Loading...
HomeMy WebLinkAbout310835_Compliance Evaluation Inspection_20231012 (2)ivision of Water Resources Facility Number 3 / 72 5 O Division of Soil and Water Conservation O Other Agency Type of Visit: (�'Compliance Inspection 0 Operation Review Q Structure Evaluation 0 Technical Assistance Reason for Visit: (fRoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: p// Z Arrival Time: /0 Departure Time: a t — County: Farm Name: eyllipincr k:41i"51 �hc Owner Email: Owner Name: Mailing Address: Physical Address: Phone: Facility Contact: Title: Onsite Representative: Certified Operator: U);UrLtr++ %died{"Jt. Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Boars Other Latitude: Phone: Integrator: Region: WI)2e Certification Number: l °( 6$ 9 Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IN Non-- Layer Poults Design Current Discharges and Stream Impacts L Is any discharge observed from any part of the operation? ,. Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes PTI�O ❑ NA ❑ NE ❑ Yes [:]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: -3 - 725 Date of Inspection: Co /z/2j Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [Z No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes RrNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [2 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [Z No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Eallo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes Zf No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes g No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes E3'No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes RrNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 0 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes allo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? B Yes ❑ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 2No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 2 Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ® Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rambreakers on irrigation equipment? ❑ Yes ❑ No ❑ Yes [✓J'No ❑NA ❑NE ❑ Weather Code QSludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 511212020 Continued Facilit Number: 31 - TZ Date of Inspection: la /z/23 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes Q No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. V Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ® No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No ZNA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 2 No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 2 No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes Q No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA 2NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [2 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes Q No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). t. uarCl5 G^P't M/irsf-7 oNCe Yrceivea Jehq/ �0 04�V_Ime.4`Jefnzz�@ • /U,ssiti� Soil Ah'%/ySis Cry yie/ Reviewer/Inspector Name: /"b{(,�?QP�Orz7,-) Phone: `r/0.7y2. $(SS Reviewer/Inspector Signature: Yr --� Date: 0117-1 Z3 Page 3 of 3 511212020