Loading...
HomeMy WebLinkAboutCreeping Swamp C-D BPDP Second RevisionsFrom:Hartshorn, Blake To:Menefee-Dunn, Barbara A Subject:FW: Creeping Swamp C-D BPDP Second Revisions Date:Wednesday, October 11, 2023 3:21:01 PM Attachments:image001.png DWR Comment Summary2_CreepingCD.pdf Hey Barbara, Can you upload this email along with the comment summary into LF in the 2022-0620v4 folder. It is a mitigation project and mitigation plan review. File name will be the email subject. Thank you Blake Hartshorn (he/him) Mitigation Specialist, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 707-3684 Cell: (919) 817-0360 blake.hartshorn@deq.nc.gov From: Hartshorn, Blake Sent: Wednesday, October 11, 2023 3:14 PM To: Jenkins, Barrett <Barrett.Jenkins@davey.com> Cc: Merritt, Katie <katie.merritt@deq.nc.gov> Subject: Creeping Swamp C-D BPDP Second Revisions Hey Barrett, Pursuant to Titles 15A NCAC 02B .0295 and 15A NCAC 02B .0703 (e), a provider shall submit a project plan proposal to the Division for review and approval that includes specific elements of the project. On September 23, 2023, Restoration Systems, LLC (RS) submitted a Bank Parcel Development Package (Plan) for the Creeping Swamp C-D Site, to the Division, for review and approval. According to the initial review by DWR staff of the subject Plan, some elements were either not provided, not explained thoroughly, not accurate or lacking in sufficient information. Therefore, until DWR receives an updated Plan addressing all comments and edits provided in the attached 1) comment summary and 2) PDF version of the document itself, DWR cannot finalize the review of the Plan or issue an approval of the Plan. In an effort to be as efficient as possible at providing comments to RS during this busy time, I have provided my comments in a unique format. Attached are the comments & edits provided within the actual PDF of a condensed Plan (without Appendices) as well as a comment summary. When RS is ready to submit their final project Plan, please include a summary of all responses by RS to the DWR comments acknowledging how RS addressed the comments. Please upload the final Plan using our Mitigation Project Information Upload Form through this link: https://edocs.deq.nc.gov/Forms/Mitigation_Information_Upload . Please note the DWR ID# 2022- 0620 (version 4) on all electronic submissions for this project. Thank you for your patience during this time and if you have any difficulty reading though the comments or edits please let Katie or I know. Blake Hartshorn (he/him) Mitigation Specialist, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 707-3684 Cell: (919) 817-0360 blake.hartshorn@deq.nc.gov Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Summary of Comments on 20220630 Ver 4_Draft II Creeping Swamp Phase CD BPDP 9.22.2023_20230923 Page: 18 Author: bhartshorn Subject: Sticky Note Date: 10/11/2023 3:06:26 PM This does not need to be broken out by the two phases. DWR just wants the overall total. Page: 19 Author: bhartshorn Subject: Sticky Note Date: 10/11/2023 3:05:48 PM Apologies if the initial comment on splitting the table was misleading. DWR still wants just one credit table for this project. Within the table have the first row say "Creeping Swamp Phase C" in the feature name with nothing else, then below that have the corresponding phase C features represented like you do in this credit table. Then in the same credit table have a row that says "Creeping Swamp Phase D" in the feature name with nothing else, then have the corresponding Phase D features represented like you do in the Phase D credit table. If this does not make sense please feel free to reach out for clarification. Page: 28 Author: bhartshorn Subject: Sticky Note Date: 10/11/2023 3:06:08 PM the measurement for determining credit assets within specific widths is taken perpendicular and landward from top of bank since that's our policy for measuring except under special circumstances