Loading...
HomeMy WebLinkAboutNCC204107_NOT Closeout Documents_20231009 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 County: Cumberland Project: PNG Fayetteville Operations Center River basin: Cape Fear Person financially responsible:Piedmont Natural Gas Company,Inc.-Eric J Project#: CUMBE-2021-010 Rouse,Director Land Services NCC204107 Address: 4720 Piedmont Row Drive,Suite 100,Charlotte,NC 28210 1. Project Location: Wilkes Road,Fayetteville Pictures: No 2. Weather and soil conditions: dry,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Sam Marshall,Eddy Hargrove,Joe Williams Title: Project Mgr.,Site Mgr.,Contractor Inspection report: Sent Report Date given/sent: November 15,2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: November 09,2021 Time arriving on site: 2:00 PM Time leaving site: 2:12 PM cc: Sam Marshall,Eddy Hagwood,Joe Williams(via email)