Loading...
HomeMy WebLinkAboutSW6230701_Supplement-EZ Form_20231013 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Dunn Operations Center 2 Project Area(ac) 34.32 3 Coastal Wetland Area(ac) _ 0 4 Surface Water Area(ac) _ 1.48 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? No 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland _ 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jeremy Wooster,PE,Technical Manager 28 Organization: McAdams 29 Street address: I 621 Hillsborough St.Ste 500 30 City,State,Zip: Raleigh,NC 27603 31 Phone number(s): 919-361-5000 32 Email: wooster@mcadamsco.com Certification Statement. I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer pQ . ��ss�o v•z = %� 4 SEAL t of Dealgmer. 048394 e- ',f- ; .5" 4, *• /VGINE-• �\�� Soal Date