HomeMy WebLinkAbout20231308 Ver 1_More Info Received_20231011 (2)Ernest Boys — Lake Summit
Retaining Wall Project
DWR Project # 20231308
Full
La ke
(At Full Pond/ Normal Water Level)
Material / Blocks to be utilized are a precast
modular concrete block. The brand is called
RIP RAP on RediRock and can be viewed at redi-rock.com.
waterward Total Length approx.
side of -,.
retaining wall so
Pored/ Normal Water kei jjLj
Shoreline
Will back fill soil
behind wall on
land side to level
with retaining
wall - approx. 3ft
+/- from existing
shore line
Plan View
36in H x 28in D x 185ft L
Approx. 8in - 10in Below
full pond/NWL
Total Length approx.
36in H x 28in D x 185ft L
Approx. 26in - 28in
Above
ov� II pond NWL _
r
3ft. bank
height
8in —10in
below full
pond water
level/NWL
Roughly 3ft + badfill to
retaining wall to
level to shoreline
bank
Material / Blocks to be utilized are a precast
RIP RAP on modular concrete block. The brand is called
waterward
side of �u RediRock and can be viewed at redi-rock.com.
retaining wall rp >
cO
{At Full Pond/ NorrnaI Water Level) M
0
to —
E
L
O
Z
Side View
U-