HomeMy WebLinkAboutSW6230701_Supplement-EZ Form_20231013 SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name Dunn Operations Center
2 Project Area(ac) 34.32
3 Coastal Wetland Area(ac) _ 0
4 Surface Water Area(ac) _ 1.48
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? No
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond 2
14 Stormwater Wetland _
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title: Jeremy Wooster,PE,Technical Manager
28 Organization: McAdams
29 Street address: I 621 Hillsborough St.Ste 500
30 City,State,Zip: Raleigh,NC 27603
31 Phone number(s): 919-361-5000
32 Email: wooster@mcadamsco.com
Certification Statement.
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications,
operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
pQ . ��ss�o v•z = %�
4 SEAL t of Dealgmer.
048394
e- ',f- ;
.5" 4, *• /VGINE-• �\��
Soal Date