HomeMy WebLinkAbout20231308 Ver 1_More Info Received_20231010 (3)Ernest Boys — Lake Summit
Retaining Wall Project
DWR Project # 20231308
Full
La ke
(At Full Pond/ Normal Water Level)
Material / Blocks to be utilized are a precast
modular concrete block. The brand is called
RediRock and can be viewed at redi-rock.com.
Total Length approx.
-� 36in H x 28in D x 185ft L
Approx. 8in - 10in Below
AIR full pond/NWL
Total Length approx.
36in H x 28in D x 185ft L
Approx. 26in - 28in
Pored Normal Water ei Above ful d NWL_
Shoreline
Will back fill soil
behind wall on
land side to level
with retaining
wall — approx. 3ft
+/- from existing
shore line
Plan
r
3ft. bank
height
8in —10in
below full
pond water
level/NWL
Roughly 3ft + badfill to
retaining wall to
level to shoreline
bank
Material / Blocks to be utilized are a precast
modular concrete block. The brand is called
RediRock and can be viewed at redi-rock.com.
J
Lake
(At Full Pond/ Normal Water Level) M
E
-
L
❑
Z
un
Side View
U-