Loading...
HomeMy WebLinkAboutRe_ _External_ Re_ HL-0011 DeArmon Road_401 permit application questions_finalWanucha, Dave From: Aliisa Harjuniemi <aliisa@cws-inc.net> Sent: Tuesday, October 10, 2023 2:50 PM To: Wanucha, Dave Cc: Perez, Douglas J CIV (USA) Subject: Re: [External] Re: HL-0011 DeArmon Road_401 permit application questions final Attachments: image002.png CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Correct. On Tue, Oct 10, 2023 at 1:24 PM Wanucha, Dave <dave.wanucha@deg.nc.gov> wrote: Hi Aliisa, OK, so you're proposing to replace the existing pipe(s) with a three -barrel box culvert and a pedestrian passageway. And, the 160' of riprap stabilization is permanent not temporary as was listed in the PCN. Correct? Dave Wanucha Environmental Specialist 11 Transportation Permitting Branch for NCDOT Divisions 9 and 11 Division of Water Resources, Department of Environmental Quality Office/Cell: (336) 403-5655 Dave.Wanucha@deg.nc.gov 0 ........u,... M......e...M M" �,.... w.......uoo...... ... m,,...A..... .00.o.. 1 From: Aliisa Harjuniemi <aliisa@cws-inc.net> Sent: Tuesday, October 10, 2023 11:41 AM To: Wanucha, Dave <dave.wanucha@deg.nc.gov> Subject: [External] Re: HL-0011 DeArmon Road Improvements_401 permit application questions CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Dave, The bank stabilization should be permanent impact along banks due to rip rap (but no loss of waters). The existing 46 If feet culvert will be replaced with a 100 feet box culvert. Sheets 4-7 in the permit drawings provide more details. Let me know if you need anything else. Thanks, On Fri, Oct 6, 2023 at 3:12 PM Wanucha, Dave <dave.wanucha@deg.nc.gov> wrote: Hi Aliisa, My first run through of the plans generated some questions. I cannot determine what you intend to do at Crossing 2. Please provide more detail as to existing conditions at Crossing 2 and what you are proposing. The plans show 160' of temporary bank stabilization at Crossing 2 (Stream A). What is the temporary stabilization for -- is it for riprap? Is the box culvert existing or is it proposed? The plans suggest it is proposed but you only show that a pipe is being replaced. Thanks for your assistance with the needed clarifications. Dave W. Dave Wanucha Environmentol Speciolist 11 Transportation Permitting Branch for NCDOT Divisions 9 and 11 Division of Water Resources, Department of Environmental Quality Office/Cell: (336) 403-5655 Dave.Wanucha@deg.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Aliisa Harjuniemi, PWS Project Manager Carolina Wetland Services, Inc. 3 550 E. Westinghouse Boulevard Charlotte, NC 28273 Direct: 980-259-1222 Office: 704-527-1177 www.cws-inc.net Aliisa Harjuniemi, PWS Project Manager Carolina Wetland Services, Inc. 550 E. Westinghouse Boulevard Charlotte, NC 28273 Direct: 980-259-1222 Office: 704-527-1177 www.cws-inc.net