Loading...
HomeMy WebLinkAbout20231308 Ver 1_More Info Received_20231011 (2)Ernest Boys — Lake Summit Retaining Wall Project DWR Project # 20231308 Full La ke (At Full Pond/ Normal Water Level) Material / Blocks to be utilized are a precast modular concrete block. The brand is called RIP RAP on RediRock and can be viewed at redi-rock.com. waterward Total Length approx. side of -,. retaining wall so Pored/ Normal Water kei jjLj Shoreline Will back fill soil behind wall on land side to level with retaining wall - approx. 3ft +/- from existing shore line Plan View 36in H x 28in D x 185ft L Approx. 8in - 10in Below full pond/NWL Total Length approx. 36in H x 28in D x 185ft L Approx. 26in - 28in Above ov� II pond NWL _ r 3ft. bank height 8in —10in below full pond water level/NWL Roughly 3ft + badfill to retaining wall to level to shoreline bank Material / Blocks to be utilized are a precast RIP RAP on modular concrete block. The brand is called waterward side of �u RediRock and can be viewed at redi-rock.com. retaining wall rp > cO {At Full Pond/ NorrnaI Water Level) M 0 to — E L O Z Side View U-