Loading...
HomeMy WebLinkAboutWQ0004181_Staff Report_20230912DWR Division of Water Resources September 12, 2023 To: Aquifer Protection Section Central Office Attn: Alys Hannum From: Robert Tankard Washington Regional Office L GENERAL SITE VISIT INFORMATION 1. Was a site visit conducted? ® Yes or ❑ No a. Date of site visit: March 8, 2022 b. Site visit conducted by: Robert Tankard and Victoria Herdt c. Inspection report attached? ❑ Yes or ® No Aquifer Protection Section Regional Staff Report Application No.: WQ0004181 d. Person contacted: Mary Watkins and their contact information: (252) 494-2002 ext. e. Driving directions: Directions are good in BIMS II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ® N/A ORC: Certificate #: Backup ORC: Certificate #: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ® Yes or ❑ No If no, please explain: Description of existing facilities: The facility consists of a septic tank, recirculating sand filter, and chlorination system and spray field Proposed flow: 360 gpd Current permitted flow: 360 gpd Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: FORM: APSRSR 04-10 Page 1 of 3 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ® Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude C I II C I II C C C C 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ❑ Yes or ❑ No Please summarize any findings resulting from this review: Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑ Yes or ® No If yes, please explain: 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ❑ N/A If no, please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes® No ❑ N/A If yes, please explain: 16. Possible toxic impacts to surface waters: 17. Pretreatment Program (POTWs only): FORM: APSRSR 04-10 Page 2 of 3 III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would like APS Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ® Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ❑ Issue ❑ Deny (Please state reasons: ) 6. Signature of report preparer: 14" TOW." Signature of APS regional supervisor: Roz T,ia+" Date: 9/12/2023 IV. ADDITIONAL REGIONAL STAFF REVIEW FORM: APSRSR 04-10 Page 3 of 3