Dear Ms. Charles:
NORTH CAROLINA
Environmental Quality
October 12, 2023
SUBJECT: Authorization to Construct
A to C No. 024970A16
McAlpine Creek Wastewater Management Facility
NPDES Permit No. NCO024970
A letter of request for an Authorization to Construct was received August 1, 2023, by the
Division of Water Resources (Division). With additional information received on September 27,
2023, final plans and specifications for the subject project have been reviewed and found to be
satisfactory. Authorization is hereby granted for the construction of modifications to the existing
64.0 MGD McAlpine Creek Wastewater Management Facility, with discharge of treated
wastewater into the McAlpine Creek in the Catawba River Basin.
This authorization results in no increase in design or permitted capacity and is awarded for
the construction of the following specific modifications:
Construction of modification to MH-28 and MH-12A, installation of new 48" pipe between
MH-28 and MH-12A, and all necessary piping and controls; in conformity with the project
plans, specifications, and other supporting documentation comprising the ATC Permit
Application package submitted to the Department of Environmental Quality.
This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No.
NCO024970 issued effective October 1, 2017, and shall be subject to revocation unless the
wastewater treatment facilities are constructed in accordance with the conditions and limitations
specified in Permit No. NC0024970.
It is the Owner's responsibility to ensure that the as -constructed project meets the
requirements of all applicable regulations and statutes, the ATC Permit Application package, and
all of the requirements contained herein. Failure to comply may result in penalties in accordance
with North Carolina General Statute § 143-215.6A through § 143-215.6C.
North Carolina Department of Environmental Quality I Division of Water Resources
D � 512 North Salisbury Street 11611 Mail Service Center I Raleigh, North Carolina 27699-1611
NORTH CARCLINA ^ 919.707.9000
DocuSign Envelope ID: 9C40EE94-5D4E-4416-BDB3-D674688212AE
Ms. Charles, Director of Utilities
October 11, 2023
Page 2 of 3
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Mooresville Regional Office, telephone number 704-633-1699, shall be notified at
least forty-eight (48) hours in advance of operation of the installed facilities so that an on -site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a Professional Engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit and the ATC Permit Application package.
Mail the Certification to: Division of Water Resources, WQ Permitting — NPDES, 1617 Mail
Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0201. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0204.
A copy of the project plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the Permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance with
the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina
Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in compliance with these Acts.
DocuSign Envelope ID: 9C40EE94-5D4E-4416-BDB3-D674688212AE
Ms. Charles, Director of Utilities
October 11, 2023
Page 3 of 3
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
The issuance of this ATC does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Amir Adaryani at
telephone number (919) 707-3704 or by email at amir.adaryani@deq.nc.gov.
Sincerely,
IV
DocuSigned by:
6+S NwAm.
CE9CD2D3C45B4D4...
for Richard E. Rogers, Jr.
Director, Division of Water Resources
by Douglas Dowden
Supervisor, NPDES Industrial Permitting Unit
Attachments: Engineer's Certification
cc: NPDES Files
ecopy: Grant Sharpe, PE
Brown and Caldwell
Email: gsharpe@brwncald.com
DWR Mooresville Regional Office, Water Quality Programs
Without Engineer's Certificate attached:
cc: Mecklenburg County Health
ecopy: DWI/Julia Byrd
Charlotte Water
McAlpine Creek Wastewater Management Facility
Authorization to Construct No. 024970A16
Issued October 11, 2023
NPDES Permit No. NC0024970
Engineer's Certification
I, , as a duly registered Professional Engineer in
the State of North Carolina, having been authorized to observe (periodically/weekly/full time)
the construction of the modifications and improvements to the McAlpine Creek Wastewater
Treatment Plant, located in Mecklenburg County, hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the following construction:
Construction of modification to MH-28 and MH-12A, installation of new 48"
pipe between MH-28 and MH-12A, and all necessary piping and controls; in
conformity with the project plans, specifications, and other supporting
documentation comprising the ATC Permit Application package submitted to the
Department of Environmental Quality.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance, intent and in conformity with all applicable regulations and statutes and
the project plans, specifications, and other supporting documentation comprising the
Authorization to Construct Permit Application package.
Signature
Date
Mail this Certification to: Attn: Ori Tuvia
Registration No.
NPDES Industrial Permitting Unit
DEQ/DWR/Water Quality Programs
1617 Mail Service Center
Raleigh, NC 27699-1617
SEAL