HomeMy WebLinkAboutCreeping Swamp BPDP Second RevisionFrom:Hartshorn, Blake
To:Menefee-Dunn, Barbara A
Subject:FW: Creeping Swamp BPDP Second revision
Date:Wednesday, October 11, 2023 3:19:55 PM
Attachments:image001.png
DWR Comment Summary2_CreepingA.pdf
Hey Barbara,
Can you upload this email along with the comment summary into LF in the 2022-0620v2 folder. It is
a mitigation project and mitigation plan review.
File name will be the email subject.
Thank you
Blake Hartshorn (he/him)
Mitigation Specialist, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (919) 707-3684
Cell: (919) 817-0360
blake.hartshorn@deq.nc.gov
From: Hartshorn, Blake
Sent: Wednesday, October 11, 2023 2:47 PM
To: Jenkins, Barrett <Barrett.Jenkins@davey.com>
Cc: Merritt, Katie <katie.merritt@deq.nc.gov>
Subject: Creeping Swamp BPDP Second revision
Hey Barrett,
Pursuant to Titles 15A NCAC 02B .0295 and 15A NCAC 02B .0703 (e), a provider shall submit a
project plan proposal to the Division for review and approval that includes specific elements of the
project. On September 23, 2023, Restoration Systems, LLC (RS) submitted a second revision Bank
Parcel Development Package (Plan) for the Creeping Swamp A Site, to the Division, for review and
approval. According to the initial review by DWR staff of the subject Plan, some elements were
either not provided, not explained thoroughly, not accurate or lacking in sufficient information.
Therefore, until DWR receives an updated Plan addressing all comments and edits provided in the
attached 1) comment summary and 2) PDF version of the document itself, DWR cannot finalize the
review of the Plan or issue an approval of the Plan. In an effort to be as efficient as possible at
providing comments to RS during this busy time, I have provided my comments in a unique format.
Attached are the comments & edits provided within the actual PDF of a condensed Plan (without
Appendices) as well as a comment summary.
When RS is ready to submit their final project Plan, please include a summary of all responses by RS
to the DWR comments acknowledging how RS addressed the comments. Please upload the final
Plan using our Mitigation Project Information Upload Form through this link:
https://edocs.deq.nc.gov/Forms/Mitigation_Information_Upload . Please note the DWR ID# 2022-
0620 (version 2) on all electronic submissions for this project.
Thank you for your patience during this time and if you have any difficulty reading though the
comments or edits please let Katie or I know.
Blake Hartshorn (he/him)
Mitigation Specialist, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (919) 707-3684
Cell: (919) 817-0360
blake.hartshorn@deq.nc.gov
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.
Summary of Comments on 20220620 Ver 2_Draft Creeping
Swamp Phase A BPDP Draft II 9.22.2023_20230923
Page: 17
Author: bhartshorn Subject: Sticky Note Date: 10/11/2023 2:40:07 PM
Update version is now missing, please have the version showing on Credit Tables
Page: 25
Author: bhartshorn Subject: Sticky Note Date: 10/11/2023 2:40:35 PM
the measurement for determining credit assets within specific widths is taken perpendicular and landward from top of bank since that's our policy
for measuring except under special circumstances