Loading...
HomeMy WebLinkAboutNCG120064_CEI_20230809 M 3 ROY COOPER Governor ELIZABETH S.BISER Secretary WILLIAM E.TOBY VINSONJR NORTH CAROLINA Interim Director Environmental Quality September 25, 2023 Chambers Development of NC Attn: Tyler Fitzgerald, District Manager 375 Dozer Drive Polkton, NC 28135 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG120000 Chambers Development of NC Anson Waste Management Facility, Certificate of Coverage NCG120064 Anson County Dear Mr. Fitzgerald: On August 9, 2023, a site inspection was conducted for the Anson Waste Management facility located at 375 Dozer Drive, Anson County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Hudson Dennis, Operations Supervisor and Brian Blalock, Gas Tank Technician were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG120000 under Certificate of Coverage NCG120064 permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Brown Creek, class C waters in the Yadkin River Basin(s) As a result of the inspection, the facility was found to be compliant with the conditions of the NCG120000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to$25,000 per day for each violation.If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at(910) 433-3384 or via e-mail at melissa.joyner@deq.nc.gov. Sincerely, A%lv Melissa Joyner Environmental Senior Specialist DEMLR Enclosure: Compliance Inspection Report ec: DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO— DEMLR, Stormwater Files �Q North Carolina.Department of Environmental Quality I Division of Energy,Mineral and Land Resources -- E Fayetteville Regional Office 1 225 Green Street,Suite 714 I Fayetteville,North Carolina 28301. w�Wm crsc,w,. oere�emEmm�weia,d� ./'�. 910.433.3300 Compliance Inspection Report Permit:NCG120064 - Effective: 07/01/21 Expiration: 06/30/26 Owner: Chambers Development of NC SOC: Effective: Expiration: Facility: Anson Waste Mgmt Facility County:Anson 375 Dozer Dr Region: Fayetteville Polkton NC 28135 Contact Person:Tyler Fitzgerald Title: District Manager Phone: 704-694-6900 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: NCG120094 Anson County Municipal Solid Waste Landfill-Anson County Municipal Solid Waste Landfill Inspection Date: 08/09/2023 Entry Time 10:30AM Exit Time: 02:OOPM Primary Inspector:Melissa A Joyner /W45 p" Phone: Secondary Inspector(s): Denise Bruce !� Evangelyn Lowery-Jacobs ,7JI1r7- Kelly Jonas Reason for Inspection: Routine 7 Inspection pe: Compliance Evaluation Permit Inspection Type: Landfill Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG120064 Owner-Facility:Chambers Development of NC Inspection Date: 08/09/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Melissa Joyner, Kelly Jonas, Denise Bruce and Evangelyn Lowery-Jacobs met with Tyler Fitzgerald, District Manager, Hudson Dennis, Operations Supervisor and Brian Blalock,Gas Tank Technician.to conduct an industrial stormwater inspection of the Anson Waste Management facility. The Stormwater Pollution Prevention Plan (SWPPP)was reviewed. Per the conditions in General Permit NCG120000 this permit is required to be reviewed annually, signed and dated by the reviewer and include the following annual updates.: 1.The Stormwater Pollution Prevention Team(if changes have occurred), 2. The Feasibility Study- per General Permit NCG120000, a review of the feasibility of changing methods of operations and/or storage practices to eliminate/reduce exposure of materials and processes to rainfall and runoff flow. If this not practical, a review of the feasibility of diverting stormwater runoff away from areas of potential contamination.; 3. Evaluation of Outfalls-checking for the presence/non-presence of non-stormwater discharges in the outfalls and certifying the evaluation results.; 4. Documentation of a list of significant spills or leaks that have occurred during the last 3 years and associated corrective actions taken or the notation that no spills have occurred. The significant spill information is included under the Spill Prevention and Response Procedures(SPRP)in the General Permit.All components of the SPRP should be included in the SWPPP.The Solvent Management Plan also needs to be updated annually and include all required information per the General Permit conditions. The Analytical and Qualitative Monitoring records were reviewed. More than 55 gallons of motor oil and/or hydraulic oil are being used per month when averaged over the calendar year by this facility.The information about the actual estimated new motor oil/hydraulic oil usage in gallons/per month has not been completed on the Stormwater Discharge Monitoring Report form. In March 2023,during the first quarter,there had been an exceedance of benchmark parameters for TSS at Outfall 3 and at Borrow North (Outfall 13), putting the facility into a Tier One status. Per General Permit NCG120000,Tier One Response/Actions had not occurred. Outfalls 1, 3, 4, 6, 9, 10, 11, 12 and 13 (Borrow North)and best management practices being utilized on the grounds of the facility were inspected and appeared in good condition.Due to time constraints the Aboveground Storage Tanks with their secondary containment were not able to be inspected.A follow-up inspection occurred on 8/30/2023 conducted by Melissa Joyner, Kelly Jonas and Denise Bruce for this purpose with no issues noted. Page 2 of 3 permit: NCG120064 Owner-Facility:Chambers Development of NC Inspection Date: 08/09/2023 Inspection Type:Compliance Evaluation Reason for visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? N ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? N ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan(SPRP)? 0 ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? N ❑ ❑ ❑ #Does the facility provide and document Employee Training? N ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ #Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? E ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3