Loading...
HomeMy WebLinkAboutSite_Inspection_20210446_10_11_2023_401Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20210446 TPB NCDOT - Replace Bridge 57 and 59 on US 29-601 (B-5808)Cabarrus TPB NCDOT - Replace Bridge 57 and 59 on US 29-601 (B-5808) NC DOT Division 10 10/11/2023 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Mooresville Longitude:-80° 36' 48''+35° 24' 54'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Mary B Plummer 704-235-2193 Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20210446 10/11/2023 Canipe, Brett Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Met with DEO, First Meeting/Inspection, 4th Quarter 2023 inspection.Comment: page:2