HomeMy WebLinkAboutNCC204080_Annual Fee NOD Letter (2023 Fee)_20231016 ROY COOPER
Govemor
ELIZABEIH S.BISER t�.
Secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Internn Director EnWonmental Quality
10/16/2023
Duke University Health System, Inc.
Attn: Monte Brown
DUMC 3701 107E Davison Building
Durham, NC 27710
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC204080-2023
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$100 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 9/1/2023 and was due on 10/1/2023.The annual fee applies to the following construction site:
Green Level Mixed-Use Destination Center Medical Office Building Phase 1A
1210& 1216 Duke Health Cary PI, Cary, NC
Wake County
Certificate of Coverage No. NCC204080
NC Reference No. NCG01-2020-4080
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact me at toby.vinson@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs
Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612