐㪶咵꣒卍맡䈜抁뗀窢謦Ū꾯릳�驗侸쾲ݎ茤⤭ュաퟍᦶ䮩 ﱪ㞰貱㯞߀燁խ顰闭펚邾
餳ᐂ巗쎣ᐮ흢秧∯鏿䍬㌯쫡娋꒫牲昊䨻藻鯺즴⌎䔶䤤썿쪱﹎婸ᎍ쇢境ᩗ婩䇕땢苍�갬轥圢職㐰�ΟÃ�鼨棠罋펹�란骙擴媥旺썗닙⏲꙽弡횉田㼊実⭜ﴘ၏冋綘쐥諍ﮀ౯馤꧁炥聁珲㒞कࠁ요쓈㙎ꑗ₭댞퇶옵쿄�Ƨ科翎拳궝娒힖ᚑ庅蛮⨰먎ፈ㞄㦛㴲ᷔデꬂ덤봦箢ቂᒎ聨羞쀪᥌괷‧붊뚂셾宄მ䇓顰⃟俷벁閷ច㧶㾑罃햠צ摅䣞Ⴛ疱▱䅅壪쇔㌉蓯⚭浏䎡ठ⛪㛋ﱄꕲꊤ궾떣�僞㝱ᬿ麾趭絁晁츨金劣뜨
뗜ዉဂ興톦齲霣�겸ꚲꎥ�僝鹓⭻嫀㔋⚳䏒㏑챩㞷濱�盺鹑霷䦇珅醜�眥ᄂ⻨栐苪伳战�籛딻桔躼ꏦ땩ﲝ䞉Ⓔﴀ缥�犱铞脴㢊摶ꫛ㒅�殥琓Ư롎䛫⮈ꩩ袲⧂嬙汹逿몤㗮ꦽF⃡㍻⊊ܥꊠ黑᪬懸拓ꈔჄ踔だ祿�짌ꢭ퍿湅汶㻤婹䄩鍚썐夝ꄞ뫾�੶ᔲ䔧⏇沩죞ﱵ銦쯽ত촬膬핶ﶥ䕔ᅉׄㄷᨧႶ⫀㷋올ප�鬜榦暦ꦦ璔㩮꒪琨ⱒ長℥洹⸹ਛ雉钐䩵鬭쫋ꋆ鄐㘘붇╄䮝ຓ㩪᳘蛻❹뽡畺䚠羿﹦�맧㷹緷
忯虨볽ဩ줔�諓榫▧忻韯ࢷ⿏鼟䵯綂횹쾎툌ኚ뀕꛳༤脋뗂㷜ⴖ夽ĝĝ恊䌍呯褃ά鉶⥪ಃ뼔롃躜胂⮕鴂䣌波荆⹍䣣ꫮ嗢䳣�䓡菏ꗗ㚯�恷Ⴂ蹪ԩ坤뇼籫赿翖䷤䒗铤籶湒쉅婎闙햤娮菲孮堐䍋퉣嘔팴㳙뼾앏ʅ鬞깨㺧캹ᝁሻ粎桟嵍ꥋ瘅罟嗐聭㚭䨄ⓔ둏櫢꾫㗼뀞慆咙믠Ⲏ⇖辀슅ፉꛌ묹瓍픵軂沈艀ﻹ⊷伖뒒떰쐢祓טּ祶断ᾧᴃ袸鍛斻頶㠨贈㷨撮彔횈ȯ渱쾺賑ي⏷蓝橼奄㖞㩶膘ꝕ䃞㠑높忶콢쵞핻惂ﮱł쎟
깨啿瞙遤ⓛ躰䍇뚁蛃憩�阁ไ喍ꯂ咐ᣱ裤̐�䭱쯰莓䤌揠အʔ鱎ꪋสᢍ�䒀왾೮ᴚ髈㭉ꖡ簰榫藚⭟隖嘸噱Π⢘娨㈽⎃鳱磛郭븮ࣟꉹ㓦죿䨴䍱➗쎆筪콖䛉露뢡↊㠰ꢚ污᧬紜┴錄꾥ᥛ⻬就믮祕忢ꬎ媙胺禒釤嶸嚛㭺ዩᄕ뼣࣌��륐ꉩ胼П䊁ちᬎᴡ踌㎼㗻ࡰ퐅ඔ핤觏䂆爲Ʋ鲉�䀷巖뜝㞒᤻銫ᑔ価ȃ鼳ⱻ�ल쿩紮९สᒩ酶椩砺餭Ȝ慇뼜ꣲꪠ䚺啌繹婶䱂聘馗愦Ⳉ쪃⪉暺縮䎫睂㲜꼨땥⨘歹奶鿱늪믜䤙薆徬
윳䋉⬏ష眯퇈�ࣲ鳰빛拁黠㒏竞⃞杕绖㵎딟哀衾欩㨂酎嚀鎕ᔔ�詯ḱၣ輦猻㤛콒뉛餎뮀⅊헐궉㎸䄻퐟Հፅ㨧濺輎趉辋㮏澰끧ꦿŎㄗ踔쑒向浔雝੮�ⁿ颠煱蝇⼆㎵勗⠡栰ᰔ쐶࿋먓�㜞蹉꜅鵴ಹ湹ﶴⵖࡰ콹ⶏ沷ÈՐ疗쯷Ⓔ订걄寣䧉㟇鬬捧㞪ᵞᲃꖺ涳кꯒ⊺傸諈㑣쒖侀䒝倃䎞栐ᴵ❫ཷ⽏潯켯鏶㢈Ȕ쀾댹閯᷄䈼┎ꆯ猸㳮⽏漀뫱幞猞ᵝ㑬さ脒쎀䵆ꞿᓫꓺᙅ✽䞘穑秪懑ടퟜ퇞鲂ゼ⧽䞣举겔턣綛쳧놰坐ూⓍḢ
㎆폣덟붤뜃╠逹臡魇ኘ፷褍抠炠ꔅ멱욆꘦䱢ඌ栦⇈펆蠱늂躆夾�豻韛㐓꠰剑�䶴꧲撺珊鲁⽹͐汙㥆ت꜡駊滼∩꼡�t揇Ҷ鷎㕦㴎䏨唊⃐蔇⪟ꔊ롯�붠㰋捊␊厞;里茘샂睭❡秠站瓜῞⧀㻤炌ꀢ뺎計㺪꿛텗舸턞簅ꌞ떣엲䖎屬휱棚㣂됕琜ୠ턠䴄ᬽ齷헯ᆾ쭈鬹໘츎ᡳ㞙姃䕑夌�鲭鰅乵훖䨩鎲彚倠珣ᆽ変뛴骆➊W詌㳡铙ᶈ흘섋ᢨ령אָ⨹꒷얁맫㩋ᵟ꾚̏䓵刈흩ؕ�ℍ辠ﹹ띿蒯謩뮞攄烗햤洦ꖝ�燡Δ
푑ᖟ䂞欩〾ࠔ챸𥳐֗羙袝餎漿欤ୋ鴣桱彄菏뀡鉸Ꚛ覞ꖹ閕趕鞝俿亇㵧ꏌꖳ峅뗜뱷嫈ऺ䘋ࡳ꜔雫졚ȓ랁ఓ䌈璉紘鹀匓集Ҝᥚ�Ⱛڏ璜卶�Ꞡ凒鈂녤㜓顚唇宽柄뙷ᐵ�摔齃膕ᛋ데퀷ሢ碉帼ख़䆇ꐣ㳭☔솏ৡ딄ᛱ꺎米夯뀚啼뻸貤䮿홞ձ`滋鲠料ʀ㮳䈨绛巍瀪灇꺛蟢旱ƌ쯐晳夳볲ᦠ鳰筞뿨츁ꎣ᠏筊힢쎶맙䅿ꟈ픷䏿컉熺塀辀鎳莣哽즻摖┝�咃㋐犲㚘�썫ꣶ쏸叇崯룉犢ᯪ傖ﯔﲁ벶귄塚魐⩃ܸ育噸䴎腰ౣ床㎞ў郋ủ
突樮﬩뙥胲톦॑ꨄ힀ﵳ풑ິꪓ㥳캌零ꛦ�ꦙ燉ޱ䓶�﨑窉Ⱂ�디キ覯⧗ஏ꤫딵践淍ᘌ➛귨邹⭇珺㞣ख獪�붢㨯붥݀ɲ硺읟漘켡忙ӂ⼼㈌ᶕ柏몬읟窕鱈퓱䶀퍻ᛯ㓕ぶ簹傁﨤酮쁐燧꽘讫㺟醼藒㏔䧉쉻硖㬹褻௶韝ㅰ쫭䩍畩歽即茧牼衧鑢㯟삸แ峜꼤锰�淕墾ﺹ욣Ⱈ鸽䒋䲫쵀ꍘ嬂곿䤚⫛眍䂃適᛭啕乲祾괃얃簑𤋮�昮筧괳ꏙ⥫⤩콧鲦亻幹응睠辰⟿ቌ栫봼巛氛ⷳ벯ퟪᘒ�䵅摘同፟ⲥ繮�癈㜼
綘翹ퟬ偹枓쀞⋦⃤䮄⨐咂吹䄐舔ᅠ뚭䁘ⶫょ兪媎䝭�浝�櫕嚅孪躱镭浱蹅䬊嘽輅嬊ሐ₠쒑䕰爋令鍰솼晶죛脲�㻼셿쯌齽ﯷ༾웍䡿䑷Ⲳ玬쒄䳠駶봗䏝େ濋鶅﨏뽥묛歮꣗ઔ璙懰읷㹝쾟Лޢν�癿�ꇼᄇ迡쑥녺癇齪褴糊쭹훩锾蓾놸툭넋閰Ӂ㟁묦腅饾攅㸯툷童췶兜拘볬热▦䶾멤澃폗燾뼸벨�戮ꕈꏽ絝꺘赹罚翐痊殆�뻷种툫竏蝤ﵶ홈國羿嶻ﮦ䀏榫帪쬵ⱱᅀ�륱锂쵡ᙧ♌㵣�쓸ഔ繷窿顋癅宮ɠ慂藚褭㕻鷹궜䠐쪓묍ࣩ㘺뤝꼋퓼
ⲙ죪䈇ຈ憞魫鵅嶩捩ᡠ슑齝觟鬮哘裦쮿볏ॹ薗됊텳쳭峭ꄇ筘ݺ蘄嬬몓ꆱ�烽偠풮껥崝䏰딚꾼羛퓳瞾뺸噎醤䍏顀팎滗䅤셑鱫姙憞賓랊⒊컆ᵯ듵俁䇧ᖉ╢勺�볚狀㜻걂峬ꎂ敖�뉿嫸鵕嶰棲ꅀꍜ鐘ꨈ㺿삐꛵⊍㭔䤫꽉骭䛥ᥥ㐟풻垽큺闎徕燸迾⸳뤨펪맘犠糣얆傿褈杌뫚䶌쭌뫜甕蚼ʻ띑퉄匯㖪讦툟㕪贚⥚㳵ꭨ皹ꏢ䭭鴂噙⣈Ⱎ슉㣠煍ꑶⱓ啾߆旓㇇맚瞚�㼍⢧헿ɥ塀皆뷕ਙꎝ갨Ⲅⅺ㤺꿽龟ﴬ࿗⩗�꾩ᄏ䁠傦䶪贚
ꅒඐ䫴嫚漚缔掽狣✯㈊㧚ሐ䪍촞ȷʌ淋짷ᥖ荚滺䫩Ꮦ趙⯟ⵅ㯆薷ﱛﶹȉ₂ꉄ殍籀雊澭�㮹달慪ꤣ�⅜뙴嘵�醝볰鴋켈艴뭠㸘櫝⪻抢鄽磙罆돷�ꉟ๎걑匹箧췺ⱆ덙콾俁鲏뤨군䖮彸�퇑�櫮謗쉅⛖藞׳纎⑾탷瞾汷妈쇭⚲⏁⢝폘鰎僫啶럝깑㧸㾷暹뷇綂㠫勰㻾숂㭠离贮䱍�ﶓ쥅퓿꾯㟣㔴훔�벮穘菨ᮝ剓鎒帒嶍䋾㎐㒓쀺�惣烡쫧볊䜠혒餓쳍쌕χ皕類兓얄긧�麔麞馑曵䷦潩屬㚷�ঃ佥褐峽皌醮纗ꇀ
禆霉ඝ蠍ꁳᇳㄠ㵜犇⊋∢∣맂냜郐Ź稸ⰳ쬐뷭腼흡创緶閵龎糭偒跒╶秚ﹴѴ䲄妥凓㴌促㓖餚輈≯㡣콯ᡫᰴꗛﯝ㕩厃╪됪䟳ݭ웖့➝悿ᠽ씰岰횦䒈伋만濊딗㽝懻මึ洖洨ᮕ뼻ﻷ嬲啸币䐡蔲䑊∂柙슱⮊辗䷯燵뼜웉摞饚�꽹འ诰敄ᱱ摨圓預빎濱ﳬ鿳싢⺦炜㊢퀫篎ꅚ聳ᑣ鮆暛ᗪ팧Ꝭ콹ࠍ㚘䆙嗂ℊ휩闛缏潾琩瀎쪋᚜钲㝃諵軫瓶윖雖蕮첯蠟릯㈬뱝褕捪擯셍౺䱌록囷↿浳楽ꁲ迉ᤓꉂ頱∔揖쉠셭啇栃뗧⭅걽麰耇
䊱䡀㉤饢�邔鿜鶌拝㈏
CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA)
<Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA)
<Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron
<byron_hamstead@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>;
Munzer, Olivia <olivia.munzer@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Dave McHenry
<david.mchenry@ncwildlife.org>
Subject: Notice of As-Built Credit Release / Wildlands Catawba 01 UMB - Double Rock / SAW-2020-01532 / Alexander
County
Good afternoon Andrea,
The 15-Day As-Built/MY0 review for the Double Rock Mitigation Site (SAW-2020-01532) ended August 31, 2023. This
credit release followed the review process outlined in Section 332.8(o)(9) of the 2008 Mitigation Rule. We have
reviewed the baseline monitoring report and as-built plans you submitted on July 28, 2023, and a site meeting was
conducted on August 16, 2023. Based on the review and site meeting, we determined that the requested credit can be
release in full. Attached to the credit release letter are the site meeting minutes and IRT comment memo. Please make
sure that IRT comments and site meeting action items are addressed and included in the MY1 annual report.
Please let us know if you have any questions.
Thanks,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
From: Davis, Erin B CIV USARMY CESAW (USA)
Sent: Wednesday, August 2, 2023 12:48 PM
To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY
CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA)
<Kimberly.T.Isenhour@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA)
<Casey.M.Haywood@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; Hamstead, Byron
<byron_hamstead@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Haupt, Mac <mac.haupt@deq.nc.gov>;
Merritt, Katie <katie.merritt@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia
<olivia.munzer@ncwildlife.org>; Dave McHenry <david.mchenry@ncwildlife.org>
Cc: Kirsten Gimbert <kgimbert@wildlandseng.com>; Eric Neuhaus <eneuhaus@wildlandseng.com>; Andrea Eckardt
<aeckardt@wildlandseng.com>
Subject: Notice of As-Built Review / Wildlands Catawba 01 UMB - Double Rock / SAW-2020-01532 / Alexander County
Good afternoon IRT,
The below referenced FINAL As-Built Report review and associated MY0 Credit Release has been requested by the bank
sponsor. The As-Built Report and associated documents have been posted to the RIBITS site for this bank and are now
available for download (see link to Cyber Repository below). Please contact the USACE Bank PM or Mitigation Specialist
identified below if you prefer to receive a hard copy. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review
follows the credit release approval process, which requires an IRT review period with a comment deadline of 15 calendar
days after the date of this email notification or from the date of a site visit, should it be required. Comments provided
after the comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy
of all comments will be provided to the sponsor and the NCIRT along with District Engineer's approval or disapproval of
the credit release.
2
15-Day Comment Start Date: August 3, 2023
15-Day Comment Deadline: August 31, 2023 (15 days following field review)
45-Day Credit Release Approval Deadline: September 30, 2023 (45 days following field review)
Field Review Date: Wednesday, August 16, 2023 at 9:30am
Meeting Location: 35.864580, -81.095985
Park by old barn (egg house). From Stikeleather Rd you will drive down landowner’s driveway, once you pass house on
right you will cross over cattle guard and then follow existing dirt road to right and park by old barn on left.
Attached are georeferenced site overview CCPV map.
Project Information:
Project: Wildlands Catawba 01 – Double Rock Mitigation Project
Sponsor: Wildlands Holdings VI, LLC
Sponsor POC: Kirsten Gimbert, kgimbert@wildlandseng.com, (704) 941-9093
Action ID: SAW-2020-01532
County: Alexander
Location: 35.863028, -81.101083
HUC: 03050101
USACE Bank PM: Steve Kichefski Steven.L.Kichefski@usace.army.mil, (828)-933-8032
USACE Bank Mit Specialist: Erin Davis, Erin.B.Davis@usace.army.mil, (919) 930-1887
Mitigation Plan Projected Credits As-Built Credits Mitigation Plan Projected Lengths As-Built Lengths
4556.100 SMUs (warm) 4556.100 SMUs (warm) 5,922 ft 5,931 ft
Note: No credit changes noted from Final Mitigation Plan to As-Built
Requested Credit Release: As-built/MY0
15% of the total stream restoration credits: 666.690 Warm Water Stream Credits
RIBITS Cyber Repository Link:
https://ribits.ops.usace.army.mil/ords/f?p=107:278:33628202683028:::RP,278:P278_BANK_ID:5788
Please note that you must be logged in to access documents in the cyber repository.
Please reach out if you have questions.
Thank you,
Erin
Erin B. Davis
Mitigation Specialist, Regulatory Division
U.S. Army Corps of Engineers, Wilmington District
(919) 930-1887 work cell
3